A power station has to meet the following demand: Group A: 200 kW between 8 A.M. and 6 P.M. Group B: 100 kW between 6 A.M and 10 A.M. Group C: 50 kW between 6 A.M. and 10 A.M. Group D: 100 kW between 10 AM and 6 PM. and then between 6 P.M. and 6 A.M. Plot the daily load curve and determine (i) diversity factor (ii) units generated per day (iii) load factor.
A power station has to meet the following demand: Group A: 200 kW between 8 A.M. and 6 P.M. Group B: 100 kW between 6 A.M and 10 A.M. Group C: 50 kW between 6 A.M. and 10 A.M. Group D: 100 kW between 10 AM and 6 PM. and then between 6 P.M. and 6 A.M. Plot the daily load curve and determine (i) diversity factor (ii) units generated per day (iii) load factor.
Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter12: Power System Controls
Section: Chapter Questions
Problem 12.7P
Related questions
Question
100%
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning