Q1: List the steps necessary to create an inspection and Testing Plan (ITP) using safety considerations of NDT
.
Define the project’s scope :-
Define the scope of the work clearly, together with the location, type of machinery, equipment or structure to be tested, and NDT techniques to be applied.
Conduct hazard assessment :- Determine the possibility of radiation or hazardous material exposure as well as any potential hazard related to the NDT procedure.
Establish NDT requirements :- Determine the precise NDT requirements for the project, including the frequency of inspections and the acceptance standards.
Select NDT techniques :- Select the appropriate techniques based on the project parameters and results of the hazard assessment.
Establish the equipment and personnel :- Establish the equipment and manpower required for the NDT process.
Create safety protocols :- Develop protocols for carrying out the NDT process in a safe manner, including guidelines for emergency.
Review and approve :- Examine the ITP and obtain approval from the relevant stakeholders, NDT staff and regulatory agencies.
Q2 : List Five advantages of using Quality Control and Compliance considerations
.
Improved customer satisfaction :- By ensuring that products and services meet high quality standards, customer satisfaction will likely increase.
Higher profitability :- The risk of product failure and customer complaints is decreased by producing items that are of higher.
Improved brand reputation :- Offering high quality goods and services that comply with regulations can improve a business’s reputation.
Regulation Compliance :- By including quality control and compliance considerations, businesses can reduce their risk of fines and legal action.
Increased process efficiency :- By identifying and removing inefficiencies from company operations, a quality control program can help increase productivity and efficiency.
Q3 : Imagine you are a quality supervisor in the submarine project and have been requested to create a testing plan for the NDT job. What are the NDT tests to consider constructing a submarine, and why?
Magnetic particle testing :- Magnetic particles are used to inspect surface of submarine components, such as welds and structural elements, for cracks and other surface defects.
Liquid penetrant Testing :- This technique is used to inspect cracks and other surface
defects on the surface of submarine components, such as castings and welds. REFERENCES
Stremmel, R. (2018, March 9). 6 TIPS for writing a good Inspection and Test Plan (ITP)
. https://www.linkedin.com/pulse/6-tips-writing-good-inspection-test-plan-itp-
randall-stremmel
Allport, M. (n.d.). How to write a Better Inspection & Test Plan (ITP)
. https://blog.compliancecouncil.com.au/blog/how-to-write-a-better-inspection-test-
plan-itp
Zhang, X. (n.d.). Quality control: Why is it so important now?
https://info.qii.ai/blog/quality-
control-why-is-it-so-important-now
Jung, M., Park, B., Bae, J., & Shin, S. (2018). PAUT-based defect detection method for submarine pressure hulls. International Journal of Naval Architecture and Ocean Engineering
, 10
(2), 153–169. https://doi.org/10.1016/j.ijnaoe.2017.06.002
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Documents
Related Questions
Non destructive testing
1. Give your analysis on how NDT can be use in the current industry.
2. Rank all kinds of NDT from the most expensive to the cheapest.
3. What is the most used NDT process in the industry?
check the image below for guide.
arrow_forward
Q3: Monitoring and measuring (audits)
(a) Based on the scenario only, comment on the approach taken to the audit.
(b) Advise the MD on the differences between an audit and a workplace inspection.
arrow_forward
Select atleast two testing devices from among the categories (you may go beyond two). Discuss its application and methods of use. a. testing for speed (Tachometer), b. Testing of Air Consumption (Air-box method/viscous-flow meter), c. testing of exhaust smoke (Bosch/Hartridge/PHS), d. testing of exhaust emission (flame ionization detector/spectroscopic analyzers/gas chromatography) e. testing of torque (absorption dynamometer/transmission dynamometer).
arrow_forward
Subject: Air Pollution Formation and Control
Do not just copy and paster other online answers
arrow_forward
The following information is available for Edgar Corporation’s Material X.
Annual Usage 12,600 units
Working days per year 360 days
Normal lead time 20 days
The units of Material X are required evenly throughout the year.
What is the reorder points?
Assuming that occasionally, the company experiences delay in the delivery of Material X, such that the lead time reaches a maximum of 30 days, how many units of safety stocks should the company maintain and what is the reorder point? Show computation.
arrow_forward
Do not provide handwritten solution,Maintain accuracy and quality in your answer,Take care of plagiarism,Answer completely,You will get up vote for sure.
arrow_forward
In a continuous review inventory system, the lead time for doorknobs is 5 weeks. The standard deviation of demand during thelead time is 85 units. The desired cycle-service level is 99 per-cent. The supplier of door knobs streamlined its operations andnow quotes a one-week lead time. How much can safety stockbe reduced without reducing the 99 percent cycle-service level?
arrow_forward
List 3 of the main reliability design analysis techniques
arrow_forward
00
T
R
%24
Bb R
V qa
du/webapps/assessment/take/launch.jsp?course_assessment_id%=_254968_1&course_id%3D 3565256_1&content id= 52826
* Question Completion Status:
Attach File
Browse Local Files
Browse Content Collection
QUESTION 2
A company needs to choose one supplier for a particular type of silicon wafer used'in the production of
semiconductors. The company has three options. Supplier A sells the silicon wafers for $2.50 per wafer,
independently of the number of wafers ordered. Supplier B sells the wafers for $2.40 each but does not
consider an order for less than 2,000 wafers. Supplier C sells the wafers for $2.30 each but does not accept
an order for less than 3,000 wafers. Assume an order setup cost of $100 and an annual requirement of 20,000
wafers. Assume a 20% annual interest rate for holding cost calculations.
a. Which supplier should be chosen to minimize the total annual cost for the wafers, and what is the
optimal order quantity?
b. If the replenishment lead time for wafers…
arrow_forward
Develop a plan to calibrate the following: (a) The standard National Weather Service rain gauge. (b) Tipping bucket rain gauge. (c)
Distance measuring wheel.
arrow_forward
7
arrow_forward
Select all true statements.
O To obtain a mining lease, the holder of a mining claim must absolutely acquire
surface rights.
| Mechanized stripping is used to expose the bedrock linearly to test the
geological unit of interest on its full width, perpendicular to its contact with the
surrounding units.
The apparent length of a mineralized zone of interest is always shorter than its
true width.
Upon reaching commercial production, the purchaser of a mineral exploration
property can pay a certain amount to the seller in exchange for a reduction of
the percentage of the Net Smelter Return (NSR) retained by the seller.
arrow_forward
Lusaka Engineering Company (LEC) had actual quality costs for the year ended December
31, 2022, as given below:
Cost Element Amount ($)
Prototype verification 300,000
Process acceptance 315,000
Product liability 618,750
Recalls 243,750
Retesting 187,500
Rework 375,000
Test labour 360,000
Vendor certification 600,000
At the zero-defect state, LEC expects to spend $375,000 on Prototype verification, $75,000
on Vendor certification, and $50,000 on Process acceptance. Assume sales to be
$25,000,000.
Required:
(a) Prepare a Cost of Quality report for 2022 using the PAF Model. What does this
report tell the management of LEC?
(b) Prepare a Cost of Quality report for the Zero-Defect State using the PAF Model.
Explain why quality costs still are present for the zero-defect state.
(c) What if LEC achieves the zero-defect state reflected in the report in part (b), what
are some of the implications of this achievement?
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you

Automotive Technology: A Systems Approach (MindTa...
Mechanical Engineering
ISBN:9781133612315
Author:Jack Erjavec, Rob Thompson
Publisher:Cengage Learning

Precision Machining Technology (MindTap Course Li...
Mechanical Engineering
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Cengage Learning
Related Questions
- Non destructive testing 1. Give your analysis on how NDT can be use in the current industry. 2. Rank all kinds of NDT from the most expensive to the cheapest. 3. What is the most used NDT process in the industry? check the image below for guide.arrow_forwardQ3: Monitoring and measuring (audits) (a) Based on the scenario only, comment on the approach taken to the audit. (b) Advise the MD on the differences between an audit and a workplace inspection.arrow_forwardSelect atleast two testing devices from among the categories (you may go beyond two). Discuss its application and methods of use. a. testing for speed (Tachometer), b. Testing of Air Consumption (Air-box method/viscous-flow meter), c. testing of exhaust smoke (Bosch/Hartridge/PHS), d. testing of exhaust emission (flame ionization detector/spectroscopic analyzers/gas chromatography) e. testing of torque (absorption dynamometer/transmission dynamometer).arrow_forward
- Subject: Air Pollution Formation and Control Do not just copy and paster other online answersarrow_forwardThe following information is available for Edgar Corporation’s Material X. Annual Usage 12,600 units Working days per year 360 days Normal lead time 20 days The units of Material X are required evenly throughout the year. What is the reorder points? Assuming that occasionally, the company experiences delay in the delivery of Material X, such that the lead time reaches a maximum of 30 days, how many units of safety stocks should the company maintain and what is the reorder point? Show computation.arrow_forwardDo not provide handwritten solution,Maintain accuracy and quality in your answer,Take care of plagiarism,Answer completely,You will get up vote for sure.arrow_forward
- In a continuous review inventory system, the lead time for doorknobs is 5 weeks. The standard deviation of demand during thelead time is 85 units. The desired cycle-service level is 99 per-cent. The supplier of door knobs streamlined its operations andnow quotes a one-week lead time. How much can safety stockbe reduced without reducing the 99 percent cycle-service level?arrow_forwardList 3 of the main reliability design analysis techniquesarrow_forward00 T R %24 Bb R V qa du/webapps/assessment/take/launch.jsp?course_assessment_id%=_254968_1&course_id%3D 3565256_1&content id= 52826 * Question Completion Status: Attach File Browse Local Files Browse Content Collection QUESTION 2 A company needs to choose one supplier for a particular type of silicon wafer used'in the production of semiconductors. The company has three options. Supplier A sells the silicon wafers for $2.50 per wafer, independently of the number of wafers ordered. Supplier B sells the wafers for $2.40 each but does not consider an order for less than 2,000 wafers. Supplier C sells the wafers for $2.30 each but does not accept an order for less than 3,000 wafers. Assume an order setup cost of $100 and an annual requirement of 20,000 wafers. Assume a 20% annual interest rate for holding cost calculations. a. Which supplier should be chosen to minimize the total annual cost for the wafers, and what is the optimal order quantity? b. If the replenishment lead time for wafers…arrow_forward
- Develop a plan to calibrate the following: (a) The standard National Weather Service rain gauge. (b) Tipping bucket rain gauge. (c) Distance measuring wheel.arrow_forward7arrow_forwardSelect all true statements. O To obtain a mining lease, the holder of a mining claim must absolutely acquire surface rights. | Mechanized stripping is used to expose the bedrock linearly to test the geological unit of interest on its full width, perpendicular to its contact with the surrounding units. The apparent length of a mineralized zone of interest is always shorter than its true width. Upon reaching commercial production, the purchaser of a mineral exploration property can pay a certain amount to the seller in exchange for a reduction of the percentage of the Net Smelter Return (NSR) retained by the seller.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Automotive Technology: A Systems Approach (MindTa...Mechanical EngineeringISBN:9781133612315Author:Jack Erjavec, Rob ThompsonPublisher:Cengage LearningPrecision Machining Technology (MindTap Course Li...Mechanical EngineeringISBN:9781285444543Author:Peter J. Hoffman, Eric S. Hopewell, Brian JanesPublisher:Cengage Learning

Automotive Technology: A Systems Approach (MindTa...
Mechanical Engineering
ISBN:9781133612315
Author:Jack Erjavec, Rob Thompson
Publisher:Cengage Learning

Precision Machining Technology (MindTap Course Li...
Mechanical Engineering
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Cengage Learning