Question
Book Icon
Chapter 9, Problem 18P
To determine

The LOS, v/c, veh-mi in the peak 15min and peak hr, and total travel time in the peak 15min.

Expert Solution & Answer
Check Mark

Answer to Problem 18P

The level of service is E, volume to capacity ratio is 0.35, the total number of vehicle miles during the peak 15min period is 1276veh/mi, the total number of vehicle miles during the peak period is 4950veh/mi and the total travel time in peak 15min period is 33.5veh/h.

Explanation of Solution

Given:

Base free flow speed is 55mi/h.

Lane width is 11ft.

Shoulder width is 3ft.

Access points per mile is 15.

Formula used:

Write the expression to calculate the value of fHV.

fHV=11+PT(ET1)+PR(ER1)   ...... (I)

Here, PT is decimal portion of trucks in the traffic stream, PR is decimal portion of RV's in the traffic stream, ET is passenger car equivalent for trucks and ER is passenger car equivalent for RV's.

Write the expression for peak 15min hourly passenger car equivalent.

vp=V(PHF)(fG)(f HV)   ...... (II)

Here, V is demand volume for the entire peak hour, PHF is the peak hour factor, fG is grade adjustment factor for level or rolling terrain and fHV is adjustment factor to account for heavy vehicles in the traffic stream.

Write the expression to calculate the base percent time spent following.

BPTSF=100(1e0.000879vp)   ...... (III)

Here, BPTSF is the base time percent spent following and vp is the peak 15min hourly passenger car equivalent.

Write the expression to calculate the percent time following.

PTSF=BPTSF+fdnp   ...... (IV)

Here, fdnp is the adjustment in PTSF to account for the combined effect.

Write the expression to calculate the free flow speed.

FFS=BFFSfLSfA   ...... (V)

Here, FFS is the free flow speed, BFFS is the base free flow speed, fLN is adjustment for lane and shoulder width and adjustment for number of access point per mile.

Write the expression to calculate the average travel speed.

ATS=FFS0.00776vpfnp   ...... (VI)

Here, ATS is the average travel speed and fnp is adjustment for the percentage of no passing zones.

Write the expression to calculate the volume to capacity ratio.

vc=vpc   ...... (VII)

Here, v is the volume and c is the capacity.

Write the expression to calculate the total number of vehicle miles during 15min peak.

VMT=0.25(VPHF)Lt   ...... (VIII)

Here, Lt is the total length of the analysis segment.

Write the expression to calculate the number of vehicle miles during the peak hour.

VMT60=VLt   ...... (IX)

Write the expression to calculate the total travel time in peak 15min period.

TT15=VMT60ATS   ...... (X)

Calculation:

Refer table 9.5, "Passenger car equivalents for trucks and RV's to determine the percent time spent following on two way and directional segments.

The value of ET for level terrain is 1.1.

The value of ER for level terrain is 1.0.

Substitute 10% for PT, 1.1 for ET, 7% for PR and 1.0 for ER in equation (I).

fHV=11+10%( 1.11)+7%( 11)=11+0.10( 0.1)=0.99

Substitute 1100veh/h for V, 0.97 for PHF, 1 for fG and 0.99 for fHV in equation (II).

vp=1100veh/hr( 0.97)(1)( 0.99)=1146pc/h

Substitute 1146pc/h for vp in equation (III).

BPTSF=100(1e 0.00879×1146)=63.48%

Refer table 9.3, "Adjustment for combined effect of directional distribution of traffic and percentage of no passing zones on percent time spent following on two way segments.

The value of fdnp is 7.47%.

Substitute 63.48% for PTSF and 7.47% for fdnp in equation (IV).

PTSF=63.48%+7.47%=70.95%

Substitute 55mi/h for BFFS, 3mi/h for fLS and 3.75mi/h for fA in equation (V).

FFS=55mi/h3mi/h3.75mi/h=48.25mi/h

Refer table 9.6, "Adjustment for effect of no passing zones on average travel speed on two way segments".

The value of fnp is 1.284mi/h.

Substitute 48.25mi/h for FFS, 1146pc/h for vp and 1.284mi/h for fnp in equation (VI).

ATS=48.25mi/h(0.00776×1146pc/h)1.284=38.07mi/h

Refer table 9.1, "Level of service criteria for two lane highways in class I.

The value of PTSF is 70.95% and ATS IS 38.07mi/h, therefore the level of service is E.

Substitute 1146pc/h for vp and 3200pc/h for c in equation (VII).

vc=1146pc/h3200pc/h=0.35

Substitute 1100veh/h for V, 0.45mi for Lt and 0.97 for PHF in equation (VIII).

VMT=0.25( 1100 veh/ hr 0.97)×4.5mile=1276veh/mi

Substitute 1100veh/h for V and 4.5mile for Lt in equation (IX).

VMT60=1100veh/h×4.5mile=4950veh/mile

Substitute 1276veh/mi for VMT and 38.07mi/h for TT15 in equation (X).

TT15=1276veh/mi38.07veh/h=33.5veh/h

Conclusion:

Therefore, the level of service is E, volume to capacity ratio is 0.35, the total number of vehicle miles during the peak 15min period is 1276veh/mi, the total number of vehicle miles during the peak period is 4950veh/mi and the total travel time in peak 15min period is 33.5veh/h.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Draw the updated network. Calculate the new project completion date. Check if there are changes to the completion date and/or to the critical path. Mention the causes for such changes, if any. New network based on the new information received after 15 days (Correct calculations, professionally done). Mention if critical path changes or extended. Write causes for change in critical path or extension in the critical path.
The single degree of freedom system shown in Figure 3 is at its undeformed position. The SDOF system consists of a rigid beam that is massless. The rigid beam has a pinned (i.e., zero moment) connection to the wall (left end) and it supports a mass m on its right end. The rigid beam is supported by two springs. Both springs have the same stiffness k. The first spring is located at distance L/4 from the left support, where L is the length of the rigid beam. The second spring is located at distance L from the left support.
For the system shown in Figure 2, u(t) and y(t) denote the absolute displacements of Building A and Building B, respectively. The two buildings are connected using a linear viscous damper with damping coefficient c. Due to construction activity, the floor mass of Building B was estimated that vibrates with harmonic displacement that is described by the following function: y(t) = yocos(2πft). Figure 2: Single-degree-of-freedom system in Problem 2. Please compute the following related to Building A: (a) Derive the equation of motion of the mass m. (20 points) (b) Find the expression of the amplitude of the steady-state displacement of the mass m. (10 points
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning