Given below is the Activity list for a Project with the duration in weeks and Predecessor activities. (40 marks) Activity Duration (Weeks) Preceding Activity A 2 None B 3 A C 2 A D 3 A E F 2 C 3 B.D G 5 B.C H 3 F.G I 2 G.H You are required to: Draw the Activity- on-Arrow diagram for the above activity list. (20 marks) b. Perform the forward pass and backward pass methods to identify: i. Early start time (EST) and Early finish time (EFT) (10 marks) ii. Least Start Time (LST) and Least Finish Time (LFT) (10 marks) Note: EST, EFT and LST, LFT calculation are based on Activity-on-Arrow network diagram. If the network diagram is wrongly drawn subsequent calculation will not be considered.

MATLAB: An Introduction with Applications
6th Edition
ISBN:9781119256830
Author:Amos Gilat
Publisher:Amos Gilat
Chapter1: Starting With Matlab
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Given below is the Activity list for a Project with the duration in weeks and Predecessor
activities.
(40 marks)
Activity
Duration (Weeks)
Preceding Activity
A
2
None
B
3
A
C
2
A
D
3
A
E F
2
C
3
B.D
G
5
B.C
H
3
F.G
I
2
G.H
You are required to:
Draw the Activity- on-Arrow diagram for the above activity list.
(20 marks)
b. Perform the forward pass and backward pass methods to identify:
i.
Early start time (EST) and Early finish time (EFT)
(10 marks)
ii.
Least Start Time (LST) and Least Finish Time (LFT)
(10 marks)
Note: EST, EFT and LST, LFT calculation are based on Activity-on-Arrow network diagram. If the
network diagram is wrongly drawn subsequent calculation will not be considered.
Transcribed Image Text:Given below is the Activity list for a Project with the duration in weeks and Predecessor activities. (40 marks) Activity Duration (Weeks) Preceding Activity A 2 None B 3 A C 2 A D 3 A E F 2 C 3 B.D G 5 B.C H 3 F.G I 2 G.H You are required to: Draw the Activity- on-Arrow diagram for the above activity list. (20 marks) b. Perform the forward pass and backward pass methods to identify: i. Early start time (EST) and Early finish time (EFT) (10 marks) ii. Least Start Time (LST) and Least Finish Time (LFT) (10 marks) Note: EST, EFT and LST, LFT calculation are based on Activity-on-Arrow network diagram. If the network diagram is wrongly drawn subsequent calculation will not be considered.
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Similar questions
Recommended textbooks for you
MATLAB: An Introduction with Applications
MATLAB: An Introduction with Applications
Statistics
ISBN:
9781119256830
Author:
Amos Gilat
Publisher:
John Wiley & Sons Inc
Probability and Statistics for Engineering and th…
Probability and Statistics for Engineering and th…
Statistics
ISBN:
9781305251809
Author:
Jay L. Devore
Publisher:
Cengage Learning
Statistics for The Behavioral Sciences (MindTap C…
Statistics for The Behavioral Sciences (MindTap C…
Statistics
ISBN:
9781305504912
Author:
Frederick J Gravetter, Larry B. Wallnau
Publisher:
Cengage Learning
Elementary Statistics: Picturing the World (7th E…
Elementary Statistics: Picturing the World (7th E…
Statistics
ISBN:
9780134683416
Author:
Ron Larson, Betsy Farber
Publisher:
PEARSON
The Basic Practice of Statistics
The Basic Practice of Statistics
Statistics
ISBN:
9781319042578
Author:
David S. Moore, William I. Notz, Michael A. Fligner
Publisher:
W. H. Freeman
Introduction to the Practice of Statistics
Introduction to the Practice of Statistics
Statistics
ISBN:
9781319013387
Author:
David S. Moore, George P. McCabe, Bruce A. Craig
Publisher:
W. H. Freeman