1. The document requested by the owner as a protection against the risk of the contractor not accepting the job once awarded the project is (a). Insurance (b). Performance Bond (c). Bid Bond 2. Based on the guide quantity of 100 CY on a bid document for rock excavation, a contractor bid a unit price of $20/CY. If the owner's representative determined that the contractor excavated 85 CY of rock during construction, how much will the contractor gets paid? (a). $2000 (b). $1700 (c). $300 (d). $1800 3. Which of the following would not be considered an excusable delay? (a). Labor Strikes (b). Review process delays (c). A hurricane closing a port delaying delivery of materials (d). Death of a contractor

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%
1. The document requested by the owner as a protection against the risk of the
contractor not accepting the job once awarded the project is
(a). Insurance
(b). Performance Bond
(c). Bid Bond
2. Based on the guide quantity of 100 CY on a bid document for rock excavation, a
contractor bid a unit price of $20/CY. If the owner's representative determined
that the contractor excavated 85 CY of rock during construction, how much will
the contractor gets paid?
(a). $2000
(b). $1700
(c). $300
(d). $1800
3. Which of the following would not be considered an excusable delay?
(a). Labor Strikes
(b). Review process delays
(c). A hurricane closing a port delaying delivery of materials
(d). Death of a contractor
Transcribed Image Text:1. The document requested by the owner as a protection against the risk of the contractor not accepting the job once awarded the project is (a). Insurance (b). Performance Bond (c). Bid Bond 2. Based on the guide quantity of 100 CY on a bid document for rock excavation, a contractor bid a unit price of $20/CY. If the owner's representative determined that the contractor excavated 85 CY of rock during construction, how much will the contractor gets paid? (a). $2000 (b). $1700 (c). $300 (d). $1800 3. Which of the following would not be considered an excusable delay? (a). Labor Strikes (b). Review process delays (c). A hurricane closing a port delaying delivery of materials (d). Death of a contractor
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Issues during construction
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning