a fill soil with a natural moisture content of 10% and an optimum moisture content of 14% is being used to construct a compacted fill. The contractor is placing this soil in 400 mm lifts, spraying the top with a water truck, and compacting it using a towed sheepsfoot roller. A soils technician has performed a series of field density tests in this fill and has found relative compaction values between 80 and 92%. The measured moisture contents ranged from 1Oto 23%. The specifications require a relative compaction of at least 90%, so the fill is not acceptable. What is wrong with the contractor's methods, and what needs to be done to remedy the problem?
a fill soil with a natural moisture content of 10% and an optimum moisture content of 14% is being used to construct a compacted fill. The contractor is placing this soil in 400 mm lifts, spraying the top with a water truck, and compacting it using a towed sheepsfoot roller. A soils technician has performed a series of field density tests in this fill and has found relative compaction values between 80 and 92%. The measured moisture contents ranged from 1Oto 23%. The specifications require a relative compaction of at least 90%, so the fill is not acceptable. What is wrong with the contractor's methods, and what needs to be done to remedy the problem?
Fundamentals of Geotechnical Engineering (MindTap Course List)
5th Edition
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter5: Soil Compaction
Section: Chapter Questions
Problem 5.16P
Related questions
Question
a fill soil with a natural moisture content of 10% and an optimum moisture content of 14% is being used to construct a compacted fill. The contractor is placing this soil in 400 mm lifts, spraying the top with a water truck, and compacting it using a towed sheepsfoot roller. A soils technician has performed a series of field density tests in this fill and has found relative compaction values between 80 and 92%. The measured moisture contents ranged from 1Oto 23%. The specifications require a relative compaction of at least 90%, so the fill is not acceptable. What is wrong with the contractor's methods, and what needs to be done to remedy the problem?
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 1 steps
Recommended textbooks for you
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning