Computation of (a-b):

  • It is given that the value assigned to a is “2000000000” and the value assigned to b is “-a”, which is “-2000000000”.
  • Whenever the result of an arithmetic operation is out of range, it returns an overflow, which can be stored in the result variable.
  • In order to store the result, the value is wrapped around and is assigned to the result variable...

Explanation of Solution

Computation of (b-a):

  • It is given that the value assigned to a is “2000000000” and the value assigned to b is “-a”, which is “-2000000000”.
  • Whenever the result of an arithmetic operation is out of range, it returns an overflow, which can be stored in the result variable.
  • In order to store the result, the value is wrapped around and is assigned to the result variable...

Explanation of Solution

Result of Integer.compare(a, b):

  • The method Integer.compare(a, b) compares two test values for the order in which they must come.
  • If the variable on the left side is less than the right side, then “-1” is returned.
  • Otherwise, if the variable on the left side is greater than the right side, then “1” is returned...

Explanation of Solution

Result of Integer.compare(b, a):

  • The method Integer.compare(b, a) compares two test values for the order in which they must come.
  • If the variable on the left side is less than the right side, then “-1” is returned.
  • Otherwise, if the variable on the left side is greater than the right side, then “1” is returned...

Blurred answer
Students have asked these similar questions
Using the notation

you can select multipy options
For each of the following, decide whether the claim is True or False and select the True ones: Suppose we discover that the 3SAT can be solved in worst-case cubic time. Then it would mean that all problems in NP can also be solved in cubic time. If a problem can be solved using Dynamic Programming, then it is not NP-complete. Suppose X and Y are two NP-complete problems. Then, there must be a polynomial-time reduction from X to Y and also one from Y to X.

Chapter 9 Solutions

BIG JAVA: LATE OBJECTS

Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Database System Concepts
Computer Science
ISBN:9780078022159
Author:Abraham Silberschatz Professor, Henry F. Korth, S. Sudarshan
Publisher:McGraw-Hill Education
Text book image
Starting Out with Python (4th Edition)
Computer Science
ISBN:9780134444321
Author:Tony Gaddis
Publisher:PEARSON
Text book image
Digital Fundamentals (11th Edition)
Computer Science
ISBN:9780132737968
Author:Thomas L. Floyd
Publisher:PEARSON
Text book image
C How to Program (8th Edition)
Computer Science
ISBN:9780133976892
Author:Paul J. Deitel, Harvey Deitel
Publisher:PEARSON
Text book image
Database Systems: Design, Implementation, & Manag...
Computer Science
ISBN:9781337627900
Author:Carlos Coronel, Steven Morris
Publisher:Cengage Learning
Text book image
Programmable Logic Controllers
Computer Science
ISBN:9780073373843
Author:Frank D. Petruzella
Publisher:McGraw-Hill Education