H.W1 Prepare a preliminary estimate of a project with an area of 2000 m², the project consists of building a four storied residential building each story is 3.5 m in height, given the following data It may be assumed that 15% of the project area will be taken up by constructing a pool and playground, 10% of the project area is specified for roads within the project, 25 % of the project area is taken for the residential building, 40 % of the project is specified for gardens and green area where 111 trees will be planted, the remaining 10% of the project is specified for the car parking area Furthermore the exterior and interior decorations of the four storied building will be %30 of the area of the residential building area. The residential building cost rate excluding decoration (without decoration) is 25 $/m³ The decoration cost rate itself is 75$/m² The green area cost rate is based on the number of trees planted where cost rate of each tree is 55 $/tree. The cost rate of the playground and pool area is 68$/ m² The road construction cost rate is 88 $/m if you consider the width of the roads are 3m. Calculate the total cost of the whole project in USD (Dollars) and IQD(Dinars) (assume 100$ 155000Dinars)? Please calculate the total costs with calculating the extras with them as below? Extra for special architectural treatment 0.5% of the total project cost. Extra due to deeper foundation at site 1% of of the total project cost. Extra for water supply and sanitary installation 8% of the total project cost. Extra for internal electrical installation 12.5% of the total project cost. Extra for other services 5% of the total project cost. Contingencies 2.5% of the total project cost. Supervision charges 10% of the total project cost.

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter16: Budget Estimating
Section: Chapter Questions
Problem 4RQ: Prepare a typical bay estimate based on the following information: a. Bay size of 350 feet and a...
icon
Related questions
Question
100%
H.W1
Prepare a preliminary estimate of a project with an area of 2000
m², the project consists of building a four storied residential
building each story is 3.5 m in height, given the following data
It may be assumed that 15% of the project area will be taken up
by constructing a pool and playground, 10% of the project area
is specified for roads within the project, 25 % of the project area
is taken for the residential building, 40 % of the project is
specified for gardens and green area where 111 trees will be
planted, the remaining 10% of the project is specified for the
car parking area Furthermore the exterior and interior
decorations of the four storied building will be %30 of the area
of the residential building area.
The residential building cost rate excluding decoration (without
decoration) is 25 $/m³
The decoration cost rate itself is 75$/m²
The green area cost rate is based on the number of trees planted
where cost rate of each tree is 55 $/tree.
The cost rate of the playground and pool area is 68$/ m²
The road construction cost rate is 88 $/m if you consider the
width of the roads are 3m.
Calculate the total cost of the whole project in USD (Dollars)
and IQD(Dinars) (assume 100$ 155000Dinars)? Please
calculate the total costs with calculating the extras with them as
below?
Extra for special architectural treatment 0.5% of the total project
cost.
Extra due to deeper foundation at site 1% of of the total project
cost.
Extra for water supply and sanitary installation 8% of the total
project cost.
Extra for internal electrical installation 12.5% of the total project
cost.
Extra for other services 5% of the total project cost.
Contingencies 2.5% of the total project cost.
Supervision charges 10% of the total project cost.
Transcribed Image Text:H.W1 Prepare a preliminary estimate of a project with an area of 2000 m², the project consists of building a four storied residential building each story is 3.5 m in height, given the following data It may be assumed that 15% of the project area will be taken up by constructing a pool and playground, 10% of the project area is specified for roads within the project, 25 % of the project area is taken for the residential building, 40 % of the project is specified for gardens and green area where 111 trees will be planted, the remaining 10% of the project is specified for the car parking area Furthermore the exterior and interior decorations of the four storied building will be %30 of the area of the residential building area. The residential building cost rate excluding decoration (without decoration) is 25 $/m³ The decoration cost rate itself is 75$/m² The green area cost rate is based on the number of trees planted where cost rate of each tree is 55 $/tree. The cost rate of the playground and pool area is 68$/ m² The road construction cost rate is 88 $/m if you consider the width of the roads are 3m. Calculate the total cost of the whole project in USD (Dollars) and IQD(Dinars) (assume 100$ 155000Dinars)? Please calculate the total costs with calculating the extras with them as below? Extra for special architectural treatment 0.5% of the total project cost. Extra due to deeper foundation at site 1% of of the total project cost. Extra for water supply and sanitary installation 8% of the total project cost. Extra for internal electrical installation 12.5% of the total project cost. Extra for other services 5% of the total project cost. Contingencies 2.5% of the total project cost. Supervision charges 10% of the total project cost.
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Units and measurements
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Construction Materials, Methods and Techniques (M…
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning