Concept explainers
A
Interpretation: The average utilization rate of the secretary should be calculated.
Concept Introduction: Utilization rate is average the time spend by a person in productivity activity. It is calculated as percentage.
B
Interpretation: The probability for the page waiting or processed should be calculated.
Concept Introduction: Waiting line model is used to calculate the performance. The probability in a waiting line requires to wait for service.
C
Interpretation: The average number of pages is to be processed.
Concept Introduction: Waiting line model is used to calculate the performance. The probability in a waiting line requires to wait for service.
Want to see the full answer?
Check out a sample textbook solutionChapter B Solutions
Operations Management: Processes and Supply Chains, Student Value Edition Plus MyLab Operations Management with Pearson eText -- Access Card Package (12th Edition)
- A large insurance company maintains a central computing system that contains a variety of information about customer accounts. Insurance agents in a six-state area use telephone lines to access the customer information database. Currently, the company's central computer system allows three users to access the central computer simultaneously. Agents who attempt to use the system when it is full are denied access; no waiting is allowed. Management realizes that with its expanding business, more requests will be made to the central information system. Being denied access to the system is inefficient as well as annoying for agents. Access requests follow a Poisson probability distribution, with a mean of 29 calls per hour. The service rate per line is 19 calls per hour. (a) What is the probability that 0, 1, 2, and 3 access lines will be in use? (Round your answers to four decimal places.) P(0) = P(1) = P(2) = P(3) = (b) What is the probability that an agent will be denied access to the…arrow_forwardTrue or False? The average number of customers in queue plus the number of servers equals the average number of customers in the system. The main cause of delay at Logan Airport was overbooking, and building a new runway solved the delay problem. If a company hopes to increase the capacity of a process, the company needs to try to shorten the process’s cycle time. Little’s Law only applies to an M/M/1 queue, which is a special case of a G/G/C queue. If a queuing system has deterministic arrival rate λ and service rate μ, and λ < μ, then Lq = 0 in this queue.arrow_forwardBOBO Van is a start-up company which develops an app to receive orders from customers and provide delivery service. It owns one single vehicle. Two workers form a crew. The whole crew, which includes both workers working as a team, is needed to complete the delivery service. On average, an order arrives every 20 minutes while it takes 15 minutes on average to complete the order. If an order arrives while the crew is working on another order, the arriving order needs to join the waiting line for service. Assume the app provide adequate quota to accommodate essentially any number of orders waiting in the line. What is the average number of orders in the waiting line? Group of answer choices 0.1227 0.0333 3 0.5 2.25arrow_forward
- The time from when a patient is discharged from North Shore Hospital to the time the discharged patient’s bed is ready to be assigned to a new patient is referred to as the bed assignment turnaround time. If the bed turnaround time is excessive, it can cause problems with patient flow and delay medical procedures throughout the hospital. This can cause long waiting times for physicians and patients thus creating customer dissatisfaction. The admissions RN has assigned a patient care associate to measure the bed turnaround time for a randomly selected bed each morning., afternoon, and evening for 30 days. Following are the bed turnaround time sample observations: Day Day Bed Turnaround Times (min) 1 1 127 135 167 144 151 2 2 140 155 122 135 119 3 3 112 128 97 118 131 4 4 223 135 154 187 150 5 5 181 155 160 172 166 6 6 103 158 145 124 149 7 7 146 135 167 150 178 8 8 104 122 115 137 129 9 9 136 158 137 148 156 10 10 145 163 106 139 170 11 11 84 146 125 98…arrow_forwardRepair calls are handled by one repairman at a photocopy shop. Repair time, including travel time, is exponentially distributed, with a mean of 2.5 hours per call. Requests for copier repairs come in at a mean rate of 2.1 per eight-hour day (assume Poisson). a. Determine the average number of customers awaiting repairs. (Round your answer to 2 decimal places.) Number of customers b. Determine system utilization. (Round your answer to the nearest whole percent. Omit the "%" sign in your response.) System utilization % c. Determine the amount of time during an eight-hour day that the repairman is not out on a call. (Use your rounded answer from Part b. Round your answer to 2 decimal places.) Amount of time hours d. Determine the probability of two or more customers in the system. (Do not round intermediate calculations. Round your answer to…arrow_forwardDescribe the implications for customer service and serverskills when using a single-line, single-server, single-phase waitingline systemarrow_forward
- A graphics reproduction firm has four units of equipment that are automatic but occasionally become inoperative because of the need for supplies, maintenance, or repair. Each unit requires service roughly twice each hour, or, more precisely, each unit of equipment runs an average of 30 minutes before needing service. Service times vary widely, ranging from a simple service (such as pressing a restart switch or repositioning paper) to more involved equipment disassembly. The average service time, however, is five minutes. Equipment downtime results in a loss of $20 per hour. The one equipment attendant is paid $6 per hour.Using finite queuing analysis, answer the following questions: a. What is the average number of units in line? b. What is the average number of units still in operation? c. What is the average number of units being serviced?d. The fi- rm is considering adding another attendant at the same $6 rate. Should the firm do it?arrow_forwardYourNurse (YN) Inc. uses certified nurses to answer medical queries from customersover the phone. When patients call into YN, they are first asked to provide their zipcode, which then allows YN to route their call to the call center nearest to the patient(it operates 10 across the country). Which single suggestion in the following list (andexplanation) is most likely to reduce the average time callers wait before speaking witha nurse?a. Run an advertising campaign to increase demand and to better utilize its nurses.b. Train its nurses so that they spend more time answering the patients’ questions.c. Instead of using callers’ zip codes, route calls to the call center with the fewest callersto help prevent situations in which there are idle nurses at the same time that there arecallers on hold.d. Play a recording of useful medical information while callers are on hold so as todecrease their perception of how long they are waiting.e. None of the abovearrow_forwardA single server queuing system with a Poisson arrival rate and exponential service time has an average arrival rate of 6 customers per hour and an average service rate of 15 customers per hour. The average length of time customers will spend in the system is: O a. 2.667 minutes O b. 0.1111 minutes O c. 6.667 minutes O d. 0.04444 minutesarrow_forward
- Please do not give solution in image format thankuarrow_forwardplease answer within 30 minutes.arrow_forwardSuppose a coffee shop order and fulfillment process is configured simply as a single queue with two steps: wait and service. Customers enter, wait their turn, and then are served, by placing and receiving their order all at once. Suppose that an average of 10 customers per hour enter the coffee shop while the shop is open. On average, there are two customers waiting in line to place their orders. It takes an average of 2 minutes to go through the service step, that is, it takes 2 minutes to complete the second step of placing and receiving the order. In steady state, O The average wait time before placing an order is 12 minutes. O The average time between customer arrivals is 5 minutes. O None of the answers are correct. There is an average of one customer being served at a time. O The average total time to wait and be served is 15 minutes.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,