400 MW 40 MW с D 3 2 80 MW Figure P6.5 Three-bus power system for Problems 6.5 to 6.9 and 6.12 to 6.17 Generator Capacity Marginal cost (MW) ($/MWh) A 150 12 B 200 15 150 400 10 8 6.6 The table below gives the branch data for the three-bus power system of Prob- lem 6.5. Using the superposition principle, calculate the flow that would result if the generating units were dispatched as calculated in Problem 6.5. Identify all the violations of security constraints. Branch Reactance Capacity (p.u.) (MW) 1-2 0.2 250 1-3 0.3 250 2-3 0.3 250 6.7 Determine two ways of removing the constraint violations that you identified in Problem 6.6 by redispatching generating units. Which redispatch is preferable?

Micro Economics For Today
10th Edition
ISBN:9781337613064
Author:Tucker, Irvin B.
Publisher:Tucker, Irvin B.
Chapter7: Proudction Costs
Section: Chapter Questions
Problem 8SQP
icon
Related questions
Question

I only need help with 6.7

ignore the other number, only 6.7

400 MW
40 MW
с
D
3
2
80 MW
Figure P6.5 Three-bus power system for Problems 6.5 to 6.9 and 6.12 to 6.17
Generator
Capacity
Marginal cost
(MW)
($/MWh)
A
150
12
B
200
15
150
400
10
8
6.6 The table below gives the branch data for the three-bus power system of Prob-
lem 6.5. Using the superposition principle, calculate the flow that would result
if the generating units were dispatched as calculated in Problem 6.5. Identify
all the violations of security constraints.
Branch
Reactance
Capacity
(p.u.)
(MW)
1-2
0.2
250
1-3
0.3
250
2-3
0.3
250
6.7 Determine two ways of removing the constraint violations that you identified in
Problem 6.6 by redispatching generating units. Which redispatch is preferable?
Transcribed Image Text:400 MW 40 MW с D 3 2 80 MW Figure P6.5 Three-bus power system for Problems 6.5 to 6.9 and 6.12 to 6.17 Generator Capacity Marginal cost (MW) ($/MWh) A 150 12 B 200 15 150 400 10 8 6.6 The table below gives the branch data for the three-bus power system of Prob- lem 6.5. Using the superposition principle, calculate the flow that would result if the generating units were dispatched as calculated in Problem 6.5. Identify all the violations of security constraints. Branch Reactance Capacity (p.u.) (MW) 1-2 0.2 250 1-3 0.3 250 2-3 0.3 250 6.7 Determine two ways of removing the constraint violations that you identified in Problem 6.6 by redispatching generating units. Which redispatch is preferable?
Expert Solution
steps

Step by step

Solved in 2 steps with 3 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Micro Economics For Today
Micro Economics For Today
Economics
ISBN:
9781337613064
Author:
Tucker, Irvin B.
Publisher:
Cengage,
Survey Of Economics
Survey Of Economics
Economics
ISBN:
9781337111522
Author:
Tucker, Irvin B.
Publisher:
Cengage,
Managerial Economics: Applications, Strategies an…
Managerial Economics: Applications, Strategies an…
Economics
ISBN:
9781305506381
Author:
James R. McGuigan, R. Charles Moyer, Frederick H.deB. Harris
Publisher:
Cengage Learning