c) Compute the net quantities needed if there are 25 of the base and 100 of the clamp in stock. Base: units (enter your response as a whole number). Spring: units (enter your response as a whole number). Clamp: units (enter your response as a whole number). Housing: units (enter your response as a whole number). Handle: units (enter your response as a whole number). Casting: units (enter your response as a whole number). Bearing: units (enter your response as a whole number). Shaft: units (enter your response as a whole number).

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
answer in 30 minutes. answer only c part
c) Compute the net quantities needed if there are 25 of the base and 100 of the clamp in stock.
Base:
units (enter your response as a whole number).
Spring:
units (enter your response as a whole number).
Clamp:
units (enter your response as a whole number).
Housing:
units (enter your response as a whole number).
Handle:
units (enter your response as a whole number).
Casting:
units (enter your response as a whole number).
Bearing:
units (enter your response as a whole number).
Shaft:
units (enter your response as a whole number).
Transcribed Image Text:c) Compute the net quantities needed if there are 25 of the base and 100 of the clamp in stock. Base: units (enter your response as a whole number). Spring: units (enter your response as a whole number). Clamp: units (enter your response as a whole number). Housing: units (enter your response as a whole number). Handle: units (enter your response as a whole number). Casting: units (enter your response as a whole number). Bearing: units (enter your response as a whole number). Shaft: units (enter your response as a whole number).
As the production planner for Xiangling Hu Products, Inc, you have been given a bil of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled
from 1 clamp and 2 housings. Each clamp has 1 handle and 1 casting. Each housing has 2 bearings and 1 shat. There is no inventory on hand
a) Design a product struture noting the quantities for each iem and show the low-level coding. Match each number in the stuchure below with the corresponding tem.
Bracket
Number
tem
Springa
Housinga
Bast
Casting
Shal
IV
Clanpe
Clamp
11
Handle
Bearing
HandlenCastingko
IV
III
b) Determine the gross quantities needed of each item if you are to assemble 50 brackets.
Transcribed Image Text:As the production planner for Xiangling Hu Products, Inc, you have been given a bil of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled from 1 clamp and 2 housings. Each clamp has 1 handle and 1 casting. Each housing has 2 bearings and 1 shat. There is no inventory on hand a) Design a product struture noting the quantities for each iem and show the low-level coding. Match each number in the stuchure below with the corresponding tem. Bracket Number tem Springa Housinga Bast Casting Shal IV Clanpe Clamp 11 Handle Bearing HandlenCastingko IV III b) Determine the gross quantities needed of each item if you are to assemble 50 brackets.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.