. Sandy's Snacks produces snack mixes for the gourmet and natural foods market. Its most popular product is Tempting Trail Mix, a mixture of peanuts, dried cranberries, and chocolate pieces. For each batch, the budgeted quantities and budgeted prices are as follows: Quantity per Batch 60 cups 30 cups Price per Cup $1 Peanuts Dried cranberries $2 Chocolate pieces 10 cups Small changes to the standard mix of direct materials reflected in the above quantities do not significantly affect the overall end product. In addition, not all ingredients added to production end up in the finished product, as some are rejected during inspection. In the current period, Sandy's Snacks made 100 batches of Tempting Trail Mix with the following actual quantity, cost, and mix of inputs: Actual Quantity 6,720 cups 2,625 cups 1,155 cups 10,500 cups Actual Cost Actual Mix Peanuts $ 5,712 64% Dried cranberries 5,775 25% Chocolate pieces 3,350 11% $14,837 Total actual 100%
Master Budget
A master budget can be defined as an estimation of the revenue earned or expenses incurred over a specified period of time in the future and it is generally prepared on a periodic basis which can be either monthly, quarterly, half-yearly, or annually. It helps a business, an organization, or even an individual to manage the money effectively. A budget also helps in monitoring the performance of the people in the organization and helps in better decision-making.
Sales Budget and Selling
A budget is a financial plan designed by an undertaking for a definite period in future which acts as a major contributor towards enhancing the financial success of the business undertaking. The budget generally takes into account both current and future income and expenses.
Q.What is the budgeted cost of direct materials for the 100 batches?
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images