From the following table of information, draw the network diagram, identify the ES, EF, LS, LF, TF, FF and critical path of the project. Also answer the questions hereunder: Manpower Leveling: 1. For Partially leveled schedule, what is the highest number of manpower are Peak duration? 2. For completely leveled schedule, what is the average number of manpower? Cost Crashing: 1. What is the total least duration if all critical path is crashed? 2. What is the project optimum cost? Activity A с D B E F I ધવ H K Precedes C, B D I I E J J END H K END No. of Manpower 10 20 12 15 NONTON 25 10 17 Duration (days) Normal Crash 4 12 2 5 3 8 12 9 1 3 15 3 9 1 4 2 7 10 7 0 2 10 Cost (Php) Normal 2,000 4,000 2,000 8,000 2,000 10,000 6,000 6,000 4,000 3,000 5,000 Crash 2,500 6,100 2,400 8,800 2,400 11,000 6,600 7,200 4,000 3,450 10,500 Cost to expedite per day 500 700 400 800 400 1000 300 600 0 450 1,100

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%
From the following table of information, draw the network diagram, identify
the ES, EF, LS, LF, TF, FF and critical path of the project. Also answer the
questions hereunder:
Manpower Leveling:
1. For Partially leveled schedule, what is the highest number of manpower are
Peak duration?
2. For completely leveled schedule, what is the average number of
manpower?
Cost Crashing:
1. What is the total least duration if all critical path is crashed?
2. What is the project optimum cost?
Activity Precedes
A
с
D
B
E
F
I
J
GHK
Н
C, B
AHHE
J
J
END
H
K
END
No. of
Manpower
989252
10
20
12
15
10
3
9
17
Duration (days)
Normal
Crash
4
12
2
5
3
8
12
9
1
3
15
3
9
1
4
2
7
10
ONOLO
7
0
10
Cost (Php)
Normal
2,000
4,000
2,000
8,000
2,000
10,000
6,000
6,000
4,000
3,000
5,000
Crash
2,500
6,100
2,400
8,800
2,400
11,000
6, 600
7,200
4,000
3,450
10,500
Cost to
expedite
per day
500
700
400
800
400
1000
300
600
0
450
1,100
Transcribed Image Text:From the following table of information, draw the network diagram, identify the ES, EF, LS, LF, TF, FF and critical path of the project. Also answer the questions hereunder: Manpower Leveling: 1. For Partially leveled schedule, what is the highest number of manpower are Peak duration? 2. For completely leveled schedule, what is the average number of manpower? Cost Crashing: 1. What is the total least duration if all critical path is crashed? 2. What is the project optimum cost? Activity Precedes A с D B E F I J GHK Н C, B AHHE J J END H K END No. of Manpower 989252 10 20 12 15 10 3 9 17 Duration (days) Normal Crash 4 12 2 5 3 8 12 9 1 3 15 3 9 1 4 2 7 10 ONOLO 7 0 10 Cost (Php) Normal 2,000 4,000 2,000 8,000 2,000 10,000 6,000 6,000 4,000 3,000 5,000 Crash 2,500 6,100 2,400 8,800 2,400 11,000 6, 600 7,200 4,000 3,450 10,500 Cost to expedite per day 500 700 400 800 400 1000 300 600 0 450 1,100
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Measuring sitework, excavation and piling
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning