1:08 Il LTE Individual Assignment CEQ 31... CIVIL ENGINEERING ROANTICLO (Earthworks Quantities) (Due Date: Friday, 28/03/2025) Done Thumbi Irrigation Scheme in Mzimba district is under threat of flooding. In order to mitigate against the problem, authorities have decided to construct a flood protection bund (Dyke). Figure 1 is a cross section of a 300m long proposed dyke; together with its foundation (key). Survey data for the proposed site of the dyke are presented in Table 1. Table 2 provides swelling and shrinkage factors for the fill material that has been proposed. The dyke dimensions that are given are for a compacted fill. (1) Assume you are in the design office, use both the Simpson Rule and Trapezoidal Rule to compute the total volume of earthworks required. (Assume both the dyke and the key will use the same material). (2) If you are a Contractor, how many days will it take to finish hauling the computed earthworks using 3 tippers of 12m³ each? Make appropriate assumptions. DIKE CROSS SECTION OGL KEY (FOUNDATION) 2m 1m 2m 8m Figure 1: Cross section of Dyke and its foundation Table 1: Survey Data for site of a Dyke 1.5m from highest OGL 0.5m from OGL BS IS FS RL 1.655 100.000 Remark TBM THU 5 1.512 Baseline AO 1.480 20 1.495 40 1.580 60 1.830 80 1.740 100 1.950 1.950 120 2.400 140 1.880 160 1.890 180 1.550 200 1.530 220 1.275 240 1.170 260 1.975 1.950 1.165 -20 0.900 -40 1.680 c/s THU5 OGL Q 1:10 ■ll LTE Individual Assignment CEQ 31... B 2 of 2 KEY (FOUNDATION) 1m 2m 8m Figure 1: Cross section of Dyke and its foundation Table 1: Survey Data for site of a Dyke 1.5m from highest OGL 0.5m from OGL BS IS FS RL 1.655 100.000 Remark TBM THU 5 1.512 Baseline AO 1.480 20 1.495 40 1.580 60 1.830 80 1.740 100 1.950 1.950 120 2.400 140 1.880 160 1.890 180 1.550 200 1.530 220 1.275 240 1.170 260 1.975 1.950 1.165 0.900 -20 -40 1.680 c/s THU5 Table 2: Swelling and Shrinkage factors for the proposed fill material Initial Soil Type Soil Condition Bank Converted to: Loose Compacted Clay Bank 1.00 1.27 0.90 Loose 0.79 1.00 0.71 Compacted 1.11 1.41 1.00 Common earth Bank 1.00 1.25 0.90 Loose 0.80 1.00 0.72 Compacted 1.11 1.39 1.00 Rock (blasted) Bank 1.00 1.50 1.30 Loose 0.67 1.00 0.87 Compacted 0.77 1.15 1.00 Sand Bank 1.00 1.12 0.95 Loose 0.89 1.00 0.85 Compacted 1.05 1.18 1.00 OGL Done Q
1:08 Il LTE Individual Assignment CEQ 31... CIVIL ENGINEERING ROANTICLO (Earthworks Quantities) (Due Date: Friday, 28/03/2025) Done Thumbi Irrigation Scheme in Mzimba district is under threat of flooding. In order to mitigate against the problem, authorities have decided to construct a flood protection bund (Dyke). Figure 1 is a cross section of a 300m long proposed dyke; together with its foundation (key). Survey data for the proposed site of the dyke are presented in Table 1. Table 2 provides swelling and shrinkage factors for the fill material that has been proposed. The dyke dimensions that are given are for a compacted fill. (1) Assume you are in the design office, use both the Simpson Rule and Trapezoidal Rule to compute the total volume of earthworks required. (Assume both the dyke and the key will use the same material). (2) If you are a Contractor, how many days will it take to finish hauling the computed earthworks using 3 tippers of 12m³ each? Make appropriate assumptions. DIKE CROSS SECTION OGL KEY (FOUNDATION) 2m 1m 2m 8m Figure 1: Cross section of Dyke and its foundation Table 1: Survey Data for site of a Dyke 1.5m from highest OGL 0.5m from OGL BS IS FS RL 1.655 100.000 Remark TBM THU 5 1.512 Baseline AO 1.480 20 1.495 40 1.580 60 1.830 80 1.740 100 1.950 1.950 120 2.400 140 1.880 160 1.890 180 1.550 200 1.530 220 1.275 240 1.170 260 1.975 1.950 1.165 -20 0.900 -40 1.680 c/s THU5 OGL Q 1:10 ■ll LTE Individual Assignment CEQ 31... B 2 of 2 KEY (FOUNDATION) 1m 2m 8m Figure 1: Cross section of Dyke and its foundation Table 1: Survey Data for site of a Dyke 1.5m from highest OGL 0.5m from OGL BS IS FS RL 1.655 100.000 Remark TBM THU 5 1.512 Baseline AO 1.480 20 1.495 40 1.580 60 1.830 80 1.740 100 1.950 1.950 120 2.400 140 1.880 160 1.890 180 1.550 200 1.530 220 1.275 240 1.170 260 1.975 1.950 1.165 0.900 -20 -40 1.680 c/s THU5 Table 2: Swelling and Shrinkage factors for the proposed fill material Initial Soil Type Soil Condition Bank Converted to: Loose Compacted Clay Bank 1.00 1.27 0.90 Loose 0.79 1.00 0.71 Compacted 1.11 1.41 1.00 Common earth Bank 1.00 1.25 0.90 Loose 0.80 1.00 0.72 Compacted 1.11 1.39 1.00 Rock (blasted) Bank 1.00 1.50 1.30 Loose 0.67 1.00 0.87 Compacted 0.77 1.15 1.00 Sand Bank 1.00 1.12 0.95 Loose 0.89 1.00 0.85 Compacted 1.05 1.18 1.00 OGL Done Q
Solid Waste Engineering
3rd Edition
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Worrell, William A.
Chapter8: Landfills
Section: Chapter Questions
Problem 8.9P
Related questions
Question

Transcribed Image Text:1:08
Il LTE
Individual Assignment CEQ 31...
CIVIL ENGINEERING ROANTICLO
(Earthworks Quantities)
(Due Date: Friday, 28/03/2025)
Done
Thumbi Irrigation Scheme in Mzimba district is under threat of flooding. In order to
mitigate against the problem, authorities have decided to construct a flood protection
bund (Dyke). Figure 1 is a cross section of a 300m long proposed dyke; together with its
foundation (key). Survey data for the proposed site of the dyke are presented in Table 1.
Table 2 provides swelling and shrinkage factors for the fill material that has been
proposed. The dyke dimensions that are given are for a compacted fill.
(1) Assume you are in the design office, use both the Simpson Rule and Trapezoidal
Rule to compute the total volume of earthworks required. (Assume both the dyke
and the key will use the same material).
(2) If you are a Contractor, how many days will it take to finish hauling the computed
earthworks using 3 tippers of 12m³ each? Make appropriate assumptions.
DIKE CROSS SECTION
OGL
KEY (FOUNDATION)
2m
1m
2m
8m
Figure 1: Cross section of Dyke and its foundation
Table 1: Survey Data for site of a Dyke
1.5m from highest OGL
0.5m from OGL
BS
IS
FS
RL
1.655
100.000
Remark
TBM THU 5
1.512
Baseline AO
1.480
20
1.495
40
1.580
60
1.830
80
1.740
100
1.950
1.950
120
2.400
140
1.880
160
1.890
180
1.550
200
1.530
220
1.275
240
1.170
260
1.975
1.950
1.165
-20
0.900
-40
1.680
c/s THU5
OGL
Q

Transcribed Image Text:1:10
■ll LTE
Individual Assignment CEQ 31...
B 2 of 2
KEY (FOUNDATION)
1m
2m
8m
Figure 1: Cross section of Dyke and its foundation
Table 1: Survey Data for site of a Dyke
1.5m from highest OGL
0.5m from OGL
BS
IS
FS
RL
1.655
100.000
Remark
TBM THU 5
1.512
Baseline AO
1.480
20
1.495
40
1.580
60
1.830
80
1.740
100
1.950
1.950
120
2.400
140
1.880
160
1.890
180
1.550
200
1.530
220
1.275
240
1.170
260
1.975
1.950
1.165
0.900
-20
-40
1.680
c/s THU5
Table 2: Swelling and Shrinkage factors for the proposed fill material
Initial
Soil Type Soil Condition
Bank
Converted to:
Loose Compacted
Clay
Bank
1.00
1.27
0.90
Loose
0.79
1.00
0.71
Compacted
1.11
1.41
1.00
Common earth Bank
1.00
1.25
0.90
Loose
0.80
1.00
0.72
Compacted
1.11
1.39
1.00
Rock (blasted) Bank
1.00
1.50
1.30
Loose
0.67
1.00
0.87
Compacted
0.77
1.15
1.00
Sand
Bank
1.00
1.12
0.95
Loose
0.89
1.00
0.85
Compacted
1.05
1.18
1.00
OGL
Done
Q
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps

Recommended textbooks for you

Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,

Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,

Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,