Generator G: 120 MVA, 20 kV, synchronous impedance Zs = 0.2 +j 1.2 2/phase Y. Transformers: T1: 150 MVA, 20A/138Y kV, per phase winding resistance and leakage reactance of the high voltage side: R = 202, X = 5. T2: 150 MVA, 138Y/ 13.8 YkV, per phase winding resistance and leakage reactance of the high voltage side: R = 1.82, X = 4. Transmission line: z = 0.04 +j 0.1 2/km, y = j 4×106 S/km, length = 100 km. Load: 100 MW +j 40 Mvar (constant power load). (1) T1 transmission line AY T2 m Y Y FIGURE E4-1 Load A system base of 100 MVA, 20 kV chosen on the low voltage side of transformer T1. Use the nominal- circuit model for the transmission line. Solve the power flow problem for this system and find the following 1) The load (bus 4) voltage. 2) The transmission line currents at the sending and receiving ends. 3) The real and reactive power supplied by the generator at bus 1. for these cases: starting from 20% of the nominal value given above, load power is increased in steps of 20% up to the nominal value. Σ = 10 100 mVA V=20kV Zs=al+jo.2 SG=120 MVA Pu = 2012 DY ++ 20/138k | Z₁₁ = 2 +5 j STI = 150 MVA 2 126 = 1381² 2b= 120m = 3.33 0.1 70.2 Pu =0.03+0.06 3.33 2 TI Pu 25 Pa b Pu now Zmew= Zold Sb old 150 -=126.96 =0.015+j 0039 Pu = ZTLold TI-new ZLine 0.04 +01 Yin = 74x100 5xm ( Zline =0.01 +10.026 Y 6 pu → 25 new = (0.03 +0.06j) (1000) n² =0.025+1005 Pu_0.04+10.1 126.96 -6 YY m 138/13.8V 100+407 ZT2=1.8Hj STOMYA pu_18443 = -0.0140031 Y pu=14x100 - 14×106126.96 Pu Line Yb = b Pu=0000315+0.000787 2Line Pu old YP = 0.000507 new Line pu_new Line 126.96 pu-new (272 =0.003+10.021 = 0.00021+10.00053 Pu-new Y line = 0.00076
Generator G: 120 MVA, 20 kV, synchronous impedance Zs = 0.2 +j 1.2 2/phase Y. Transformers: T1: 150 MVA, 20A/138Y kV, per phase winding resistance and leakage reactance of the high voltage side: R = 202, X = 5. T2: 150 MVA, 138Y/ 13.8 YkV, per phase winding resistance and leakage reactance of the high voltage side: R = 1.82, X = 4. Transmission line: z = 0.04 +j 0.1 2/km, y = j 4×106 S/km, length = 100 km. Load: 100 MW +j 40 Mvar (constant power load). (1) T1 transmission line AY T2 m Y Y FIGURE E4-1 Load A system base of 100 MVA, 20 kV chosen on the low voltage side of transformer T1. Use the nominal- circuit model for the transmission line. Solve the power flow problem for this system and find the following 1) The load (bus 4) voltage. 2) The transmission line currents at the sending and receiving ends. 3) The real and reactive power supplied by the generator at bus 1. for these cases: starting from 20% of the nominal value given above, load power is increased in steps of 20% up to the nominal value. Σ = 10 100 mVA V=20kV Zs=al+jo.2 SG=120 MVA Pu = 2012 DY ++ 20/138k | Z₁₁ = 2 +5 j STI = 150 MVA 2 126 = 1381² 2b= 120m = 3.33 0.1 70.2 Pu =0.03+0.06 3.33 2 TI Pu 25 Pa b Pu now Zmew= Zold Sb old 150 -=126.96 =0.015+j 0039 Pu = ZTLold TI-new ZLine 0.04 +01 Yin = 74x100 5xm ( Zline =0.01 +10.026 Y 6 pu → 25 new = (0.03 +0.06j) (1000) n² =0.025+1005 Pu_0.04+10.1 126.96 -6 YY m 138/13.8V 100+407 ZT2=1.8Hj STOMYA pu_18443 = -0.0140031 Y pu=14x100 - 14×106126.96 Pu Line Yb = b Pu=0000315+0.000787 2Line Pu old YP = 0.000507 new Line pu_new Line 126.96 pu-new (272 =0.003+10.021 = 0.00021+10.00053 Pu-new Y line = 0.00076
Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter3: Power Transformers
Section: Chapter Questions
Problem 3.36P: Three single-phase two-winding transformers, each rated 25MVA,34.5/13.8kV, are connected to form a...
Related questions
Question
please solve questions 1,2 and 3 fully step by step handwritten solution and alos please no ai thank you!
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 8 images
Similar questions
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning