28. A guidance and detection system is being built as part of a large defense project. The detection portion consists of radar and sonar subsystems. Separate equipment is required for each of the subsystems. In each case, the equipment must be calibrated prior to production. After production, each subsystem is tested independently. The radar and the sonar are combined to form the detection system, which also must be tested prior to integration with the guidance system. The final test of the entire system requires complex equipment. The activities and the activity times are Activity Time Required (days) A: Calibrate machine 1 (for radar) B: Calibrate machine 2 (for sonar) C: Calibrate machine 3 (for guidance) D: Assemble and prepare final test gear E: Make radar subsystem F: Make sonar subsystem G: Make guidance subsystem H: Test radar subsystem I: Test sonar subsystem J: Test guidance subsystem K: Assemble detection subsystem (radar and sonar) L: Test detection subsystem M: Final assembly of three systems N: Testing of final assembly 2.0 3.5 1.5 7.0 4.5 5.0 4.5 2.0 3.0 2.0 1.5 2.5 2.5 3.5

Purchasing and Supply Chain Management
6th Edition
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
ChapterC: Cases
Section: Chapter Questions
Problem 5.1SA
icon
Related questions
icon
Concept explainers
Topic Video
Question

a. Construct a network for this project.

28. A guidance and detection system is being built as part of a large defense project.
The detection portion consists of radar and sonar subsystems. Separate equipment
is required for each of the subsystems. In each case, the equipment must be calibrated
prior to production. After production, each subsystem is tested independently. The
radar and the sonar are combined to form the detection system, which also must be
tested prior to integration with the guidance system. The final test of the entire system
requires complex equipment. The activities and the activity times are
Activity
Time Required (days)
A: Calibrate machine 1 (for radar)
B: Calibrate machine 2 (for sonar)
C: Calibrate machine 3 (for guidance)
D: Assemble and prepare final test gear
E: Make radar subsystem
F: Make sonar subsystem
G: Make guidance subsystem
H: Test radar subsystem
I: Test sonar subsystem
J: Test guidance subsystem
K: Assemble detection subsystem (radar and sonar)
L: Test detection subsystem
M: Final assembly of three systems
N: Testing of final assembly
2.0
3.5
1.5
7.0
4.5
5.0
4.5
2.0
3.0
2.0
1.5
2.5
2.5
3.5
Transcribed Image Text:28. A guidance and detection system is being built as part of a large defense project. The detection portion consists of radar and sonar subsystems. Separate equipment is required for each of the subsystems. In each case, the equipment must be calibrated prior to production. After production, each subsystem is tested independently. The radar and the sonar are combined to form the detection system, which also must be tested prior to integration with the guidance system. The final test of the entire system requires complex equipment. The activities and the activity times are Activity Time Required (days) A: Calibrate machine 1 (for radar) B: Calibrate machine 2 (for sonar) C: Calibrate machine 3 (for guidance) D: Assemble and prepare final test gear E: Make radar subsystem F: Make sonar subsystem G: Make guidance subsystem H: Test radar subsystem I: Test sonar subsystem J: Test guidance subsystem K: Assemble detection subsystem (radar and sonar) L: Test detection subsystem M: Final assembly of three systems N: Testing of final assembly 2.0 3.5 1.5 7.0 4.5 5.0 4.5 2.0 3.0 2.0 1.5 2.5 2.5 3.5
Expert Solution
steps

Step by step

Solved in 2 steps with 7 images

Blurred answer
Knowledge Booster
Inventory management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,