Convert the given information in the accompanying table from U.S. Customary units to SI units.
Answer to Problem 2P
The conversion of given information in the accompanying table from U.S. Customary units to SI units are tabulated as follows:
Convert from U.S. Customary Units | To SI Units |
Explanation of Solution
Given data:
Refer to Problem 6.2 in textbook for the accompanying table.
Formula used:
Convert hr to s,
Convert foot to meter,
Convert inches to foot,
Convert mile to foot,
Convert km to m,
Convert W to
Convert Btu to
Convert
Convert
Convert
Calculation:
Case 1:
Convert the given value of U.S. Customary units,
Substitute the unit
Reduce the equation as follows,
Substitute the unit
From equation (3) and equation (4), the conversion of given value of U.S. Customary units to SI units are
Case 2:
Convert the given value of U.S. Customary units,
Reduce the equation as follows,
From equation (5), the conversion of given value of U.S. Customary units to SI units is
Case 3:
Convert the given value of U.S. Customary units,
Substitute the unit
From equation (7), the conversion of given value of U.S. Customary units to SI units is
Case 4:
Convert the given value of U.S. Customary units,
Substitute the unit
Substitute the unit
From equation (10), the conversion of given value of U.S. Customary units to SI units is
Case 5:
Convert the given value of U.S. Customary units,
From equation (11), the conversion of given value of U.S. Customary units to SI units is
Case 6:
Convert the given value of U.S. Customary units,
From equation (12), the conversion of given value of U.S. Customary units to SI units is
Conclusion:
Hence, the conversion of given information in the accompanying table from U.S. Customary units to SI units has been explained.
Want to see more full solutions like this?
Chapter 6 Solutions
Engineering Fundamentals: An Introduction to Engineering
- EFUNDAM BAT Three numbers whose sum is 3 form an arithmetic sequence and their squares form a geometric sequence. What is the common difference?arrow_forwardCEFUNDAM BATTERY REVIEW Water evaporates at the rate of two liters per hour per one square meter of surface. How long will it take to evaporate 30 liters of water from a cylindrical swimming pool full of water with 6 m in diameter and 2 m depth? Qarrow_forwardCEFUNDAM BATTERY REVIEW Find the greatest volume possible for a closed cylindrical tank to be made from 115 sq. m. of metal plate.arrow_forward
- CEFUNDAM BATTERY REVIEW SITUATION: For the three identical cylinders whose diameter is 600 position as shown, each weighs 800 N. Assume no friction at any contact surface. Which of the following most nearly gives the force at A, in Newtons? Which of the following most nearly gives the force at D, in Newtons? Which of the following most nearly gives the force at F, in Newtons?arrow_forwardI need detailed help solving this exercise from homework of Foundation Engineering. I do not really understand. Step by step, please.arrow_forward1. Consider a frictionless retaining wall. Assume its surface toward the backfill side is vertical and the soil ground is horizontal. If the retaining wall moves towards backfill, answer the following based on Coulomb's earth pressure theory. (1.1) Show the forces acting on the failure wedge. (1.2) Draw the force polygon for this condition. (1.3) Write down the steps to find the resultant force of earth pressure per unit length of the wall. (1.4) About the Fig. 2, draw a graph showing the relationship between the displacement {u(-) and u(+)} of the retaining wall and the earth pressure, P that acts on that wall. Also, within the graph, indicate the earth pressures, that represent equivalent active and passive earth pressures. Displacement u(-) Retaining wall 0₁ TNT displacement u(+) Failure plane Retaining wall Failure plane 02 a) Active state b) Passive state Figure 2 (1.5) Explain the conditions under which Rankine's earth pressure theory and Coulomb's earth pressure theory become…arrow_forward
- I need detailed help solving this exercise from homework of Foundation Engineering. I do not really understand. Step by step, please.arrow_forwardI need detailed help solving this exercise from homework of Engineering Math. I do not really understand. Step by step, please.arrow_forwardMake stimulation don't use Ai I،will vote your answerarrow_forward
- develop a phased construction schedule with a minimum of 150 activities. You should include a WBS complete with preconstruction/procurement activities as well. All activities should linked with predecessors and successors to allow the software to auto-schedule the work; to start “as soon as possible’. Use January 6, 2025 as a start date. do it based off an elementary school and put detail in the actvities Need help!!!arrow_forwardI need detailed help solving this exercise from homework of Engineering Math. I do not really understand. Step by step, please.arrow_forwardI need detailed help solving this exercise from homework of Engineering Math. I do not really understand. Step by step, please.arrow_forward
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,