A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately​ from, and simultaneously​ with, the sawing and​ sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations​ (the operations are in​ parallel).   A) is the bottleneck. ​b) The bottleneck time is minutes per unit ​(round your response to two decimal​ places). ​c) The throughput time of the overall system is enter your response here minutes ​(round your response to two decimal​ places). D) If the firm operates 8 hours per​ day, 20 days per​ month, the monthly capacity of the manufacturing process is units ​(enter your response as a whole​ number).

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately​ from, and simultaneously​ with, the sawing and​ sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations​ (the operations are in​ parallel).
 
A) is the bottleneck.
​b) The bottleneck time is
minutes per unit ​(round your response to two decimal​ places).
​c) The throughput time of the overall system is
enter your response here
minutes ​(round your response to two decimal​ places).
D) If the firm operates 8 hours per​ day, 20 days per​ month, the monthly capacity of the manufacturing process is
units ​(enter your response as a whole​ number).
6 units/hr
Sawing
2.5 units/hr
Sanding
Drilling
1.8 units/hr
Welding
7 units/hr
Assembly
0.8 units/hr
Assembly
0.8 units/hr
Assembly
0.8 units/hr
Transcribed Image Text:6 units/hr Sawing 2.5 units/hr Sanding Drilling 1.8 units/hr Welding 7 units/hr Assembly 0.8 units/hr Assembly 0.8 units/hr Assembly 0.8 units/hr
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.