Question 1 of 10. When is a configuration baseline established? Product development has been completed Product's configuration documentation is considered complete and correct Product has successfully completed a Functional Configuration Audit (FCA) Product's configuration information has been entered into the status accounting system Question 2 of 10. After the Army’s new software-defined radio is developed and deployed, we want to solicit alternative sources for sustaining it in the field. Which of the following data rights will enable us to share the necessary technical data with an alternative product support provider? Select two that apply. Government Purpose Rights Limited Rights Unlimited Rights None of the answers are correct Question 3 of 10. What level of Technical Data Package is required for a newly developed Army truck that has entered into the Production and Deployment phase of the Major Capability Acquisition pathway? Conceptual level None of the answers are correct Development level Product level Question 4 of 10. After importing a GEIA-STD-0007-compliant Logistics Product Database file, your powerLOG-J presents an error screen with a message calling out a violation. What is the most effective and proper way to correct this identified violation? Report the error through your Integrated Product Team so the violation can be evaluated for contract compliance and corrective action can be taken as necessary. Ignore this error message; database import errors are not a concern when conducting or evaluating Supportability Analysis. Since you have seen this kind of error before, make the correction yourself and inform your IPT. Cancel the import and call LOGSA powerLOG-J customer support for assistance. Question 5 of 10. What is the correct Work Breakdown Structure (WBS) for a new Navy Destroyer ship? Use the WBS containing alternatives “a,” “b,” “c,” and “d,” to choose your answer.
Alternative a. 1.0 Sea System 1.1 Ship 1.1.1 Hull Structure 1.1.2 Propulsion Plant 1.1.2.1 Engine 1.1.2.2 Main Reduction Gear 1.2 Systems Engineering 1.2.1 Core Systems Engineering Alternative b. 1.0 Sea System 1.1 Hull Structure 1.2 Propulsion Plant 1.1.2.1 Engine 1.1.2.2 Main Reduction Gear Alternative c. 2.0 Propeller 2.1 Systems Engineering 3.0 Technical Manuals 3.1 Propulsion Plant technical manual Alternative d. 1.0 Ship 1.1 Gas Turbine 1.1.1 Compressor assembly 1.2 Lube oil pump 1.2.1 440 Volt systems 2.0 Integrated Logistics support 2.1 Training 2.2 Spare parts list b d a
c Question 6 of 10. You are part of the Integrated Product Team to determine the data needs for a new Air Force cargo plane. What acquisition document(s) would you read first to understand the Program’s strategies related to data acquisition? All of the answers are correct Life Cycle Sustainment Plan Intellectual Property Strategy Acquisition Strategy Question 7 of 10. The lube oil purifier for a DDG 51 Class Destroyer failed during production builders trials due to an unreliable bearing. Which three of the following IPS Elements in Page 3, Block 38, of the ECP Form are most likely to be effected? Design Interface Maintenance Planning & Mgmt Product Support Management Manpower & Personnel Support Equipment Training & Training Support Technical Data Supply Support Sustaining Engineering Other Facilities & Structure Packaging, Handling, Storage, and Transportation (PHS&T) Computer Resources Question 8 of 10. You are the logistician in charge of moving all the technical data to a Cloud Service provider. What should be your first step? Exchange information with the Cloud vendors Determine the cost Identify the Impact Level Obtain Buy-In from Leadership Question 9 of 10.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
What are three technical data items for the M3R vehicle that will be ordered by a Contract Data Requirement List (CDRL)? Instructions for installing the split screen viewing application on the warfighter's laptop to enable him/her to see what the M3R's cameras are seeing 3D design drawings of the arm & gripper Instructions for installing the cameras for nighttime viewing Firmware and computer source code that enable the M3R vehicle to avoid obstacles Question 10 of 10. You are assigned to review the engineering drawing for the correct format. The drawing is for a type 3D native model. What is your response about the drawing? Drawing is almost correct since it is a blue print None of these responses is correct. Not a 3D native model Drawing is correct; a 3D native model