An electronics manufacturing process has a scheduled mean completion time of 75 minutes. It is claimed that, under new management, the mean completion time, μ, is less than 75 minutes. To test this claim, a random sample of 21 completion times under new management was taken.The sample had a mean completion time of 69 minutes and a standard deviation of 12 minutes. Assume that the population of completion times under new management is normally distributed. At the 0.05 level of significance, can it be concluded that the mean completion time, μ, under new management is less than the scheduled mean?Perform a one-tailed test. Then fill in the table below. Carry your intermediate computations to at least three decimal places and round your answers as specified in the table. The null hypothesis: H0: The alternative hypothesis: H1: The type of test statistic: (Choose one) Z t Chisquare F The value of the test statistic: (Round to at least three decimal places.) The critical value at the 0.05 level of significance: (Round to at least three decimal places.) At the 0.05level, can it be concluded that the mean completion time under new management is less than the scheduled mean? Yes No
An electronics manufacturing process has a scheduled mean completion time of 75 minutes. It is claimed that, under new management, the mean completion time, μ, is less than 75 minutes. To test this claim, a random sample of 21 completion times under new management was taken.The sample had a mean completion time of 69 minutes and a standard deviation of 12 minutes. Assume that the population of completion times under new management is
Carry your intermediate computations to at least three decimal places and round your answers as specified in the table.
The null hypothesis: |
H0:
|
|||
The alternative hypothesis: |
H1:
|
|||
The type of test statistic: |
(Choose one) Z t Chisquare F |
|||
The value of the test statistic: (Round to at least three decimal places.) |
|
|||
The critical value at the
0.05
(Round to at least three decimal places.) |
|
|||
At the 0.05level, can it be concluded that the mean completion time under new management is less than the scheduled mean? |
|
|
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 3 images