a construction task has been estimated to take an average of 25 days with a standard deveation of 4 days. What duration should be used if there is a 90% confidence that the duration will not be exceeded? What is the probability that the duration will actually exceed 3 days? Please show formulas used and indicate answers
Q: Determine the slope and deflection at point B of the beam shown by moment-area method (Problem 6.10…
A:
Q: Please solve the problem in the picture, Show all of your work please. Thank you for your help!
A:
Q: 4. An aggregate blend of 40% sand and 60% gravel has a unit weight of 1,920 kg/m3. If the bulk…
A:
Q: If a steel beam that is W10x33 with 20 ft length installed into subsea structure please calculate…
A: The weight of the beam in air can be calculated using the formula:Weight = Length × Weight per…
Q: For the beam shown, determine the support reactions using singularity functions. Hint: For a…
A:
Q: Knowing that the couple shown acts in a vertical plane, deter- mine the stress at (a) point A, (b)…
A:
Q: If the beam has a 100 lb load applied at middle, and this beam is a steel W12x40 ( 12'' depth, with…
A: Detailed explanation:Kindly mark it as HELPFULThanks !
Q: A water treatment plant has four identical rapid sand filters. Each is square in plan and has a…
A:
Q: for review purposes only. please provide complete solution
A: Step 1:Step 2:Step 3:The equations obtained from the steps above can now be solved to determine the…
Q: A 6-inch-diameter pipeline has a length of 845 ft and flows between two reservoirs with an elevation…
A: Detailed explanation:
Q: Subject: Structural Theory Topic: Conjugate Method Determine the slopes and deflections at points B…
A: Step 1: Step 2: Step 3:
Q: Using the stiffness matrix method, solve the beam shown. Consider EI = cte. Follow the numbering of…
A:
Q: 1 — Determine the equation of slope and deflection of the beam shown in Figure 1 by direct…
A:
Q: Determine the reactions for the following beam using the moment distribution method (Problem 15.4 of…
A: Step 1: Step 2: Step 3: Step 4:
Q: DESIGN ONLY FOR SHEAR AND MOMENT STRESSES
A: First, we need to calculate the total load on the structure. The total load is the sum of the point…
Q: 7. Given 2x²y" + xy' + 3y = 0 2x²y(+2)+(4n+1)xy (n+1) + show that (2n² -n+ 3)y(n) = 0
A:
Q: For the I - beam: Flange width is 329 mm. Flange thickness is 24 mm. Web height is 289 mm. Web…
A:
Q: Please solve and show all of your work.
A:
Q: Thumbs-ip will be given. Please write the complete solutions and Write Legibly. Compute the…
A: Given :Beam Length, L=1.5 mBase of triangular cross-section, b=96 mm=0.096 mHeight of triangular…
Q: Please solve the problem in the picture, thank you for your help! Show all of your work in pictures,…
A: Step 1:see step by step procedure Step 2: Step 3: Step 4:
Q: HI, I AM AN ARCHITECTURE STUDENT, THIS IS MY STUDIO PROJECT AND IT HAS A CANTILEVER PART, I NEED…
A: Approach to solving the question: Answer the given question.
Q: I need detailed help solving this exercise from Applied Mechanics. Step by step, please.
A:
Q: 25. A single L6×6×1 is used as a tension brace in a multi-story building. One leg of the angle is…
A:
Q: . Discuss the effect of Temperature and salt on DO concentration.
A: Dissolved Oxygen (DO) is the amount of oxygen that is present in water. It is a very important…
Q: Given: Wonderboom catchment (A = 150 km2) in Pretoria North shown in Fig. 2. The slope of the…
A:
Q: In the position shown in (Figure 1), each chain can support a maximum tension of 800 lblb before it…
A:
Q: The cars of an amusement-park ride have a speed v1 = 90 km/hr at the lowest part of the track.…
A:
Q: 3. (a) Fine aggregate is batched in wet moisture state and had the batch weight of 40 kg. If the…
A:
Q: In response to the increasing challenges in water service provision, there has been a significant…
A:
Q: (4) Use the method of virtual work to determine the horizontal deflection at joint C of the frame.…
A:
Q: Q1: A water-tight shield is prevented from overturning under water pressure by means of wooden…
A: The Strut and Determining the Suitable Cross-Section Understanding the ProblemA water-tight shield…
Q: Q1. A certain soil has a dry unit weight of 18.0 kN/m³ and a specific gravity of solids of 2.67.…
A: We are given the dry unit weight (γd) of the soil as 18.0 kN/m³, the specific gravity of solids (Gs)…
Q: Use the moment-area method to determine the slope and deflection at point C. K2m B 2 m C 3 kN…
A: To solve for the slope and deflection at point C using the moment-area method, follow these…
Q: Given that the reaction at A is 54.33 kips, the reaction at B is 54.47 kips. Draw the Shear and…
A: Step 1: Step 2: Step 3: Step 4:
Q: (read image)
A: Step 1:Step 2:Step 3:
Q: 6. Using historical data provided, compare and contrast the rainfall patterns in the coastal versus…
A: Data Analysis Graphs Q.6b) What factors contribute to the observed differences in rainfall…
Q: List six limiting factors in regards to the accuracies achievable in kinematic surveys.
A: Six limiting factors affecting the accuracies achievable in kinematic surveys include:1. Satellite…
Q: Answer
A: Pressure in a fluid at rest or in motion is the same in all directions at a given depth. This is…
Q: Problem 4. A 20-ft section of horizontal 6-inch-diameter pipe is being investigated in the lab. A…
A: To estimate the equivalent sand grain roughness (ks), we can use the Darcy-Weisbach equation for…
Q: Draw the influence lines for the forces in member CD and CJ, respectively, considering the load acts…
A:
Q: Subject: Structural Theory Topic: Conjugate Method Determine the slope and deflection at point D of…
A: Step 1:Step 2: Step 3: Step 4:
Q: 4. Use the Method of Joints to determine the force in members DE and JE for the deck truss shown. M…
A:
Q: Solve by the indirect Croos method and calculate the second column of the lateral stiffness matrix…
A:
Q: Monthly point rainfalls due to a storm at rain-gauge stations A, B, C, D and E in a Waterval basin…
A: Approach to solving the question: through calculating the data given. Detailed explanation:4.1.…
Q: The truss in the figure is under three forces in terms of P. The maximum force of the three members…
A:
Q: A sedimentation basin is to be designed with the following characteristics: • Average flow rate =…
A:
Q: For the beam below, calculate the support reactions. K₁ ww σ K2
A:
Q: If a steel beam that is W10x33 with 20 ft length installed into subsea structure please calculate…
A:
Q: Determine the horizonal deflection of point D due to the 5-kip load on the beam as shown below.…
A: Step 1:Step 2: Step 3:Step 4:
Q: There are four major characteristics you find in well designed distribution systems. List one of…
A: Reliability in Distribution SystemsReliability is a basic quality of a well-designed distribution…
a construction task has been estimated to take an average of 25 days with a standard deveation of 4 days. What duration should be used if there is a 90% confidence that the duration will not be exceeded? What is the probability that the duration will actually exceed 3 days?
Please show formulas used and indicate answers
Step by step
Solved in 2 steps with 4 images
- The total cycle time for a scraper in a construction project along Ayala Boulevard is 20 mins. If the a 2.1km of the area will be scraped, and the speed of a single push load scraper is 0.08 mph, assuming a standard dump time, a. calculate the load time in seconds b. how many scrapers are required if the scraper's pusher has a cycle time of 2 mins. Write your solutions. Use engineering lettering. need answer please in engineering letteringThe following bar chart shows the activities to complete a project in 6 months (each cell represents 1 month). The total project cost is $700. After 3 months, Activities A, B, half of C, and half of D are completed, for a cost of $200. For this point in time (2 months after the start date), what are the values of the budgeted cost of work performed, the budgeted cost of work scheduled, and the actual cost of the work performed?The figure below shows the road network inside a town proper. According to accident statistics over the last three years, the ten intersections having the highest number of accidents are shown in the corresponding table. The total entering traffic for each intersection is also shown. Identify the intersections that may be considered hazardous, using 95 percent level of confidence. No. of accidents Daily entering volume Intersection no. 15,900 18,300 24,000 13,600 14,200 17,120 13,700 19,300 47,900 17,100 1 243 2 200 3 310 4 180 239 6. 250 190 10 8 360 350 6. 10 400
- 10. Assume that the duration of some activities is not known with certainty. The estimates of these activities are shown below. Activity A C D G H Optimistic Q 8 3 10 13 8 Most Likely 10 5 12 15 10 POM a. What is the project's expected completion time and its variance? b. What is the probability that the project will be completed in 61 days or more? c. What is the probability that the project will be completed in no more than 54 days? c. If the company wants a 94% probability of completing the project on time, state the latest time each activity should have started and completed. Pessimistic 5+ 12 7 14 17 12I need help with these three questions 1. Develop a mass balance equation for the removal of contaminants based on figure 1 (shown in the next photo. For individual steps and an overall mass balance) 2. Pick two contaminants, their concentrations and look at the mass balance and compare your mass balance to the data reported in the paper - Does it match? Hint: Use the frequency of detection, load variation, daily flows, and concentration to find the average concentrations - you can develop your own way of obtaining this but state all assumptions. 3. What would you change in this study to get a better mass balance of the contaminants on a day-to-day basis?Q3: The construction plan for a house is shown in figure and table below, gives the manhoures required and team size for each Activity. Prepare a line of balance schedule for a contract of 15 houses using rate of build of 3 house/ week and each team working at their natural rate. Assume 5 day working week, 8 hours per day, and a minimum buffer time 5 days. A В E D Activity Manhours per activity(M) Men per activity(Q) A B F G 180 320 200 60 38 120 80 40 4 4 2 2 3 2 3
- for step 5, what calculations led to 93%?A contractor is planning the acquisition of construction equipment, including bulldozers, needed for a new project in a remote area. Suppose that from his prior experience with similar bulldozers, he estimated that there is a 65% chance that each bulldozer can remain operational for at least 6 months. 1.) If he purchased four bulldozers for the new project, what is the probability that there will be at least two bulldozers left operational after six months into the project? .What is the travel time for a scraper moving at 20 mph over a distance of 3.0 miles? Group of answer choices 6 minutes 0.25 hours 9 minutes 0.2 hours
- You have just completed 3 projects as detailed in the table below. Calibrate the SIMPLIFIED-COCOMO model provided in the unit materials and predict the duration of a project with 38,000 lines of code. Project Person Months LOC 1 1.8 16,000 2 1.3 12,000 3 1.7 16,000 Answer:A project consists of replacing the track on an existing railroad line, involving 3,000 feet of track. The old track can be removed at a rate of 70 feet per hour. The old rail- road ties can be removed at a rate of 200 feet (measured along the track) per hour. The new ties can be installed at a rate of 25 feet per hour, and the replacement track can be installed at a rate of 40 feet per hour. Show this oper- ation on a linear schedule. Assume that the minimum float for an activity at any location is 1 day.A highway bridge is currently scheduled to be inspected once every two years. There is a 3% probability that during an inspection a major defect will be found. Compute the probability that in the next 12 years no defects will be found in the bridge. Assume statistical independence concerning finding defects in different inspections.