Chapter 7, Problem 7.9P

(a)

To determine

Find the absolute permeability of the soil.

(a)

Expert Solution
Check Mark

Answer to Problem 7.9P

The absolute permeability of the soil is 8.4×1013m2_.

Explanation of Solution

Given information:

The length of the soil sample L is 400 mm.

The area of the sample A is 7,854mm2.

The diameter of the standpipe (d) is 11 mm.

The head difference (h1) at t=0 is 450 mm.

The head difference  (h2) at t=8min is 200 mm.

The unit weight of water (γw) is 9.789kN/m3.

The dynamic viscosity of water (η) is 1.005×103Ns/m2.

Calculation:

Determine the area of the standpipe a using the relation.

a=πd24

Substitute 11 mm for d.

a=π(11)24=95.03mm2

Determine the hydraulic conductivity k using the relation.

k=2.303(aLAt)log10(h1h2)

Substitute 95.03mm2 for a, 400 mm for L, 7,854mm2 for A, 8 min for t, 450 mm for h1, and 200 mm for h2.

k=2.303(95.03×4007,854×8min×60sec1min)log10(450200)=8.18×103mm/s×1cm10mm=8.18×104cm/sec

Determine the absolute permeability of the soil using the relation.

k=γwηK¯

Substitute 8.18×104cm/sec for k, 9.789kN/m3 for γw, and 1.005×103Ns/m2 for η.

8.18×104cm/sec×1m100cm=9.789×1031.005×103×K¯8.18×106×1.005×1039.789×103=K¯K¯=8.4×1013m2

Therefore, the absolute permeability of the soil is 8.4×1013m2_.

(b)

To determine

Find the head difference at 4 min time duration.

(b)

Expert Solution
Check Mark

Answer to Problem 7.9P

The head difference at 4 min time duration is 30cm_.

Explanation of Solution

Given information:

The length of the soil sample L is 400 mm.

The area of the sample A is 7,854mm2.

The diameter of the standpipe (d) is 11 mm.

The head difference (h1) at t=0 is 450 mm.

The head difference (h2) at t=8min is 200 mm.

The unit weight of water (γw) is 9.789kN/m3.

The dynamic viscosity of water (η) is 1.005×103Ns/m2.

Calculation:

Determine the head difference at 4 min time duration using the relation.

k=2.303(aLAt)log10(h1h2)

Substitute 8.18×104cm/sec for k, 95.03mm2 for a, 400 mm for L, 7,854mm2 for A, 8 min for t, and 450 mm for h1.

8.18×104cm/sec×10mm1cm=2.303(95.03×4007,854×4min×60sec1min)log10(450h2)8.18×1030.0464=log10(450h2)10(0.176)=(450h2)h2=4501.5

h2=300mm×1cm10mmh2=30cm

Therefore, the head difference at 4 min time duration is 30cm_.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
** Please do not put the n value as 0.024 it is incorrect. Also, please remember to identify the channel type.
7. A rectangular, unfinished concrete channel of 38-ft width is laid on a slope of 8 ft/mi. Determine the flow depth and Froude number of the flow if the flowrate is 400 ft³/s.
***Please MAKE SURE to include all parts that I have shown in the 8 steps here and follow them but also show work for the entire problem. Those are all correct I just need the entire worked out problem with all of the work.
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Principles of Geotechnical Engineering (MindTap C...
Civil Engineering
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Cengage Learning
Text book image
Fundamentals of Geotechnical Engineering (MindTap...
Civil Engineering
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning