4. B.G.H.M. Inc. is a local buniness involved in many aspecta of the food supply industry. As demand during Covid times has increased, the management have decided to stream line their procees using technology and begin overhauling their operations. They will be perforning the following tasks : Tusk Description Predeceor Determine requirements Receive Contractor Bids Select a Contractor Order Computer System E A. C A, B C Design a new Office Layout C Design a Network Layout G E Denign a Computer GUI H. C Connect Computers Install operating software Train operators K D, F, G D, F Simulation Test the System I, J Market the changes L. K A study into the expected times for each Task has revealed the following information (time in weeks) Task | Best Case Time Average Time Worst Cse Time 3 8. 16 6. D 12 25 E 7 10 13 F 6. 11 7 10 4 8. 6. I 4 6. J. 4. 6. K 3. 10 6. • Develop a report which presents the PERT diagram and determines the Expected time for the project. Include an explanation with details of what the worst case time is and what the best case time is.
-All constraints and linear programs should be derived with explanation and hand written. Linear programs (when asked for) should then be written in COMPLETE PROPER FORM (ALL constraints , organized order and clear identication of variable meanings).
All diagrams and graphics should be presented (repeated) enough times to clearly demonstrate the work process that was followed in carrying out your work. Legibility is necessary.
Excel can be used for calculations, but the pdf of this work must be \hand" augmented with clear indications of what was being carried out
Excel sheets involving solver must be fully explained and the solver window itself should be screen capped and submitted as part of your presentation to show the linear program you
asked excel to solve.
This is the Steps please follow.
And I need you to write the steps please. Step by Step
PERT)



Step by step
Solved in 2 steps with 4 images