Question
Chapter 5, Problem 57P
To determine
Calculate the present worth.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
5-S2 A new recycling sorting and processing line is proposed to serve a medium size city. The
installed cost of the new line is $2,400,000. The residual value after ten years is estimated at
$480,000. The unit would produce recycled material ready for resale at a rate of $0.15/pound,
and would run for ten years. How much recyclable material must be generated every year to
justify the project (i.e., for the present value of the project to be positive). Use an interest rate
of 9%.
Answer is 296,611.
Please show solution.
A)Two options of feed-water storage installation are being considered to serve over 20 years
of useful life:
Option 1: Build a 20,000-gallon tank on a tower. The cost of installing the tank and tower
is estimated to be $170,000. The annual operating and maintenance cost after tax
adjustment is estimated to be $2,000. The salvage value is estimated to be negligible.
Option 2: Place a 20,000-gallon tank of equal capacity on a hill near the refinery. The cost
of installing the tank on the hill, including the extra length of service lines, is estimated to
be $120,000 with negligible salvage value. The annual operating and maintenance cost of
the water tank is estimated to be $1,500 after tax adjustment. Because of the location, an
additional investment of 13,000 in pumping equipment is required. The pumping
equipment is expected to have a service life of 10 years with a salvage value of $2,000 at
the end of that time. The annual operating and maintenance cost (including any incometax…
Chapter 5 Solutions
Contemporary Engineering Economics (6th Edition)
Ch. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - If a project costs 100,000 and is expected to...Ch. 5 - Refer to Problem 5.2, and answer the following...Ch. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Consider the cash flows from an investment...Ch. 5 - Prob. 10P
Ch. 5 - Prob. 11PCh. 5 - Prob. 12PCh. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - Prob. 15PCh. 5 - Prob. 16PCh. 5 - Prob. 17PCh. 5 - Prob. 18PCh. 5 - Consider the project balances in Table P5.19 for a...Ch. 5 - Your RD group has developed and tested a computer...Ch. 5 - Prob. 21PCh. 5 - Prob. 22PCh. 5 - Prob. 23PCh. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Prob. 26PCh. 5 - Prob. 27PCh. 5 - Prob. 28PCh. 5 - Prob. 29PCh. 5 - Prob. 30PCh. 5 - Prob. 31PCh. 5 - Prob. 32PCh. 5 - Geo-Star Manufacturing Company is considering a...Ch. 5 - Prob. 34PCh. 5 - Prob. 35PCh. 5 - Prob. 36PCh. 5 - Prob. 37PCh. 5 - Prob. 38PCh. 5 - Prob. 39PCh. 5 - Prob. 40PCh. 5 - Prob. 41PCh. 5 - Prob. 42PCh. 5 - Two methods of carrying away surface runoff water...Ch. 5 - Prob. 44PCh. 5 - Prob. 45PCh. 5 - Prob. 46PCh. 5 - Prob. 47PCh. 5 - Prob. 48PCh. 5 - Prob. 49PCh. 5 - Prob. 50PCh. 5 - Prob. 51PCh. 5 - Prob. 52PCh. 5 - Prob. 53PCh. 5 - Prob. 54PCh. 5 - Prob. 55PCh. 5 - Prob. 56PCh. 5 - Prob. 57PCh. 5 - Prob. 58PCh. 5 - Prob. 59PCh. 5 - Prob. 1STCh. 5 - Prob. 2ST
Knowledge Booster
Similar questions
- Problem 11.017 Economic Service Life A piece of equipment has a first cost of $180,000, a maximum useful life of 7 years, and a market (salvage) value described by the relation S = 120,000 - 11,000k, where k is the number of years since it was purchased. The salvage value cannot go below zero. The AOC series is estimated using AOC = 60,000+8,000k. The interest rate is 11% per year. Determine the economic service life and the respective AW. The economic service life is year(s) and the AW value is $arrow_forwardCompute the AW (annual worth) of The Bella. Remember to include your calculations in your supporting work. Round your answer to the nearest dollar.arrow_forwardA contractor has purchased a wheel loader for $115,000 and plans to use it for 2,000 hours per day. The cost of one set of tires is $25,000. At this usage rate, the contractor anticipates disposing of the loader after using it for 10 years and realizing a salvage value of $35,000. The flywheel horsepower rating of the loader's diesel engine is 105 horsepower. The interest rate is 10%. The loader operator will earn $34.00 per hour including fringe benefits, and diesel fuel costs $1.20 per gallon. How much is the contractor's hourly ownership cost for the loader if using time value money analysis?arrow_forward
- RR must build a tunnel to maintain his access around the mountain. The tunnel could be fabricated of normal steel for an initial cost of $45,000 and should last for 18 years. Maintenance will cost $1,000 per year.Another option would be to use corrosion resistant steel, which will last for 18 years, with annual maintenance cost of $100. In 18 years there would be no salvage value for either bridge. RR pays combined federal and state taxes at the 48% marginal rate and uses straight-line depreciation. If the after tax MARR is 10%, what is the maximum amount that should be spent on the corrosion-resistant tunnel?arrow_forwardplease help!!arrow_forwardSteve Company is considering replacing one of its machines. The available new model has a cost of $220,000, a 16-year life, and an AOC of $2,000. The machine must also be serviced every 4 years at a cost of $10,000. The machine can be salvaged at $45, 000. The MARR is 12% How much annual net income must be realized from the machine to recover the capital investment?arrow_forward
- Today, you have $30,000 to invest. Two investment alternatives are available to you. One would require you to invest your $30,000 now, the other would require the $30,000 investment two years from now. In either case, the investments will the end five years from now. The cash flows for each alternative are provided below. Using a MARR of 14%, what should you do with the $30,000 you have?arrow_forwardThe following cost and benefit information has been estimated for a pump that has a 10-year useful life. Purchase Cost = $2,400 Annual Operating Cost = $1,200 Annual Maintenance Cost = $300Annual Benefits = $2,000Salvage Value = $200Interest rate specified = 9% or 0.09 Find the capital recovery cost for this pump.arrow_forwardThe following data applies for example problems 8.1 through 8.3. A company is considering the purchase of either machine A or machine B. machine A machine B initial cost $80,000 20 years $20,000 $18,000 per year $100,000 25 years $25,000 $15,000 per year for the first 15 years $20,000 per year for the next 10 years estimated life salvage value other costs The interest rate is 10%, and all cash flows may be treated as end-of-year cash flows. Assume that equivalent annual cost is the value of the constant annuity equal to the total cost of a project. The equivalent annual cost of machine B is most nearly (A) $21,000 (B) $21,500 (C) $23,000 (D) $26,500arrow_forward
- A bridge is to be constructed now as part of a new road. Engineers have determined that current traffic volume on the new road will justify a two-lane road and a bridge at the present time. Because of the uncertainty regarding future traffic, the time at which the additional two lanes will be required is currently being studied. Two alternatives are being considered. Alternative 1 - One-stage construction: Build a four lane bridge right now for $397,000. Alternative 2 - Two-stage construction: Start with a two-lane bridge now for $190,000 and widen to four lanes later when traffic justifies. The future cost of widening the bridge to four-lanes at that time will be $190,000 plus an extra $23,000 for every year that widening is delayed. For example, if future widening is done at the end of year 7, the cost of widening at that time will be equal to $190,000 + 7x($23,000) = $351,000. The following estimates have been made of when widening to a four-lane bridge will be required: Pessimistic…arrow_forwardA bridge is to be constructed now as part of a new road. Engineers have determined that current traffic volume on the new road will justify a two-lane road and a bridge at the present time. Because of the uncertainty regarding future traffic, the time at which the additional two lanes will be required is currently being studied. Two alternatives are being considered. Alternative 1 - One-stage construction: Build a four lane bridge right now for $360,000. Alternative 2 - Two-stage construction: Start with a two-lane bridge now for $170,000 and widen to four lanes later when traffic justifies. The future cost of widening the bridge to four-lanes at that time will be $170,000 plus an extra $23,000 for every year that widening is delayed. For example, if future widening is done at the end of year 7, the cost of widening at that time will be equal to $170,000 + 7x($23,000) = $331,000. The following estimates have been made of when widening to a four-lane bridge will be required: Pessimistic…arrow_forwardA California utility firm is considering building a 50-megawatt geothermalplant that generates electricity from naturally occurring underground heal. The binary geothermal system will cost $85 million to build and $6 million (including any income-tax effect) to operate per year. (Unlike a conventional fossil fuel plant, this system will require virtually no fuel costs.) The geothermal plant is to last 25 years. At the end of that time, the expected salvage value will be about the same as the cost to remove the plant. The plant will be in operation for 70% (the plant-utilization factor) of the year (or 70% of 8,760 hours per year). If the firm's MARR is 14% per year, determine the cost of generating electricity per kilowatt-hour.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education