ing with all, government housing regulations and requirements, the employees union of a certain firm has the option to purchase either of two sites, each having an area of 18 hectares (180,000 sq.m.) of undeveloped land. The first singly owned, would cost Php20.00 a sq.m, but would needa roadway system, including the access road, 4,000 meters long, at a cost of Php 110.00 per meter. Additional development expenses would be Php 60,000 to subdivide and grade into 320 house löts, and another Php 32,000 for a hollow block fence and security gates. The second site consists of three lots, separately owned, with a total area of 18 hectares: 7 hectares at Php 25.00 a sq.m. 5 hectares at Php 21.00 a sq.m and 6 hectares at Php 14.00 a sq.m. The road system for this would be only 3,200 meters long at Php 100.00 per meter, but needs two box culverts each costing Php 25.000.00. Lot grading would be Php 35,000; fencing and security 8atës Phip 24,000. Assuming that all other facilities would cost the same in

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Problem 03 Complying with all, government housing regulations and requirements, the employees union of a certain firm has the option to purchase either of two sites, each having an area of 18 hectares (180,000 sq.m.) of undeveloped land. The first singly owned, would cost Php20.00 a sq.m, but would needa roadway system, including the access road, 4,000 meters long, at a cost of Php 110.00 per meter. Additional development expenses would be Php 60,000 to subdivide and grade into 320 house löts, and another Php 32,000 for a hollow block fence and security gates. The second site consists of three lots, separately owned, with a total area of 18 hectares: 7 hectares at Php 25.00 a sq.m. 5 hectares at Php 21.00 a sq.m and 6 hectares at Php 14.00 a sq.m. The road system for this would be only 3,200 meters long at Php 100.00 per meter, but needs two box culverts each costing Php 25.000.00. Lot grading would be Php 35,000; fencing and security 8atës Phip 24,000. Assuming that all other facilities would cost the same in both sites, which of the two sites would you recommend based on cost of site development alone?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Classification of legal structure
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning