Concept explainers
(a)
Find the quantity of water flowing through the sample per hour.
(a)
Answer to Problem 7.1CTP
The quantity of water flowing through the sample per hour is
Explanation of Solution
Given information:
The length of each soil layer
The total length of the soil layer H is 600 mm.
The diameter of the cylindrical tube d is 150 mm.
The constant head difference
The porosity of the soil layer I
The porosity of the soil layer II
The porosity of the soil layer III
The hydraulic conductivity of soil layer I
The hydraulic conductivity of soil layer II
The hydraulic conductivity of soil layer III
Calculation:
Determine the hydraulic conductivity in the vertical direction using the relation.
Substitute 600 mm for H, 200 mm for
Determine the hydraulic gradient using the relation.
Here, L is the total length of the soil layer.
Substitute 470 mm for
Determine the area of the cylindrical tube using the relation.
Substitute 150 mm for d.
Determine the rate of seepage per unit length of the dam using the relation.
Substitute
Therefore, the quantity of water flowing through the sample per hour is
(b)
Find the elevation head (Z), pressure head
(b)
Answer to Problem 7.1CTP
The elevation head (
The pressure head
The total head
The elevation head (
The pressure head
The total head
The elevation head (
The pressure head
The total head
The elevation head (
The pressure head
The total head
Explanation of Solution
Given information:
The length of each soil layer
The total length of the soil layer H is 600 mm.
The diameter of the cylindrical tube d is 150 mm.
The constant head difference
The porosity of the soil layer I
The porosity of the soil layer II
The porosity of the soil layer III
The hydraulic conductivity of soil layer I
The hydraulic conductivity of soil layer II
The hydraulic conductivity of soil layer III
Calculation:
Determine the elevation head (
Here,
Substitute 220 mm for
Therefore, the elevation head (
Determine the pressure head
Substitute 470 mm for
Therefore, the pressure head
Determine the total head
Substitute 690 mm for
Therefore, the total head
Determine the elevation head (
Substitute 220 mm for
Therefore, the elevation head (
Determine the value of
Substitute
Determine the total head
Substitute 470 mm for
Therefore, the total head
Determine the pressure head
Substitute 436.3 mm for
Therefore, the pressure head
Determine the elevation head
Substitute 220 mm for
Therefore, the elevation head (
Determine the value of
Substitute
Determine the total head
Substitute 436.3 mm for
The total head
Determine the pressure head
Substitute 432.3 mm for
Therefore, The pressure head
Determine the elevation head
Substitute 220 mm for
Therefore, the elevation head (
Determine the value of
Substitute
Determine the total head
Substitute 432.3 mm for
Therefore, the total head
Determine the pressure head
Substitute 432.3 mm for
Therefore, the pressure head
(c)
Plot the variation of the elevation head, pressure head, and the total head with the horizontal distance along the sample axis (X–X).
(c)
Explanation of Solution
Given information:
The length of each soil layer
The total length of the soil layer H is 600 mm.
The diameter of the cylindrical tube d is 150 mm.
The constant head difference
The porosity of the soil layer I
The porosity of the soil layer II
The porosity of the soil layer III
The hydraulic conductivity of soil layer I
The hydraulic conductivity of soil layer II
The hydraulic conductivity of soil layer III
Calculation:
Refer Part b)
Draw the graph between the elevation head pressure head, and the total head with the horizontal distance along the sample axis (X–X) as in Figure (1).
(d)
Plot the variation of the discharge velocity and the seepage velocity along the sample axis (X–X).
(d)
Explanation of Solution
Given information:
The length of each soil layer
The total length of the soil layer H is 600 mm.
The diameter of the cylindrical tube d is 150 mm.
The constant head difference
The porosity of the soil layer I
The porosity of the soil layer II
The porosity of the soil layer III
The hydraulic conductivity of soil layer I
The hydraulic conductivity of soil layer II
The hydraulic conductivity of soil layer III
Calculation:
Determine the discharge velocity v using the relation.
Substitute
Determine the seepage velocity of soil I using the relation.
Here,
Substitute 0.000843 cm/sec for v and 0.5 for
Determine the seepage velocity of soil II using the relation.
Here,
Substitute 0.000843 cm/sec for v and 0.6 for
Determine the seepage velocity of soil III using the relation.
Here,
Substitute 0.000843 cm/sec for v and 0.33 for
Draw graph of variation of the discharge velocity and the seepage velocity along the sample axis (X–X).
Refer Figure (1) in Part (c).
(e)
Find the height of the vertical columns of water inside piezometers A and B installed on the sample axis.
(e)
Answer to Problem 7.1CTP
The height of the vertical columns of water at point A is
The height of the vertical columns of water at point B is
Explanation of Solution
Given information:
The length of each soil layer
The total length of the soil layer H is 600 mm.
The diameter of the cylindrical tube d is 150 mm.
The constant head difference
The porosity of the soil layer I
The porosity of the soil layer II
The porosity of the soil layer III
The hydraulic conductivity of soil layer I
The hydraulic conductivity of soil layer II
The hydraulic conductivity of soil layer III
Calculation:
The height of water column is equal to the Piezometric or pressure head at a point.
Determine the height of water in point A.
Substitute 656.3 mm for
Therefore, the height of the vertical columns of water at point A is
Determine the height of water in point B.
Substitute 652.3 mm for
Therefore, the height of the vertical columns of water at point B is
Want to see more full solutions like this?
Chapter 7 Solutions
Principles of Geotechnical Engineering (MindTap Course List)
- Q1/ specimen of the fine-grained soil, 75 mm in diameter and 20 mm thick was tested in an oedometer in a laboratory. At applying pressure (240 kN/m²), the time with dial gauge readings are: Time (min) 0 Settlement (mm) 0 0.25 1 0.22 0.42 Vertical pressure (kPa) 15 Settlement (mm) 0.1 Void ratio 1.88 4 0.6 30 0.11 1.87 9 0.71 16 0.79 And the void ratio and settlement for each load increment is shown in the table below. 60 0.21 1.85 120 1.13 1.72 100 1.04 36 64 0.91 0.86 240 2.17 1.57 480 3.15 1.43 1- Find Coefficient of consolidation in cm²/s using root time and TV90% = 0.848. 2- Find Preconsolidation pressure (oc) and compression index (Cc). Scanned by TapScannerarrow_forward(e) A soil profile consists of a clay layer between layers of sand, the water table being in theupper sand layer. Before the construction of a raft foundation for a large reservoir, piezometers were placed in the saturated clay layer. The whole process of filling the reservoir may be approximated to applying rapidly a single pressure increment of 200 kPa uniformly throughout the clay layer. One year after filling the reservoir, the piezometers indicated a distribution of excess porewater pressure as indicated in Figure Q-e. Estimate the average degree of consolidation at this time.arrow_forwardThe data from a falling-head test on a silty clay are: Cross sectional area of soil = 1000 mm^2 Length of soil sample = 200 mm Area of stand pipe = 40 mm^2 Head difference at time t = 0 is 500 mm Head difference at time t = 3 min is 300 mm a) Determine the hydraulic conductivity of the soil in cm/sec. b) What is the head difference at time t = 100 sec in mmarrow_forward
- A soil profile consisting of three layers is shown in the figure. Calculate the values of the total stress, effective stress ad pore waterpressureat points A, B, C, and D for the following cases. In each case, plot the variations with depth. Characteristics of layers 1, 2, and 3 for each case are given belowarrow_forwardProblem 7.6arrow_forwardSubject: Geotechnical engineering- Soil Mechanicsarrow_forward
- The following readings were obtained from an oedometer test on a specimen of saturated clay, see Table 1. The load being held constant for 24 hour before the addition of the next increment. Applied stress 25 50 100 200 400 800 (kN/m2) Thickness 19.60 19.25 18.98 18.61 18.14 17.68 17.24 (mm) Table 1 At the end of the last load period the load was removed and the sample allowed to expand for 24 hour, at the end of which time its thickness was 17.92 mm and its water content found to be 31.8%. The specific gravity of the soil was 2.66. i. Plot the e/o' curve and determine the coefficient of volume compressibility (m,) for an effective stress range of 220-360 kN/m? ii. Plot the e/log ơ' curve and from it determine the compressibility index (Cc) and the pre-consolidation pressure (Oʻpe) ii. Use the data obtained in (i), (ii) and (ii) to obtain and Plot a mlo' curve for the soil iv. compare the values for consolidation settlement for 4 m thick layer of the clay when the average effective…arrow_forwardPlease answer my homework problem. show all work so I can understand. thank you!arrow_forwardHYDRAULIC CONDUCTIVITY PROBLEM 1: The results of a constant head permeability test for a fine sand and sample having a diameter of 150 mm and a length of 150 mm are as follows: Constant head difference = 40 cm Time of collection of water = 83 sec Weight of water collected = 392 g Find the hydraulic conductivity a. 0.094 cm/sec b. 0.01 cm/sec C. c. 0.005 cm/sec d. 0.86 cm/secarrow_forward
- Q1/ specimen of the fine-grained soil, 75 mm in diameter and 20 mm thick was tested in an oedometer in a laboratory. At applying pressure (240 kN/m²), the time with dial gauge readings are: Time (min) 0 Settlement (mm) 0 0.25 1 0.22 0.42 4 9 0.6 0.71 16 0.79 36 64 100 0.86 0.91 1.04 d 1- Find Coefficient of consolidation in cm²/s using root time and TV90% = 0.848. Scanned by TapScannerarrow_forward7. A soil profile consisting of three layers is shown in the figure. Calculate the values of the total stress, effective stress ad pore water pressure at points A, B, C, and D for the following cases. In each case, plot the variations with depth. Characteristics of layers 1, 2, and 3 for each case are given below: Page 3 of 4 Layer 1 Groundwater table Layer 2 Layer 3 Dry sand Sand Clay Rock Layer no. Thickness Soil parameters 1 Y = 110 lb/ft³ 121 Ib/ft H = 7 ft 2 %3D Yat = 3 H, = 6 ft Yeat = 118 lb/ft³ e = 0.7; G, = 2.69 e = 0.55; G, = 2.7 w = 38%;e = 1.2 %3D 1 H = 5 m II, = 8 m %3D 3 H, = 3 m 1 H, = 3 m Y = 16 kN/m 18 kN/m 2 H¸ = 6 m Yat 3 H, = 2.5 m 17 kN/m %3D Ysat %3D 2.arrow_forward1. The figure shows layers of soil in a tube that is 100mm x 100mm in cross – section. Water 3. For a constant head laboratory permeability test on a fine sand, the followi is supplied to maintain a constant head difference of 400mm across the sample. The given: hydraulic conductivities of the soils in the direction of flow through them are as follows: Soil k (cm/sec) Porosity, n Length of specimen 300 mm A 1x 10-2 25% Diameter of specimen 200 mm 3х 103 32% Head difference 400 mm C 4.9 x 10-4 22% Volume of water collected in 4 minutes 420 m3 Void ratio of the soil specimen 0.55 Water supply Continuous supply Overflow Constant head difference = 400 mm 400 mm A B -soil. sample 300 mm Porous plate 150 mm 150 mm Horizontal area of soil sample 200 mm 200 mm a. Calculate the equivalent k in cm/sec. a. Compute the coefficient of permeability in cm/sec. b. Calculate the rate of water supply in cm³/hr. b. Compute the discharge velocity in cm/sec. c. Calculate the seepage velocity through soil C…arrow_forward
- Principles of Geotechnical Engineering (MindTap C...Civil EngineeringISBN:9781305970939Author:Braja M. Das, Khaled SobhanPublisher:Cengage LearningFundamentals of Geotechnical Engineering (MindTap...Civil EngineeringISBN:9781305635180Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning