An industry is proposing to construct a new coal-fired power plant that produces 2300 MW electricity with efficiency of 39%. Coal has a heating value of 10,750 Btu/lb, and contains a sulfur content of 2.4%. It is expected that 95% of sulfur will be converted to SO2. The New Source Performance Standards (NSPS) limits the SO2 emission rate from any coal-fired power plants to 1.2 lb/ 106 Btu heat input. Use the engineering calculation approach to determine the followings. a) Coal consumption rate in lb/hr b) SO2 emission rate in lb/hr c) Determine if the newly proposed power plant is required to install a flue gas desulfurization (FGD) process for SO2 removal from the flue gas. What percent SO2 removal is required?
An industry is proposing to construct a new coal-fired power plant that produces 2300 MW electricity with efficiency of 39%. Coal has a heating value of 10,750 Btu/lb, and contains a sulfur content of 2.4%. It is expected that 95% of sulfur will be converted to SO2. The New Source Performance Standards (NSPS) limits the SO2 emission rate from any coal-fired power plants to 1.2 lb/ 106 Btu heat input. Use the engineering calculation approach to determine the followings. a) Coal consumption rate in lb/hr b) SO2 emission rate in lb/hr c) Determine if the newly proposed power plant is required to install a flue gas desulfurization (FGD) process for SO2 removal from the flue gas. What percent SO2 removal is required?
Sustainable Energy
2nd Edition
ISBN:9781337551663
Author:DUNLAP, Richard A.
Publisher:DUNLAP, Richard A.
Chapter20: Hydrogen
Section: Chapter Questions
Problem 13P
Related questions
Question
![An industry is proposing to construct a new coal-fired power plant that produces 2300 MW
electricity with efficiency of 39%. Coal has a heating value of 10,750 Btu/lb, and contains a
sulfur content of 2.4%. It is expected that 95% of sulfur will be converted to SO2. The New
Source Performance Standards (NSPS) limits the SO2 emission rate from any coal-fired
power plants to 1.2 lb/ 106 Btu heat input. Use the engineering calculation approach to
determine the followings.
a) Coal consumption rate in lb/hr
b) SO2 emission rate in lb/hr
c) Determine if the newly proposed power plant is required to install a flue gas
desulfurization (FGD) process for SO2 removal from the flue gas. What percent SO2
removal is required?](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F6535a91a-6266-4849-a099-2f2dc49b0e75%2Fd24e9a35-c34a-414e-ad88-2ab67a1275a3%2Fb76o5o_processed.png&w=3840&q=75)
Transcribed Image Text:An industry is proposing to construct a new coal-fired power plant that produces 2300 MW
electricity with efficiency of 39%. Coal has a heating value of 10,750 Btu/lb, and contains a
sulfur content of 2.4%. It is expected that 95% of sulfur will be converted to SO2. The New
Source Performance Standards (NSPS) limits the SO2 emission rate from any coal-fired
power plants to 1.2 lb/ 106 Btu heat input. Use the engineering calculation approach to
determine the followings.
a) Coal consumption rate in lb/hr
b) SO2 emission rate in lb/hr
c) Determine if the newly proposed power plant is required to install a flue gas
desulfurization (FGD) process for SO2 removal from the flue gas. What percent SO2
removal is required?
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 1 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Recommended textbooks for you
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Solid Waste Engineering](https://www.bartleby.com/isbn_cover_images/9781305635203/9781305635203_smallCoverImage.gif)
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781133108689/9781133108689_smallCoverImage.gif)
Sustainable Energy
Civil Engineering
ISBN:
9781133108689
Author:
Richard A. Dunlap
Publisher:
Cengage Learning
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Solid Waste Engineering](https://www.bartleby.com/isbn_cover_images/9781305635203/9781305635203_smallCoverImage.gif)
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781133108689/9781133108689_smallCoverImage.gif)
Sustainable Energy
Civil Engineering
ISBN:
9781133108689
Author:
Richard A. Dunlap
Publisher:
Cengage Learning