An industrial engineer is investigating the effect of four assembly methods (A, B, C, D) on the assembly time for a color television component. Four operators are selected for the study. Furthermore, the engineer knows that each assembly method produces such fatigue that the time required for the last assembly may be greater than the time required for the first, regardless of the method. That is, a trend develops in the required assembly time. To account for this source of variability, the engineer uses the Latin square design shown below. Analyze the data from this experiment ( = 0.05) draw appropriate conclusions by conducting hypothesis testing. Order of Operator Assembly 1 2 3 4 1 C=10 D=14 A=7 B=8 2 B=7 C=18 D=11 A=8 3 A=5 B=10 C=11 D=9 4 D=10 A=10 B=12 C=14
An industrial engineer is investigating the effect of four assembly methods (A, B, C, D) on the assembly time for a color television component. Four operators are selected for the study. Furthermore, the engineer knows that each assembly method produces such fatigue that the time required for the last assembly may be greater than the time required for the first, regardless of the method. That is, a trend develops in the required assembly time. To account for this source of variability, the engineer uses the Latin square design shown below. Analyze the data from this experiment ( = 0.05) draw appropriate conclusions by conducting hypothesis testing.
Order of |
|
|
Operator |
|
Assembly |
1 |
2 |
3 |
4 |
1 |
C=10 |
D=14 |
A=7 |
B=8 |
2 |
B=7 |
C=18 |
D=11 |
A=8 |
3 |
A=5 |
B=10 |
C=11 |
D=9 |
4 |
D=10 |
A=10 |
B=12 |
C=14 |
Trending now
This is a popular solution!
Step by step
Solved in 6 steps with 5 images