How much would it cost to purchase the concrete necessary to construct a six-lane highway between Denver, Colorado, and Kansas City, Missouri? -width of the highway including shoulder is 12ft(3.6meter) -the thickness of the concrete is 11 inches. - Distance between 606 mi Denver, Colorado and Kansas City, Missouri -No bridges and mountains - Concrete costs $75 per cubic yard - Assume rebar [concrete reinforcing steel rods] occupies 5% of the volume of the ‘concrete’ in the highway - consider geographical and topographical constraints. Below is a typical highway cross-section. Note the 2% slope for water runoff.( image )
How much would it cost to purchase the concrete necessary to construct a six-lane highway between Denver, Colorado, and Kansas City, Missouri? -width of the highway including shoulder is 12ft(3.6meter) -the thickness of the concrete is 11 inches. - Distance between 606 mi Denver, Colorado and Kansas City, Missouri -No bridges and mountains - Concrete costs $75 per cubic yard - Assume rebar [concrete reinforcing steel rods] occupies 5% of the volume of the ‘concrete’ in the highway - consider geographical and topographical constraints. Below is a typical highway cross-section. Note the 2% slope for water runoff.( image )
Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter11: Pricing Concrete Work
Section: Chapter Questions
Problem 4RQ
Related questions
Question
How much would it cost to purchase the concrete necessary to construct a six-lane highway between Denver, Colorado, and Kansas City, Missouri?
-width of the highway including shoulder is 12ft(3.6meter)
-the thickness of the concrete is 11 inches.
- Distance between 606 mi Denver, Colorado and Kansas City, Missouri
-No bridges and mountains
- Concrete costs $75 per cubic yard
- Assume rebar [concrete reinforcing steel rods] occupies
5% of the volume of the ‘concrete’ in the highway
- consider geographical and topographical constraints.
Below is a typical highway cross-section. Note the 2% slope for water runoff.( image )
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 5 steps with 4 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,
Materials Science And Engineering Properties
Civil Engineering
ISBN:
9781111988609
Author:
Charles Gilmore
Publisher:
Cengage Learning