28. A guidance and detection system is being built as part of a large defense project. The detection portion consists of radar and sonar subsystems. Separate equipment is required for each of the subsystems. In each case, the equipment must be calibrated prior to production. After production, each subsystem is tested independently. The radar and the sonar are combined to form the detection system, which also must be tested prior to integration with the guidance system. The final test of the entire system requires complex equipment. The activities and the activity times are Activity Time Required (days) A: Calibrate machine 1 (for radar) B: Calibrate machine 2 (for sonar) C: Calibrate machine 3 (for guidance) D: Assemble and prepare final test gear E: Make radar subsystem F: Make sonar subsystem G: Make guidance subsystem H: Test radar subsystem I: Test sonar subsystem J: Test guidance subsystem K: Assemble detection subsystem (radar and sonar) L: Test detection subsystem M: Final assembly of three systems N: Testing of final assembly 2.0 3.5 1.5 7.0 4.5 5.0 4.5 2.0 3.0 2.0 1.5 2.5 2.5 3.5
Critical Path Method
The critical path is the longest succession of tasks that has to be successfully completed to conclude a project entirely. The tasks involved in the sequence are called critical activities, as any task getting delayed will result in the whole project getting delayed. To determine the time duration of a project, the critical path has to be identified. The critical path method or CPM is used by project managers to evaluate the least amount of time required to finish each task with the least amount of delay.
Cost Analysis
The entire idea of cost of production or definition of production cost is applied corresponding or we can say that it is related to investment or money cost. Money cost or investment refers to any money expenditure which the firm or supplier or producer undertakes in purchasing or hiring factor of production or factor services.
Inventory Management
Inventory management is the process or system of handling all the goods that an organization owns. In simpler terms, inventory management deals with how a company orders, stores, and uses its goods.
Project Management
Project Management is all about management and optimum utilization of the resources in the best possible manner to develop the software as per the requirement of the client. Here the Project refers to the development of software to meet the end objective of the client by providing the required product or service within a specified Period of time and ensuring high quality. This can be done by managing all the available resources. In short, it can be defined as an application of knowledge, skills, tools, and techniques to meet the objective of the Project. It is the duty of a Project Manager to achieve the objective of the Project as per the specifications given by the client.
c. Draw a Gantt chart for this project based on the earliest times
Step by step
Solved in 2 steps with 2 images