A new 4-mile long elevated roadway is constructed to give a direct traffic route from a major residential area over a swamp area to the industrial complex of a city. At present, those traveling from the residential area must take a 15-mile circuitous route either to the north or to the south of the swamp area. The travel time and cost is about the same for both. There are currently 3,000 vehicles on the north route and 4,000 on the south route on a daily basis. The new roadway is designed for a 30-year service-life and be tolled, which involves $40 million for construction and an additional $150,000 per year for toll collection. The toll rate is set at 60 cents per vehicle. Upon opening to traffic, the new roadway is expected to carry 20,000 vehicles per day. Those using the new roadway will drive an average of 2 miles to get to the entrance. Road maintenance costs in the county average $20,000 per mile per year. If vehicle operating costs average 14 cents per mile and the highway department uses an annual nominal discount rate of 5%, compounded continuously (i.e., compounded infinite times per year), what is the NPV of the project?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%

A new 4-mile long elevated roadway is constructed to give a direct traffic route from a major residential area over a swamp area to the industrial complex of a city. At present, those traveling from the residential area must take a 15-mile circuitous route either to the north or to the south of the swamp area. The travel time and cost is about the same for both. There are currently 3,000 vehicles on the north route and 4,000 on the south route on a daily basis. The new roadway is designed for a 30-year service-life and be tolled, which involves $40 million for construction and an additional $150,000 per year for toll collection. The toll rate is set at 60 cents per vehicle. Upon opening to traffic, the new roadway is expected to carry 20,000 vehicles per day. Those using the new roadway will drive an average of 2 miles to get to the entrance. Road maintenance costs in the county average $20,000 per mile per year. If vehicle operating costs average 14 cents per mile and the highway department uses an annual nominal discount rate of 5%, compounded continuously (i.e., compounded infinite times per year), what is the NPV of the project?

 

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Capacity and level of service at intersections
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning