From given Fence plan and its section below, fill up given table below of Abstract Estimation for a (Load bearing type structure) by Centre Line Method Notes: - ● Lintels cross-section over a Door (h=0.25 x b-0.4) m ● Excessive length @each side end of a lintel = 0.20m Door dimension D (2.15x1.1) m. Frame thickness of the Door= 0.06m There is not SKIRITING applied to the Wall ● Density of Sand 1460kg/m³ ● Density of Aggregate 2900kg/m³ ● Redraw the Table below, the results must be added in the Table. 3.1m -6m- * 3m Cement Plastering. Mortar (1:1.4) Cement Plastering, Mortar (1:1.4) -Concrete Block 20x20x40, Mortar (1:1.25) 0.6m DPC 1:1.3:2 -Tiles and Mortar -CC 1:24 @10cm NGL 0.0m -Solid Concrete Block 15 Cement Mortar (1:1.15) -0.75m V 2.4m 1m .. 0.4m- Plan of Wall 146 131⁰ Series Item 1 Earth Work Excavation for Foundation 2 Concrete Casting Foundation 1:1.5:3 3 Solid Concrete Block Wall 4 Filling up to NGL (Side Filling) 5 Concrete Block Wall for Super structure ********** 6 DPC 1:1.3:2 Unit Quantity m³ m³ m³ pl.a. m³ m³ m³ 400 600 Conorete Casting 1:1.5:3 -750- Section A-A Material 1 Cement in Kg Sand In Kg Aggregate in Kg Block in Nos **************** (
From given Fence plan and its section below, fill up given table below of Abstract Estimation for a (Load bearing type structure) by Centre Line Method Notes: - ● Lintels cross-section over a Door (h=0.25 x b-0.4) m ● Excessive length @each side end of a lintel = 0.20m Door dimension D (2.15x1.1) m. Frame thickness of the Door= 0.06m There is not SKIRITING applied to the Wall ● Density of Sand 1460kg/m³ ● Density of Aggregate 2900kg/m³ ● Redraw the Table below, the results must be added in the Table. 3.1m -6m- * 3m Cement Plastering. Mortar (1:1.4) Cement Plastering, Mortar (1:1.4) -Concrete Block 20x20x40, Mortar (1:1.25) 0.6m DPC 1:1.3:2 -Tiles and Mortar -CC 1:24 @10cm NGL 0.0m -Solid Concrete Block 15 Cement Mortar (1:1.15) -0.75m V 2.4m 1m .. 0.4m- Plan of Wall 146 131⁰ Series Item 1 Earth Work Excavation for Foundation 2 Concrete Casting Foundation 1:1.5:3 3 Solid Concrete Block Wall 4 Filling up to NGL (Side Filling) 5 Concrete Block Wall for Super structure ********** 6 DPC 1:1.3:2 Unit Quantity m³ m³ m³ pl.a. m³ m³ m³ 400 600 Conorete Casting 1:1.5:3 -750- Section A-A Material 1 Cement in Kg Sand In Kg Aggregate in Kg Block in Nos **************** (
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question
100%

Transcribed Image Text:MAN
From given Fence plan and its section below, fill up given table below of Abstract Estimation for a (Load bearin
type structure) by Centre Line Method
DSTE
Notes: -
Wanded
Lintels cross-section over a Door (h=0.25 x b=0.4) m
Excessive length @each side end of a lintel = 0.20m
undo unaim
Door dimension D (2.15x1.1) m. Frame thickness of the Door- 0.06m
There is not SKIRITING applied to the Wall
Density of Sand 1460kg/m³
Density of Aggregate 2900kg/m³
Redraw the Table below, the results must be added in the Table.
-6m
3.1m
Y......
3m
A
146⁹
Cement Plastering-
Mortar (1:1.4)
-Cement Plastering, Mortar (1:1.4)
Concrete Block 20x20x40, Mortar
(1:1.25)
0.6m
DPC 1:1.3:2
-Tiles and Mortar
-CC 1:24 @10cm
NGL 0.0m
-Solid Concrete Block 15
Cement Mortar (1:1.15)
-0.75m
2.4m 1m
0.4m
Series
1
2
3
4
5
6
Plan of Wall
131°
Item
Earth Work Excavation for Foundation
Concrete Casting Foundation 1:1.5:3
Solid Concrete Block Wall
Filling up to NGL (Side Filling)
Concrete Block Wall for Super structure
DPC 1:1.3:2
Unit Quantity
3
m ³
3
m²
3
m²
m³
3
m
m³
400+400+350.
400
600
-Concrete Casting 1:1.5:3
750
Section A-A
Material
3
Cement In Kg Sand In Kg Aggregate in Kg Block in Nos
·bod
Y
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 5 steps

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning