### Excavator Productivity Calculation

#### Task:
Calculate the following based on the given excavator information:

1. **Hours required to complete 1000 cubic yards (CY) of excavation work.**
2. **Cost of the operator to complete the work if his hourly wage is $35.**

#### Production Information:
- **Bucket Capacity:** 3 cubic yards (CY)
- **Cycle of Operation:** 40 seconds per cycle
- **Efficiency:** 45 minutes of productive work per hour

#### Explanation:
- **Bucket Capacity:** This indicates the volume of earth the excavator can move in one cycle.
- **Cycle of Operation:** The time taken for the excavator to complete one full cycle of loading, moving, and unloading.
- **Efficiency:** The actual productive time within one hour, where the excavator is actively working.

To calculate the required hours and cost:
1. **Determine the total number of cycles needed.**
2. **Calculate the effective working hours required based on efficiency.**
3. **Compute the total cost using the operator's hourly wage.**
Transcribed Image Text:### Excavator Productivity Calculation #### Task: Calculate the following based on the given excavator information: 1. **Hours required to complete 1000 cubic yards (CY) of excavation work.** 2. **Cost of the operator to complete the work if his hourly wage is $35.** #### Production Information: - **Bucket Capacity:** 3 cubic yards (CY) - **Cycle of Operation:** 40 seconds per cycle - **Efficiency:** 45 minutes of productive work per hour #### Explanation: - **Bucket Capacity:** This indicates the volume of earth the excavator can move in one cycle. - **Cycle of Operation:** The time taken for the excavator to complete one full cycle of loading, moving, and unloading. - **Efficiency:** The actual productive time within one hour, where the excavator is actively working. To calculate the required hours and cost: 1. **Determine the total number of cycles needed.** 2. **Calculate the effective working hours required based on efficiency.** 3. **Compute the total cost using the operator's hourly wage.**
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning