8. Three components – x, y, and z- are made at the same machine via lot production. Setup time, run time, and lot size for each item are as follows: Component Setup time, hr. Run time, min. Lot size 1 800 1.5 400 1 500 One lot of each component is waiting at the machine to be processed: each component is needed immediately. (a) What is the minimum lead time for obtaining all three components? (b) We want to reduce this lead time to 12 hours by reducing setup time and lot size by the same factor for all items. What should the resulting setup time and lot size be for each component?

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
8. Three components – x, y, and z-
Setup time, run time, and lot size for each item are as follows:
are made at the same machine via lot production.
Setup time, hr.
2
Component
Run time, min.
Lot size
1
800
1.5
400
500
1
One lot of each component is waiting at the machine to be processed: each
component is needed immediately.
(a) What is the minimum lead time for obtaining all three components?
(b) We want to reduce this lead time to 12 hours by reducing setup time and lot
size by the same factor for all items. What should the resulting setup time and
lot size be for each component?
Transcribed Image Text:8. Three components – x, y, and z- Setup time, run time, and lot size for each item are as follows: are made at the same machine via lot production. Setup time, hr. 2 Component Run time, min. Lot size 1 800 1.5 400 500 1 One lot of each component is waiting at the machine to be processed: each component is needed immediately. (a) What is the minimum lead time for obtaining all three components? (b) We want to reduce this lead time to 12 hours by reducing setup time and lot size by the same factor for all items. What should the resulting setup time and lot size be for each component?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 6 images

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.