QUESTION 13 60 10 15-min Volumes V 75 Lane Configurations What is the movement capacity of the left turn from the main street if the potential capacity is 1,238 veh/h?
Q: A portion of the extension of SLEX has a free flow speed of 60kph and a capacity of 3600 veh/hr. If…
A: Given Free flow speed ,Vf = 60 KPH Traffic capacity ,q = 3600 veh /hr
Q: During the peak hour, an urban freeway segment has a traffic flow of 6,000 veh/h, with 4,000…
A: During the peak hour, an urban freeway segment has a traffic flow of 6,000 veh/h, with 4,000…
Q: The normal flow of traffic on crossroads A and B are 400 and 250 vehicles per hour respectively. The…
A: given-Design a two-phase traffic system by Webster's method.
Q: If the density of traffic in Aurora Blvd. is 25 veh/km and the average headway is 4 sec., compute…
A:
Q: Consider the geometric and traffic characteristics shown below. Approach (Width) North (56 ft) South…
A: Since the solution for the given question is lengthy, so the first 6 parts will be solved below.…
Q: QUESTION 12 60 10 15-min Volumes 40 Lane Configurations Consider the left turn movement from main…
A: Potential Capacity: The potential capacity is the capacity of a roadway or a movement on a roadway…
Q: The peak hour factor for a traffic during rush hour is equal to 0.60 with a highest 5-min volume of…
A: Given, Peak hour factor (PHF) = 0.60 Highest volume, q = 250 veh Space mean speed, S = 90 kph
Q: A segment of a Class I two-lane highway is on rolling terrain and has an hourly volume of 600 veh/hr…
A: "Since you have posted a question with multiple sub-parts. We will solve the first three sub-parts…
Q: A new freeway ramp meter will be installed on the Medina onramp to westbound SR 520. There is 70 ft…
A: This average queue length is measured over a time interval that spans the sum of the last busy and…
Q: Traffic volume is 2578 veh/hr with 687 vehicles arriving in peak 15 minutes.There are tow lanes, 12…
A: Therefore, the analysis flow rate is 2578 vehicles per hour.Explanation:Step 1: To calculate the…
Q: Compute the peak hour factor if the hourly volume of traffic is 1800 vehicles/hour and the highest…
A: ANSWER:- Option (C) or 0.6
Q: A six-lane freeway (three lanes in each direction) in mountainous terrain has 10-ft lanes and…
A: The given data: lanes width=10 ft rolling terrain=4 % the peak-hour factor=0.84 To Determine the…
Q: The equivalent hourly flow rate for an approach with 125 vehicles in the peak 15 minutes
A: given n=number of vehicles passing a specified point in T seconds =125 T=15 min=(15x60sec)…
Q: 5. Design signal for the intersection shown in Figure 1. Assume no pedestrian activity. Assume amber…
A:
Q: There are 3 vehicles observed in a 100 m section of McArthur highway. If the average time headway is…
A: Given data:Length of segment=100 mAverage time headway=4 sec
Q: the There are 5 vehicles observed in a 100 m section of McArthur highway. If average time headway is…
A:
Q: 3. Determine the LOS for pedestrians at two-phase signalised intersection with a cycle length of 90…
A: C = 90 secg1 = 50 secg2 = 30 sec
Q: There are 9 vehicles observed in a 300 m section of McArthur highway. If the average time headway is…
A:
Q: Compute the peak hour factor if the hourly volume of traffic is 1800 vehicles/hour and the highest…
A:
Q: D. There are 10 vehicles observed in a 450 m length of Aurora Boulevard. If the average time headway…
A:
Q: the pavement edges. the traffic stream consists of cars, buses and large trucks (no recreational…
A: According to Given data A Four Lane freeway is located on rolling terrain with a free flow speed of…
Q: A freeway with flow rate ( VP) = 1600 %3D Pc/hr./In. and free flow speed = 55 mile/hr. the…
A: Given data: Flow Rate, Vp =1600 pc/hr/ln FFlow speed, S= 55 mi/hr
Q: Problem 2. Consider a freeway section with three lanes in each direction and with a length of 1.25mi…
A: First condition-Without Bus Removal: The peak hour volume is V=3800 veh/h. The total vehicles are,…
Q: The 15km Atta Mills road connecting Old Barrier to Kokrobite operates with a capacity of 2250 pcu/hr…
A:
Q: A 4-lane new urban freeway is suggested to be designed with the following data: F.ADT = 30000 vpd,…
A: Given:- A 4-lane new urban freeway is to be designed The average daily traffic (ADT) = 30000 vpd…
Q: A segment of rural freeway is being designed for a FFS of 65 mph using 11 ft lanes in a mountainous…
A: The given data is shown below: FFS=65mphLanes=11ftLateral clearance=1 ftDesign flow rate=2400…
Q: The rate of flow of traffic on south expressway is 1200 vehicles in one hour. Find the space mean…
A: Flow= 1200 vehicle per hour Density= 25 vehicle/ km
Q: Traffic volume count has been collected on a 2-lane road section which needs upgradation due to…
A: Given data: Maximum service flow rate per lane, MSF=1280 FHV=1 Peak hour factor, PHF=0.78125…
Q: A segment of a Class I two-lane highway is on rolling terrain and has an hourly volume of 600 veh/hr…
A:
Q: Analyze the unsignalized intersection below and calculate the optimum cycle length if the…
A:
Q: . Calculate the free-flow speed in m/s 2. Calculate the flow rate in the opposing direction…
A:
Q: Traffic volume count has been collected on a 2- lane road section which needs upgradation due to…
A:
Q: Q3. A new section of a freeway is to be designed with a free-flow-speed of 65 mph along of 0.75 mile…
A: Given that; Speed=65 mph0.75 on 5% gradeTraffic volume=4200 v/hrTraffic Composition:15% Truck5%…
Q: A rail transit system has prescribed the following factors: 1. Peak hour demand = 30000…
A: The peak hour demand = 30000 passengers/hr The minimum required speed = 55 ft/sec The deceleration =…
Q: A new section of a freeway is to be designed with a free-flow-speed of 65 mph along of 0.75 mile on…
A: Solution Given Data Speed = 65 mph 0.75 mile on 5% upgrade Traffic volume= 4200 v/hr Taffic…
Q: The average normal flow of traffic on cross roads A and B during design period are 400 and 250 pcu…
A:
Q: A freeway is to be designed as a passenger-car-only facility for an AADT of 35000 vehicles per day.…
A: AADT = 35000 veh/dayFree flow speed = 70 mphPeak hour factor = 0.85Peak hour traffic traveling in…
Step by step
Solved in 2 steps
- A rail transit system has prescribed the following factors:1. Peak hour demand = 30000 passengers/hr2. Minimum required speed = 55 ft/sec3. Deceleration = 3 ft/sec24. Safety factor = 1.455. Vehicle length = 80 ft6. Allowable vehicle capacity = 150 pass/veh7. Guideway utilization factor = 0.838. Minimum headway = 110 secHow many cars should the train consist of to provide adequate passenger capacity?QUESTION 12 60 10. 15-min Volumes 75 40 Lane Configurations Y Consider the left turn movement from main street. If the conflicting flow rate is 280 veh/hr, and the critical headway, adjusted for heavy vehicles and grade, is 4.2 seconds, and the follow-up time, adjusted for grade, is 2.29 seco nds, calculate the potential capacity, Cp,4 (veh/h). Provide your answer to the nearest integer. SRCPWhat will be the theoretical capacity of a traffic lane with one way traffic flow at a stream speed of 40 kmph? [Assume the average space gap between vehicles to follow the relation s where V is stream velocity in kmph, t is = 0.278VŁ 8. %3D average reaction time = 0.7 sec and average length of vehicles 5 m]
- Consider the geometric and traffic characteristics shown below. Approach(Width) North(56 ft) South(56 ft) East(68 ft) West(68 ft) Peak hour Approach Volumes: Left Turn 155 95 190 156 Through Movement 442 395 585 538 Right Turn 172 167 201 210 Conflicting Pedestrian Volumes 900 1,200 1,200 900 PHF 0.95 0.95 0.95 0.95 For the following saturation flows: Through lanes: 1,600 veh/h/ln Through-right lanes: 1,400 veh/h/ln Left lanes: 1,000 veh/h/ln Left-through lanes: 1,200 veh/h/ln Left-through-right lanes: 1,100 veh/h/ln The total cycle length was 262 s. Now assume the saturation flow rates are 10% higher, that is, assume the following saturation flow rates: Through lanes: 1,760 veh/h/ln Through-right lanes: 1,540 veh/h/ln Left lanes: 1,100 veh/h/ln Left-through lanes: 1,320 veh/h/ln Left-through-right lanes: 1,210 veh/h/ln Determine a suitable signal phasing system and phase lengths (in s) for the intersection using the…Consider the geometric and traffic characteristics shown below. Approach(Width) North(56 ft) South(56 ft) East(68 ft) West(68 ft) Peak hour Approach Volumes: Left Turn 165 105 200 166 Through Movement 447 400 590 543 Right Turn 162 157 191 200 Conflicting Pedestrian Volumes 900 1,200 1,200 900 PHF 0.95 0.95 0.95 0.95 For the following saturation flows: Through lanes: 1,600 veh/h/ln Through-right lanes: 1,400 veh/h/ln Left lanes: 1,000 veh/h/ln Left-through lanes: 1,200 veh/h/ln Left-through-right lanes: 1,100 veh/h/ln The total cycle length was 283 s. Now assume the saturation flow rates are 10% higher, that is, assume the following saturation flow rates: Through lanes: 1,760 veh/h/ln Through-right lanes: 1,540 veh/h/ln Left lanes: 1,100 veh/h/ln Left-through lanes: 1,320 veh/h/ln Left-through-right lanes: 1,210 veh/h/ln Determine a suitable signal phasing system and phase lengths (in s) for the intersection using the…0-1 A section of highway having a length 60 m. The observed data are 6 vehicles cross over it in a period of 148 sec., for the following duration: 2.4, 2.8, 3.0, 2.1, 2.2. and 3.5 sec. Estimate the values of the flow rate, density, space-mean speed, time-mean speed, average gap, and average clearance. If the length of vehicles are 6, 5.4, 6.6, 4.8, 7.5, and 6 m respectively? 0-2 Traffic volume data has been collected for 10 min time intervals as shown below. Find the total hourly volume, flow rate and PHF. Time 7:30-7:40 7:40-7:50 7:50-8:00 8:00-8:10 8:10-8:20 8:20-8:30 Volume 250 280 300 200 150 130 0-3|| A vehicle takes 1.5 hr to travers a distance of 90 km between two cities. Calculate the journey speed and operational delay if you know that the running speed of this vehicle exceeds it journey speed by 10 km/hr ?
- 3. Compute the average speed that a passenger car should travel in a certain freeway if the spacing if the car moving in the same lane is 40 meters traffic at this instant is 2000 vph. 80 kph center to center. Volume ofFor the geometric characteristics, traffic conditions (traffic volumes are in vehicles per hour) and signal timing shown below, complete parts A through E for the Northbound and Eastbound approaches. A. Adjust the volumes. B. Find the saturation flow rate. C. Find the degree of saturation. D. Find the theoretical delay for each movement. E. Find the theoretical delay and LOS for the EB and NB approaches. Bus stop 5 stops/hr $12 ft teach 6% HV 400 6% HV 650 100 12 ft each - Isolated signal with random arrivals, AT-3 - No residual demand delay 11 ft each - No bicycles or pedestrians Bus stop 5 stops/hr P C = 60 sec Lost time = 3.5 sec/ 7550 2% HV - G=42 Y=4 G=10; Y=4 G=8 Y=4 G=30 Y=4 Φ1 Φ2 ФЗ Assume the intersection is located at Central Business District (CBD) Assume that both the streets are located on level grades, i.e. G = 0 Assume a PHF = 0.95 Assume random arrival i.e. AT-3 Assume that the intersection is isolated and signal is pre-timedThe peak hour factor for a traffic during rush hour is equalto 0.60 with a highest 5-min volume of 250 vehicles. The space meanspeed of the traffics is 90 kph, Compute the spacing of vehiclesin meters