University of Illinois Urbana Champaign Assignment
Department of Civil and Environmental Engineering Fall2023
CEE 422 Construction Cost Analysis
Assignment # 1
(Rough Estimating and Cost Indexes)
"I pledge to uphold the CEE Honor Code.”
Mohammed Mujthaba Ajazul Haq
ulhaq3@illinois.edu
Q 1) Exercise 1 (3 points)
Over 7 years ago your company built a restaurant in New London, Connecticut. It was completed
in 2016 with a total cost of $4,940,000. You were awarded a contract for a similar restaurant.
(Almost same design) that you are building this year (2023) in Daytona Beach, Florida. a) What is the estimated cost of the restaurant? b) If in 2020 you had built a similar restaurant in Decatur, Illinois, what would have been the
cost of it?
Solution
: -
a)
DAYTONA BEACH, FLORIDA.
1)
Time adjustment using the Historical Cost Indexes
INDEX New London, Connecticut: - 207.3
INDEX Daytona Beach, Florida: - 318.8
Cost in Year A = Cost in Year B X Index A
Index B
I assumed the basic cost of restaurant of New London, Connecticut 2016 $4940000
= 4940000 = x X 207.3
318.8
= $7597067.035
2)
Location adjustment using the City Cost Indexes:
City A Cost (Unknown) = City B Cost (Known) X City A Index
City B Index
= x = 7597067.035 X 87.9
101.4
= $6585623.21
Assignment # 1 – Solution Page | 1
University of Illinois Urbana Champaign Assignment
Department of Civil and Environmental Engineering Fall2023
CEE 422 Construction Cost Analysis
b) DECATUR, ILLINOIS
1)
Time adjustment using the Historical Cost Indexes
INDEX New London, Connecticut: - 207.3
INDEX Decatur, Illinois: - 234.6
Cost in Year A = Cost in Year B X Index A
Index B
= 4940000 = x X 207.3
234.6
= $5590564.399
2)
Location adjustment using the City Cost Indexes:
City A Cost (Unknown) = City B Cost (Known) X City A Index
City B Index
= x =5590564.399 X 101.2
101.4
= $5579537.645
Assignment # 1 – Solution Page | 2
University of Illinois Urbana Champaign Assignment
Department of Civil and Environmental Engineering Fall2023
CEE 422 Construction Cost Analysis
Q 2) Exercise 2 (3 points)
You are doing a rough cost estimate for a warehouse. The estimated gross area of the warehouse is 210,000 sf. You have historical cost data from similar previous projects (shown below). Based on these data, what is your estimate for this warehouse? State which estimating method you have
used.
Project
Total Project Cost Size (sf) 1
$46,478,500 223000
2
$13,609,300 96500
3
$23,087,100 100960
4
$12,107,360 65500
5
$38,645,500 176000
6
$31,266,510 193000
Solution
: -
Project
Total Project Cost Size (sf) Cost Per Square ft
1
$46,478,500 223000
$
208.42
2
$13,609,300 96500
$
141.03
Smallest Unit Cost
3
$23,087,100 100960
$
228.68
Largest Unit Cost
4
$12,107,360 65500
$
184.85
5
$38,645,500 176000
$
219.58
6
$31,266,510 193000
$
162.00
Formula: - UC = A
+
4
B
+
C
6
UC = forecast unit cost of proposed project
A = minimum unit cost of previous projects
B = average unit cost of previous projects
C = maximum unit cost of previous projects
Average: - ∑ (Unit Cost)/total no of Projects =
1144.56
6
= 190.7
Assignment # 1 – Solution Page | 3
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Please give me right answer according to the question.. Don't copy from websites..
Note: This is not an assignment question. Thank you.
Question :After reading the plan of the project, you have found out that the specified rebars are not locally available, What will be your action for this problem and why?
arrow_forward
TASK:
QUALITY MANAGEMENT TOOLS
12th September 2024
QUALITY MANAGEMENT PLAN - INDUSTRIAL GARAGE
For the Industrial Garage Case Study (week 2) - prepare a high level quality management plan
outlining three key (for each component):
•
Quality Planning tools;
•
Quality Assurance tools; and
•
Quality Control tools
Try to keep cost/benefit considerations in mind when selecting your methods.
Note: Your plan is to address ONLY the construction phase through to project commissioning.
arrow_forward
A contract to build a 2-storey residential building is awarded to you. A Notice to Proceed (NTP) is given to you in 7 days. List down at least 10 activities you are going to do to start the project on time and explain each relevant activity.
arrow_forward
Construction-Management: i need the answer quickly,i need all the steps, clear and understandable handwriting, please.
arrow_forward
I need a quick solution within 15 minutes
arrow_forward
A chew – good restaurants, Inc. grew from a highly successful first restaurant made from two turn-of- the- century railroad cars . Similar restaurants followed and the décor, menus and operating procedures were standardized.
One of critical aspect of arrangement is design and construction of the restaurant itself. This job has broken into the set tasks or activities presented in the following table: Draw Gantt Chart, Calculate the total the minimum time of the project , Find the critical path
arrow_forward
Engineering Management
arrow_forward
OSHA Subject ( give sample answer ) 5 lines
arrow_forward
Question 48
schedule is a schedule in which the resources for a project are assigned to activities so the activities can be closely monitored.
O resource-loaded
O time-loaded
A
look-ahead
O preliminary
amazon
Bcer
F12
Scr Lk
Artêtdéf
PrtSclimpréc
SysRg/Syst.
F4
F5
F6
F7
F8
F9
F10
F11
Bre
VA
arrow_forward
Engr-429 Construction Management
1. Given the following construction progress chart, calculate the weekly cumulative progress
through the end of week 5, and show the curve on the chart. The total project labor hours is
33,985, the percent complete shown is actual progress for each activity. You must calculate
the weight of each activity.
Shows planned schedule
Shows actual progress
Operation
1. Clear and
Grubbing
2. Drainage
3. Subgrade
5. Pave
6. Testing
Hours Wt.
7. Striping
1625
4. Base Course 8125
405
8745
14005
280
500
8. Punch List 400
SCH
ACT
SCH
ACT
SCH
ACT
SCH
ACT
SCH
ACT
SCH
ACT
SCH
ACT
SCH
ACT
1
10
2
40
30
15
3
80
160
30
4
100
100
55
Weeks
5
6
15
85
40
15
Fall 2023
7 8 9 10
The individual weight is simply the percentage the activity represents of the total project labor
hours.
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
arrow_forward
Q5/ The structural engineering design section within the engineering
department of a regional electrical utility corporation has developed
several standard designs for a group of similar transmission line towers.
The detailed design for each tower is based on one of the standard designs.
A transmission line project involving 50 towers has been approved. The
estimated number of engineering hours needed to accomplish the first
detailed tower design is 126. Assuming a 95% learning curve,
a. What is your estimate of the number of engineering hours needed to
design the eighth tower and to design the last tower in the project?
b. What is your estimate of the cumulative average hours required for the
first five designs?
arrow_forward
One-page resume that can be apply jobs for civil engineering after 3-4 years when you graduate in Civil Engineering
arrow_forward
Using the same CPM diagram, what is the total project duration?
Immediate
Estimated
Activity
Activity Description
Predecessors
Duration
A
Excavate
2 weeks
Lay the foundation
Put up the rough wall
Put up the roof
Install the exterior plumbing
Install the interior plumbing
Put up the exterior siding
Do the exterior painting
B
A
4 weeks
C
10 weeks
D
C
6 weeks
4 weeks
5 weeks
7 weeks
9 weeks
7 weeks
8 weeks
4 weeks
E
C
F
E
G
D
E, G
Do the electrical work
F, I
Put up the wallboard
Install the flooring
Do the interior painting
Install the exterior fixtures
K
5 weeks
M
2 weeks
N
Install the interior fixtures
K, L
6 weeks
Total = 79 weeks
arrow_forward
Construction problems and solutions
SITUATION 2: You are within two weeks of
turnover of a three-story build-to-suit office
building project. Many of the city inspections
are complete and it appears that a certificate
of occupancy (C of O) will be obtained on
time. Only the fire protection, elevator, and
life safety inspections remain. The
mechanical, electrical, fire protection and life
safety were all design-build systems. During
the punch list, it is discovered that the fire
protection subcontractor has installed a
different type of sprinkler head on each floor.
The first floor uses concealed heads with
white escutcheons to match the ceiling tiles.
The second floor uses decorative chrome
heads. The subcontractor installed
semi-recessed heads on the third floor. This
was not picked up prior as a person cannot
physically see more than one floor at a time.
The client is very upset.
QUESTION: Can you require the
subcontractor to change them all out now?
Would this be a good move given…
arrow_forward
ALESHOMA Indoor environmental quality assessment
(IE) Assessment
The three questions below are independent:
JEA(indoon Environment Quality), in any LEED Certified building
(3.1) For your homework #2 what are the biggest challenge(s) during the process of
conducting the IEQ assessment for the building you selected? List 1-2 challenges that
you encountered and explain. If you did not experience any challenges in your opinion,
list 1-2 limitations of your work (every work has some limitations). Provide the potential
solution(s) to the challenges/limitations identified.
6 11
arrow_forward
PLEASE HELP
CW1
1. Feasibility study: Outline design proposals including an appropriate structural form and materials with a justified selection of options.
Also, discuss the sustainable structural system and construction methods include:
1. Environmental friendly material and load bearing systems,
2. using renewable and recyclable materials
3. Methods of reducing the embodied energy in building materials 4. reducing the energy consumption of the finished buildings.
THANK YOU
arrow_forward
You are within two weeks of turnover of a three-story build-to-suit office building project. Many of the city inspections are complete and it appears that a certificate of occupancy (C of O) will be obtained on time. Only the fire protection, elevator, and life safety inspections remain. The mechanical, electrical, fire protection and life safety were all design-build systems. During the punch list, it is discovered that the fire protection subcontractor has installed a different type of sprinkler head on each floor. The first floor uses concealed heads with white escutcheons to match the ceiling tiles. The second floor uses decorative chrome heads. The subcontractor installed semi-recessed heads on the third floor. This was not picked up prior as a person cannot physically see more than one floor at a time. The client is very upset.
arrow_forward
develop a WBS for your assumed building project. Mention duration for each activity of your project and total completion time.
arrow_forward
3. (1) Define critical path, ES, EF, LS, LF, dummy activity and slack.
(2) Cables By Us is bringing a new product on line to be manufactured in their current facility in
existing space. The owners have identified 11 activities and their precedence relationships.
(a) Draw the network diagram of this project
(b) Calculate the project completion time
(c) Identify the critical path
日
OF 5
SONY
arrow_forward
Give an example of a computation showing
the length of service (duration) of a
replacement in BAC (Bids and Awards
Committee) ( Subject: Construction
Engineering Project Management)
arrow_forward
SITUATION 2: You are within two weeks of turnover of a three-story build-to-suit office building project. Many of the city inspections are complete and it appears that a certificate of occupancy (C of O) will be obtained on time. Only the fire protection, elevator, and life safety inspections remain. The mechanical, electrical, fire protection and life safety were all design-build systems. During the punch list, it is discovered that the fire protection subcontractor has installed a different type of sprinkler head on each floor. The first floor uses concealed heads with white escutcheons to match the ceiling tiles. The second floor uses decorative chrome heads. The subcontractor installed semi-recessed heads on the third floor. This was not picked up prior as a person cannot physically see more than one floor at a time. The client is very upset.
QUESTION: Can you require the subcontractor to change them all out now? Would this be a good move given the status of the inspections? What…
arrow_forward
Draw manually a WBS for your assumed building project. Mention duration for each activity of your project and total completion time.
arrow_forward
Describe the procedure for ensuring that all tools and equipment are available prior to undertaking the activity.
arrow_forward
Based on the following statement, select the System Request element.
This project has been initiated to access the attendance information in generating student attendance reports and reducing clerical work.
A.
Business Need
B.
Business Value
C.
Project Sponsor
D.
Business Requirement
arrow_forward
Assignment # 1
3. For the following schedule, draw the arrow diagram
(AOA), perform the CPM calculations, mark the
critical path, and complete the table.
Activity Duration Precedent ES EFLS LFTFFF
A
B
C
D
E
F
G
H
I
J
K
L
M
3
10
7
6
5
4
2
4
10
6
4
2
1
A
A
B
B, C
с
D
D, E
E
E, F
G, H, I
H, I
J, L
CRITICAL PATH
arrow_forward
Draw the activity-on-node (AON) project network associated with the following activities for Habib and Sons construction project. How long should it take Habib and his teamto complete this project? What are the critical path activities? Activity Duration PredecessorsA 3 -B 4 AC 6 AD 6 BE 4 BG 4 CH 6 DI 8 E, FRequired: Draw the Network Diagram Calculate the total project duration Identify the critical path
arrow_forward
Using MS Project schedule the precedence diagram for the project
arrow_forward
Personal profile description for a currently civil eng student example?
arrow_forward
Part 1: Take-home and Viva activity related to topics covered in LO1.
|You work as a mechanical software engineer in a mechanical company which provides modelling and
design services for different types of mechanical applications. Your main tasks are to analyze and assess
different designs and obtain optimal solutions prior to any prototyping or manufacturing step. Your
direct manager assigned you to work on specific tasks for different running projects.
Project 1:
Simply supported beams are usually used in structures due to their high stability and performance in resisting
shear stress and bending moment, they are applied in variety of applications such as steel-frame used for
advertisement cars' chassis and bridges. Your role in a structure design company is to analyze and design the
bridge based on simply supported beam theory. Your manager asked you to calculate the distribution of shear
force, bending moment and stress đue to bending for bridge modeled as simply supported beam…
arrow_forward
One-page resume that can be used when you apply for your dream jobs after 3-4 years when you graduate in Civil Engineering.
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Related Questions
- Please give me right answer according to the question.. Don't copy from websites.. Note: This is not an assignment question. Thank you. Question :After reading the plan of the project, you have found out that the specified rebars are not locally available, What will be your action for this problem and why?arrow_forwardTASK: QUALITY MANAGEMENT TOOLS 12th September 2024 QUALITY MANAGEMENT PLAN - INDUSTRIAL GARAGE For the Industrial Garage Case Study (week 2) - prepare a high level quality management plan outlining three key (for each component): • Quality Planning tools; • Quality Assurance tools; and • Quality Control tools Try to keep cost/benefit considerations in mind when selecting your methods. Note: Your plan is to address ONLY the construction phase through to project commissioning.arrow_forwardA contract to build a 2-storey residential building is awarded to you. A Notice to Proceed (NTP) is given to you in 7 days. List down at least 10 activities you are going to do to start the project on time and explain each relevant activity.arrow_forward
- Construction-Management: i need the answer quickly,i need all the steps, clear and understandable handwriting, please.arrow_forwardI need a quick solution within 15 minutesarrow_forwardA chew – good restaurants, Inc. grew from a highly successful first restaurant made from two turn-of- the- century railroad cars . Similar restaurants followed and the décor, menus and operating procedures were standardized. One of critical aspect of arrangement is design and construction of the restaurant itself. This job has broken into the set tasks or activities presented in the following table: Draw Gantt Chart, Calculate the total the minimum time of the project , Find the critical patharrow_forward
- Engineering Managementarrow_forwardOSHA Subject ( give sample answer ) 5 linesarrow_forwardQuestion 48 schedule is a schedule in which the resources for a project are assigned to activities so the activities can be closely monitored. O resource-loaded O time-loaded A look-ahead O preliminary amazon Bcer F12 Scr Lk Artêtdéf PrtSclimpréc SysRg/Syst. F4 F5 F6 F7 F8 F9 F10 F11 Bre VAarrow_forward
- Engr-429 Construction Management 1. Given the following construction progress chart, calculate the weekly cumulative progress through the end of week 5, and show the curve on the chart. The total project labor hours is 33,985, the percent complete shown is actual progress for each activity. You must calculate the weight of each activity. Shows planned schedule Shows actual progress Operation 1. Clear and Grubbing 2. Drainage 3. Subgrade 5. Pave 6. Testing Hours Wt. 7. Striping 1625 4. Base Course 8125 405 8745 14005 280 500 8. Punch List 400 SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT 1 10 2 40 30 15 3 80 160 30 4 100 100 55 Weeks 5 6 15 85 40 15 Fall 2023 7 8 9 10 The individual weight is simply the percentage the activity represents of the total project labor hours. 100% 90% 80% 70% 60% 50% 40% 30% 20% 10%arrow_forwardQ5/ The structural engineering design section within the engineering department of a regional electrical utility corporation has developed several standard designs for a group of similar transmission line towers. The detailed design for each tower is based on one of the standard designs. A transmission line project involving 50 towers has been approved. The estimated number of engineering hours needed to accomplish the first detailed tower design is 126. Assuming a 95% learning curve, a. What is your estimate of the number of engineering hours needed to design the eighth tower and to design the last tower in the project? b. What is your estimate of the cumulative average hours required for the first five designs?arrow_forwardOne-page resume that can be apply jobs for civil engineering after 3-4 years when you graduate in Civil Engineeringarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,