House construction

pptx

School

Oxford University *

*We aren’t endorsed by this school

Course

101,208

Subject

Information Systems

Date

Nov 24, 2024

Type

pptx

Pages

6

Uploaded by HighnessGoldfinch3318

Report
House construction House construction
Introduction Introduction DA (Development Application): The DA is typically submitted by the developer or owner to the local council for approval of new homes and renovations that involve structural changes. o Design drawings, o Statement of Environmental Effects, o Materials Reuse Statement (also called a Waste Management Report) o and a BASIX Certificates must accompany the application. Other reports such as Flora and Fauna Assessments, Bushfire Assessments and Geo- technical Assessments may also be required Together these documents describe the usage, style, size and location of the intended building and its surrounds including the zoning and any special conditions that may be placed upon the property. DA (Development Application): The DA is typically submitted by the developer or owner to the local council for approval of new homes and renovations that involve structural changes. o Design drawings, o Statement of Environmental Effects, o Materials Reuse Statement (also called a Waste Management Report) o and a BASIX Certificates must accompany the application. Other reports such as Flora and Fauna Assessments, Bushfire Assessments and Geo- technical Assessments may also be required Together these documents describe the usage, style, size and location of the intended building and its surrounds including the zoning and any special conditions that may be placed upon the property.
Client requirements Client requirements Client requirements Based on your review of the documentation above, provide a summary of the client requirements for the project and the work you need to complete. Has all the information been provided such that a design can be developed? This includes detailed specifications and development and implementation factors. If not, what are the gaps? The client of the project requires the general project objectives, project scope, deliverables needed, the duration of the project and budget. The client will require documentation including Project requirement o Environmental effects and history of the site o Legislations, regulations, and standards given for the construction of building o structural model of the bridge o Material used in the construction o Budget details o timing needed for construction of the whole bridge Specifications, development, and implementation: the bridge is to be constructed on the swan river, Australia. most efficient and well performing machineries will be used for the construction making a structural model of the bridge with the help of expert civil engineers and architects It would take 16 months at least for the construction of the bridge. The budgets and project price will be discussed and negotiated in the meeting (on average the client will be charged around $560 million AUD for the project). The bride will be 0.75 kilometres in length. Proper allocation and number of employees and final project price and cost have not been identified and determined to the client. Client requirements Based on your review of the documentation above, provide a summary of the client requirements for the project and the work you need to complete. Has all the information been provided such that a design can be developed? This includes detailed specifications and development and implementation factors. If not, what are the gaps? The client of the project requires the general project objectives, project scope, deliverables needed, the duration of the project and budget. The client will require documentation including Project requirement o Environmental effects and history of the site o Legislations, regulations, and standards given for the construction of building o structural model of the bridge o Material used in the construction o Budget details o timing needed for construction of the whole bridge Specifications, development, and implementation: the bridge is to be constructed on the swan river, Australia. most efficient and well performing machineries will be used for the construction making a structural model of the bridge with the help of expert civil engineers and architects It would take 16 months at least for the construction of the bridge. The budgets and project price will be discussed and negotiated in the meeting (on average the client will be charged around $560 million AUD for the project). The bride will be 0.75 kilometres in length. Proper allocation and number of employees and final project price and cost have not been identified and determined to the client.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Environmental impacts Environmental impacts Smoke originating from equipment like trucks, loaders, and other assets; burning fuels releasing gases like methane, carbon dioxide, etc. ( these gases and smoke is not environmentally friendly) Construction sites produce excessive noise delayed traffic pollution at the site of construction also contributes to the climate Smoke originating from equipment like trucks, loaders, and other assets; burning fuels releasing gases like methane, carbon dioxide, etc. ( these gases and smoke is not environmentally friendly) Construction sites produce excessive noise delayed traffic pollution at the site of construction also contributes to the climate
Model1 design of house Model1 design of house If the civil engineers did not find the dimensions and the design accurate and acceptable, we can make some changes as per suggested and design the final model for the house construction
Model 2: Final design for House construction. Model 2: Final design for House construction.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help