Chapter 8.10, Problem 22P
Summary Introduction
To determine: The optimal sequencing of jobs using evolutionary solver.
Introduction: The variation between the present value of the
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
FRUIT COMPUTER COMPANY
Fruit Computer Company manufactures memory chips in batches of ten chips. From past experience, Fruit knows that 80% of all batches contain 10% (1 out of 10) defective chips, and 20% of all batches contain 50% (5 out of 10) defective chips. If a good (that is, 10% defective) batch of chips is sent to the next stage of production, processing costs of $4000 are incurred, and if a bad batch (50% defective) is sent on to the next stage of production, processing costs of $16000 are incurred. Fruit also has the alternative of reworking a batch at a cost of $4000. A reworked batch is sure to be a good batch. Alternatively, for a cost of $400, Fruit can test one chip from each batch in an attempt to determine whether the batch is defective.
QUESTIONS
1.Determine a strategy so Fruit can minimize the expected total cost per batch.
2.Compute the EVSI and EVPI.
According to the XYZ Apartment Rental Company ER diagram, which of the following is true?
Each building must have more than one builder
Each building must have multiple apartments
Each building must have at least 8 apartments
Each building must have more than 2 apartments
Answer: ____
A custom motor cycle shop is experiencing high demand from its customers for its services. The owner performs all tasks relating to customization.
Assume each customer brings one motor cycle for customization. The owner needs to determine if he needs to add more help to meet customer
demand. A week has 40 hours ( maximum amount of time for the owner to work) The maximum number of customizations that can be done per
week is 10 bikes ( if there is no wasted time). The following is the data collected from observations for a typical week :
Every Friday the shop is cleaned by the owner. This takes 4 hours.
- 15 % of the customizations needs rework which takes 50 % more time than regular customization
- 10 % of the customers will be called by the owner. This takes 2 hours per customer.
Determine OEE. How should the owner handle the business ?
Show all formulas used, calculations and results. Do on Blk Bd
For the toolbar, press ALT+F10 (PC) or ALT+FN+F10 (Mac).
Chapter 8 Solutions
Practical Management Science, Loose-leaf Version
Ch. 8.3 - Prob. 1PCh. 8.3 - Prob. 2PCh. 8.4 - Prob. 3PCh. 8.4 - Prob. 4PCh. 8.4 - Prob. 5PCh. 8.5 - Prob. 6PCh. 8.5 - Prob. 7PCh. 8.5 - In the lawn mower production problem in Example...Ch. 8.6 - Prob. 9PCh. 8.6 - Prob. 10P
Ch. 8.6 - Prob. 11PCh. 8.6 - Prob. 12PCh. 8.7 - Prob. 13PCh. 8.7 - Prob. 14PCh. 8.8 - Prob. 15PCh. 8.9 - Prob. 17PCh. 8.9 - Prob. 18PCh. 8.10 - Prob. 20PCh. 8.10 - Prob. 21PCh. 8.10 - Prob. 22PCh. 8.10 - Prob. 23PCh. 8.10 - Prob. 24PCh. 8 - Prob. 25PCh. 8 - Prob. 26PCh. 8 - Prob. 27PCh. 8 - Prob. 28PCh. 8 - Prob. 29PCh. 8 - Prob. 30PCh. 8 - Prob. 31PCh. 8 - Prob. 32PCh. 8 - Prob. 33PCh. 8 - Prob. 34PCh. 8 - Prob. 35PCh. 8 - Prob. 36PCh. 8 - Prob. 37PCh. 8 - Prob. 38PCh. 8 - Prob. 39PCh. 8 - Prob. 40PCh. 8 - Prob. 41PCh. 8 - Prob. 42PCh. 8 - Prob. 43PCh. 8 - Prob. 44PCh. 8 - Prob. 46PCh. 8 - Prob. 1CCh. 8 - Prob. 2C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The Fly-Right Airplane Company builds small jet airplanes to sell to corporations for use by their executives. To meet the needs of these executives, the company's customers sometimes order a custom design of the airplanes being purchased. When this occurs, a substantial start-up cost is incurred to initiate the production of these airplanes. Fly-Right has recently received purchase requests from three customers with short deadlines. However, because the company's production facilities already are almost completely tied up filling previous orders, it will not be able to accept all three orders. Therefore, a decision now needs to be made on the number of airplanes the company will agree to produce (if any) for each of the three customers. The relevant data are given in the next table. The first row gives the start-up cost required to initiate the production of the airplanes for each customer. Once production is under way. the marginal net revenue (which is the purchase price minus the…arrow_forwardAuthor: Leo A. Ruggle, Professor, Department of Accounting, Mankato State University Arnie Armstrong has been with Pierce Auto Parts Manufacturing Company for 23 years. Recently, he was appointed Director of Manufacturing Computer Services. In just six weeks in this new position, [he] has moved to reduce the amount of information provided to manufacturing department managers by 60 percent. He argues that excess data is distracting, unused, and expensive to provide. Willy McClean has been department manager for 12 years. During a coffee break with some of his department production supervisors, Willy is quite vocal about the change. “Who’s this guy Armstrong to tell us what data we need? He needs to be out here for a few weeks to find out what it’s like. Keep it quiet, but I’ve got a contact in Computer Services who’ll get me all the data analyses I want for just a $20 bill each month. It’s a good deal, and Armstrong will never know. How does he expect us to make good decisions about…arrow_forwardA roller coaster is being designed for a new theme park. Two "trains" are on the track at any given time. One train is being unloaded/reloaded while the other is moving along the track. The track itself takes 10 minutes to complete. The train being loaded should depart before the arriving train is no closer than one minute away. Each car of a train accommodates four people. Loading a car is estimated to take 6 seconds per passenger. Unloading is estimated to take 6 seconds per passenger. Suppose that (unlike actual roller coasters), only one car can be loaded or unloaded at a time. Unloading can NOT occur at the same time as loading. In order to maximize the number of potential passengers, how many cars should the train be made up of? Round your answer to the nearest whole car.arrow_forward
- Green Vehicle Inc. manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/40 of a day and 1/60 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/50 of a day to assemble either type of vehicle in the assembly shop. A T1 truck and a C1 car yield profits of $300 and $220, respectively, per vehicle sold. a) Define the objective function and constraint equations. b) Graph the feasible region. c) What is a maximum-profit daily production plan at the new factory? d) How much profit will such a plan yield, assuming whatever is produced is sold?arrow_forwardPlease answer question completely and explain your answerarrow_forwardA political party is planning a half-hour television show. The show will have at least 3 minutos of direct requests for money from viowers Three of the party's politicians will be on the show-a senator, a congresswoman, and a governor The senator, a party "elder statesman," demands that he be on screen for at least twice as long as the governor The total time taken by the senator and the governor must be at least twice the time taken y the congresswoman Based on a pre-show survey, it is believed that 33, 38, and 43 (in thousands) viewers will watch the program for each minute the senator, congresswoman, and governor, respectively, are on the air. Find the time that should be allotted to each politician in order to get the maximum number of viewers Find the maximum number of viewers The quantity to be maximized, z, is the number of viewers in thousands. Let x, be the total number of minutes allotted to the senator, x, be the total number of minutes allottod to the congresswoman, and x,…arrow_forward
- Mr. Elf owns a show store. Currently, he has 10 pairs of shoes that require resoling and polishing. He has a machine that can resole one pair of shoes at a time, and the time required for the operation varies with the type and condition of the shoe and the type of sole that is used. Shoes are polished on a machine dedicated to this purpose as well, and polishing is always done after resoling. His assistant generally does the polishing while Mr. Elf does the resoling. The resoling and polishing times (in minutes) are: Shoes 1 Resoling Time 14 Polishing Time 3 2 28 1 3 12 2 4 6 5 5 10 10 6 14 6 7 4 12 8 25 8 9 10 15 10 5 5 Determine the sequence in which these shoes should be repaired to minimize the total makespan for these 10 jobs, and answer the following questions. Based on the optimal sequence: (Enter integer only) 1. The first job to be processed is Job 2. The third job to be processed is Job 3. The fourth job to be processed is Job 4. The fifth job to be processed is Job 5. The…arrow_forwardPlease make a comment on the following statement. There are many business applications with linear functions and non-linear functions. Some people think that linear models are particularly of interest due to simplicity and convenience, but some people believe that nonlinear models can simulate business operations better in practice, enabling business professionals to make more accurate decision.arrow_forwardmoney borrowed for personal reasons; to be repaid within a specific time frame and with added interest money borrowed for the purchase of real estate; to be repaid within a specific time frame and with added interest money borrowed for business reasons; to be repaid within a specific time frame and with added interest money borrowed for the purchase of a vehicle; to be repaid within a specific time frame and with added interest : Business Loan :: Auto Loan :: Mortgage Loan :: Personal Loan 1 4 6. 8. 9. Finish Siarrow_forward
- What is the answer in this number 4?arrow_forwardYou work for a small shipping company and warehouse. The owners have decided to update the software used for tracking, shipping, receiving, and inventory. Fifteen computers need to be updated. Hours of operation are 7 a.m. to 7 p.m. Monday through Saturday. Each computer must be updated manually by one of two trained employees, both of whom must be borrowed from other managers. The update procedure consumes 4 hours of the updater's time and generates an additional 1.5 hours of computer downtime. The work must be performed at a central loading station, away from the current location of the computer. How does the project portfolio management approach lead to enhanced strategic management for an organization and give an example how you woulduse this in a work place?arrow_forwardA company has one machine which can be used to make product Alpha and product Beta. Each unit of product Alpha requires 45 minutes of machine time, while each unit of product Beta requires 37 minutes of machine time. The machine can be used for 8 hours per day and 5 days per week. Next week the company will produce 23 units of product Alpha. After completing the production of Alpha, the company will produce product Beta. How many units of product Beta can be produced next week? Use at least 4 decimals.You must showm your calculation steps and brief explanation on your Excel spreadsheets.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,