An industrial robot performs a machine loading and unloading operation. A PLC is used as the cell controller. The cell operates as follows: (1) a human worker places a part into a nest, (2) the robot reaches over and picks up the part and places it into an induction heating coil, (3) a time of 10 sec is allowed for the heating operation, and (4) the robot reaches into the coil, retrieves the part, and places it on an outgoing conveyor. A limit switch X1 (normally open) is used to indicate that the part is in the nest in step (1). This energizes output contact Y1 to signal the robot to execute step (2) of the work cycle (this is an output contact for the PLC, but an input interlock signal for the robot controller). A photocell X2 is used to indicate that the part has been placed into the induction heating coil C1. Timer T1 is used to provide the 10-sec heating cycle in step (3), at the end of which, output contact Y2 is used to signal the robot to execute step (4). Construct the ladder logic diagram for the system.

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question

An industrial robot performs a machine loading and unloading operation. A PLC is used as the cell controller. The cell operates as follows: (1) a human worker places a part into a nest, (2) the robot reaches over and picks up the part and places it into an induction heating coil, (3) a time of 10 sec is allowed for the heating operation, and (4) the robot reaches into the coil, retrieves the part, and places it on an outgoing conveyor. A limit switch X1 (normally open) is used to indicate that the part is in the nest in step (1). This energizes output contact Y1 to signal the robot to execute step (2) of the work cycle (this is an output contact for the PLC, but an input interlock signal for the robot controller). A photocell X2 is used to indicate that the part has been placed into the induction heating coil C1. Timer T1 is used to provide the 10-sec heating cycle in step (3), at the end of which, output contact Y2 is used to signal the robot to execute step (4). Construct the ladder logic diagram for the system.

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Automation of Manufacturing Processes
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY