Estimate the time and cost for solar power plant project by using this WBS / work breakdown structure
Estimate the time and cost for solar power plant project by using this WBS / work breakdown structure
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question
Estimate the time and cost for solar power plant project by using this WBS / work breakdown structure

Transcribed Image Text:1.3 \1.4 Work Breakdown Structure
1.0
Solar power
1.1
1.3
1.4
1.2
construction
Project
management
Post
pre-
construction
Construction
1.3.1
1.3.2
1.3.3
1.3.4
mounting
equipment
1.1.1
solar panels
micro
electric
1.4.2
1.2.1
Planing
inverters
system
1.4.1
observation
Location
final inspection
1.3.2.1
documentation
1.1.2
1.2.2
Hardware
Goals
Design
1.3.2.2
1.3.4.4
1.2.3
sealants
wiring
Product data
sheet
1.2.4
permits
||
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps

Recommended textbooks for you

Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,

Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education

Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education

Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,

Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education

Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education


Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning

Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.