Traffic and Highway Engineering
5th Edition
ISBN: 9781305156241
Author: Garber, Nicholas J.
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Question
Chapter 8, Problem 7P
To determine
Whether the intersection meets MUTCD Warrants 1, 2 and 3 for signalization and to explain the way the warrant was met.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
A two-phase signal system is installed at an un-signalized + intersection with channelized left-turn lanes and shared through and right-turn lanes. Using a suitable diagram, determine the possible conflict points. Indicate the phasing system used.
What is the first area of the temporary traffic control zone?
O Maintenance Area
Advanced Warning Area
O Transition Area
O Activity Area
Which of the following is not a factor in determining the spacing of channelized devices?
The number of through lanes
The type of channelizing device
The location of the devices
Speed limit
Which of the following is NOT a type of taper?
Lane Shift
Lane Closure
Merging
Downstream
Two-Lane One-Way Tapers are use.
O When the work vehicles can safely park on the side of the road
O On one-way roadways
For special events only
O When flaggers are present
i need the answer quickly
Chapter 8 Solutions
Traffic and Highway Engineering
Ch. 8 - Prob. 1PCh. 8 - Prob. 2PCh. 8 - Prob. 3PCh. 8 - Prob. 4PCh. 8 - Prob. 5PCh. 8 - Prob. 6PCh. 8 - Prob. 7PCh. 8 - Prob. 8PCh. 8 - Prob. 9PCh. 8 - Prob. 10P
Ch. 8 - Prob. 11PCh. 8 - Prob. 12PCh. 8 - Prob. 13PCh. 8 - Prob. 14PCh. 8 - Prob. 15PCh. 8 - Prob. 16PCh. 8 - Prob. 17PCh. 8 - Prob. 18PCh. 8 - Prob. 19PCh. 8 - Prob. 20PCh. 8 - Prob. 21PCh. 8 - Prob. 22PCh. 8 - Prob. 23PCh. 8 - Prob. 24PCh. 8 - Prob. 25PCh. 8 - Prob. 26PCh. 8 - Prob. 27PCh. 8 - Prob. 28P
Knowledge Booster
Similar questions
- Determine whether a T intersection (one leg on the minor approach) with the hourly volume data satisfy MUTCD Warrant 3 (peak-hr vehicular volume) for signalization. All approaches have one lane entering the intersection. For the warrant that is met, explain how the warrant is met (rules applied, hours in which the volume criteria were met, etc.) and refer to necessary graphs and tables. The major street speed limit is 60 km/h, and the minor street speed limit is 40 km/h.arrow_forwardselect all correct options.arrow_forwardAn intersection has a four-phase signal with the movements allowed in each phase and corresponding and saturation flow rates shown in the table below. Phase 1 2 3 4 Allowed movements EB L, WB L EB T/R, WB T/R SB L, SB T/R NB L, NB T/R Analysis flow rate 245, 230 veh/h 975, 1030 veh/h 255, 235 veh/h 225, 215 veh/h Saturation flow rate 1750, 1725 veh/h 3350, 3400 veh/h 1725, 1750 veh/h 1700, 1750 vehh Calculate the sum of the flow ratios for the critical lane groups. O 0.714 O 0.723 0.751 0.702arrow_forward
- An intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired. O 15.552 sec O 11.462 sec O 14.825 sec Phase O 16.065 sec Allowed movements Analysis flow rate Saturation flow rate Using v/c equalization ratio, calculate the effective green time for phase 3 1 NB L, SB L 330, 365 veh/h 1700, 1750 veh/h 2 NB T/R, SB T/R 1125, 1075 veh/h 3400, 3300 veh/h EB L, WB L 110, 80 veh/h 650, 600 veh/h 3 EB T/R, WB T/R 250, 285 veh/h 1750, 1800 veh/harrow_forwardAn intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired. O 20.464 sec O 22.411 sec O 24.460 sec Phase O 21.035 sec Allowed movements Analysis flow rate Saturation flow rate Using v/c equalization ratio, calculate the effective green time for phase 2 NB L, SB L 330, 365 veh/h 1700, 1750 veh/h 2 NB T/R, SB T/R 1125, 1075 veh/h 3400, 3300 veh/h EB L, WBL 110, 80 veh/h 650, 600 veh/h 3 EB T/R, WB T/R 250, 285 veh/h 1750, 1800 veh/harrow_forwardQ5a. Otwebeweate has been selected as the capital of a newly created district. As the new District Engineer, the Chief and the elders of the town approach you and make a request for the installation of a traffic light at one of the key intersections with the reason that there is no single traffic signal in the town and the installation of one will lift the status of the town as a district capital. What will be your decision and how will you explain it to the Chief and eldersarrow_forward
- Task 3: The Intersection design a. Describe the various principles involved in the design of at-grade intersections and the different types of at-grade intersections. Also, give an example of an appropriate location for the use of each type. b. Design a suitable signal phasing system and phase lengths for the intersection using the Webster method. Show a detailed layout of the phasing system and the intersection geometry used for the geometric and traffic characteristics shown in table 6 below. And the saturation flow of the intersection is shown in table 7 Discuss the effect of increasing saturation flow rates by 10% higher on the cycle length? Table 6:The geometric and traffic characteristics of the intersection Approach (Width) North (56m) South (56 m) East (68m) West (68m) Peak hour approach volumes Left turn 133 73 168 134 Through movement 420 373 563 516 Right turn 140 135 169 178 Conflicting pedestrian volumes 900 1200 1200 900 PHF 0.95 0.95 0.95 0.95…arrow_forwardFind: A- the total hourly volume B- PHF C-flow rate Density Q3) A- List the Importance of Spot Speed Studies.. B- Explain pedestrian control devices..arrow_forwardPlease show all of your workarrow_forward
- An intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired. Phase 2 3 Allowed movements NB L, SB L NB T/R, SB T/R EB L, WBL EB T/R, WB T/R Analysis flow rate 330, 365 veh/h 1125, 1075 veh/h 110, 80 veh/h 250, 285 veh/h Saturation flow rate 1700, 1750 veh/h 3400, 3300 veh/h 650, 600 veh/h 1750, 1800 veh/h Calculate minimum cycle length O 255 sec O 155 sec O 100 sec O 60 secarrow_forwardQ3c. At a three leg (T) intersection, the two-way peak hour volume on the minor road is 500 veh/hr and that on the major road is 600 veh/hr. As a Traffic Engineer, what type of intersection control will you propose? What is the basis of your proposal?arrow_forwardWhat count period would you choose for the volume study at the intersection with signal cycle length (a) 60 seconds, (b) 90 seconds, and (c) 120 seconds?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning