8. Three components – x, y, and z- are made at the same machine via lot production. Setup time, run time, and lot size for each item are as follows: Component Setup time, hr. Run time, min. Lot size 1 800 1.5 400 1 500 One lot of each component is waiting at the machine to be processed: each component is needed immediately. (a) What is the minimum lead time for obtaining all three components? (b) We want to reduce this lead time to 12 hours by reducing setup time and lot size by the same factor for all items. What should the resulting setup time and lot size be for each component?
8. Three components – x, y, and z- are made at the same machine via lot production. Setup time, run time, and lot size for each item are as follows: Component Setup time, hr. Run time, min. Lot size 1 800 1.5 400 1 500 One lot of each component is waiting at the machine to be processed: each component is needed immediately. (a) What is the minimum lead time for obtaining all three components? (b) We want to reduce this lead time to 12 hours by reducing setup time and lot size by the same factor for all items. What should the resulting setup time and lot size be for each component?
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
Related questions
Question

Transcribed Image Text:8. Three components – x, y, and z-
Setup time, run time, and lot size for each item are as follows:
are made at the same machine via lot production.
Setup time, hr.
2
Component
Run time, min.
Lot size
1
800
1.5
400
500
1
One lot of each component is waiting at the machine to be processed: each
component is needed immediately.
(a) What is the minimum lead time for obtaining all three components?
(b) We want to reduce this lead time to 12 hours by reducing setup time and lot
size by the same factor for all items. What should the resulting setup time and
lot size be for each component?
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 6 images

Recommended textbooks for you

Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,

Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education

Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education

Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,

Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education

Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education


Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning

Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.