Contemporary Engineering Economics (6th Edition)
6th Edition
ISBN: 9780134105598
Author: Chan S. Park
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 5, Problem 1ST
To determine
Calculate the present worth.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A machine cost $315,000 to purchase. Fuel, oil, grease, and minor maintenance are
estimated to cost $53.50 per operating hour. A set of tires cost $16,000 to replace, and
their estimated life is 3,100 use hours. A $17,000 major repair will probably be required
after 6,200 hr of use. The machine is expected to last for 9,300 hr, after which it will be
sold at a price (salvage value) equal to 13% of the original purchase price. A final set of
new tires will not be purchased before the sale. How much should the owner of the
machine charge per hour of use, if it is expected that the machine will operate 3,100 hr
per year? The company's cost-of-capital rate is 7.25%.
not use ai please
. A construction company is considering two possibilities for warehouse operations. Proposal 1 would require the purchase of a forklift for $5,000 and 500 pallets that cost $5 each. The average life of a pallet is assumed to be 2 years. If the forklift is purchased, the company must hire an operator for $9,000 annually and spend $600 per year on maintenance and operation. The life of the forklift is expected to be 12 years with a $700 salvage value. Alternatively, proposal 2 requires that the company hire 2 men to operate power driven hand trucks at a cost of $7,500 per man. One hand truck will be required at a cost of $900. The hand truck will have a life of 6 years with no salvage value. If the company's minimum attractive rate of return is 12%, which alternative should be selected? Use the annual equivalent method.
Chapter 5 Solutions
Contemporary Engineering Economics (6th Edition)
Ch. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - If a project costs 100,000 and is expected to...Ch. 5 - Refer to Problem 5.2, and answer the following...Ch. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Consider the cash flows from an investment...Ch. 5 - Prob. 10P
Ch. 5 - Prob. 11PCh. 5 - Prob. 12PCh. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - Prob. 15PCh. 5 - Prob. 16PCh. 5 - Prob. 17PCh. 5 - Prob. 18PCh. 5 - Consider the project balances in Table P5.19 for a...Ch. 5 - Your RD group has developed and tested a computer...Ch. 5 - Prob. 21PCh. 5 - Prob. 22PCh. 5 - Prob. 23PCh. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Prob. 26PCh. 5 - Prob. 27PCh. 5 - Prob. 28PCh. 5 - Prob. 29PCh. 5 - Prob. 30PCh. 5 - Prob. 31PCh. 5 - Prob. 32PCh. 5 - Geo-Star Manufacturing Company is considering a...Ch. 5 - Prob. 34PCh. 5 - Prob. 35PCh. 5 - Prob. 36PCh. 5 - Prob. 37PCh. 5 - Prob. 38PCh. 5 - Prob. 39PCh. 5 - Prob. 40PCh. 5 - Prob. 41PCh. 5 - Prob. 42PCh. 5 - Two methods of carrying away surface runoff water...Ch. 5 - Prob. 44PCh. 5 - Prob. 45PCh. 5 - Prob. 46PCh. 5 - Prob. 47PCh. 5 - Prob. 48PCh. 5 - Prob. 49PCh. 5 - Prob. 50PCh. 5 - Prob. 51PCh. 5 - Prob. 52PCh. 5 - Prob. 53PCh. 5 - Prob. 54PCh. 5 - Prob. 55PCh. 5 - Prob. 56PCh. 5 - Prob. 57PCh. 5 - Prob. 58PCh. 5 - Prob. 59PCh. 5 - Prob. 1STCh. 5 - Prob. 2ST
Knowledge Booster
Similar questions
- A firm is considering the “make vs. buy” question for a subcomponent. If the part is made in-house, the production data would be: first cost = $350, 000; annual costs for operation = $45, 000; salvage value = $15, 000; project life = 5 years; interest = 10%; and material cost per unit = $8.50. If annual production is 10,000 units, the maximum amount that the firm should be willing to pay to an outside vendor for the subcomponent is nearest? (a) $10 per unit (b) $16 per unit (c) $22 per unit (d) $28 per unit?arrow_forwardInternational Machine Manufacturing Company is preparing to build a new plant by considering three potential processes for it. International Machine Manufacturing Company has identified three process alternatives and developed costs as well. The fixed and variable costs for the three alternative processes are presented below. Process A, B and C are the name of three process alternatives. The cost data are as follows: Process A Process B Process C Annual Contracted Units 350,000 350,000 350,000 Annual fixed cost OMR 100,000 OMR 250,000 OMR 550,000 Variable cost (Per Unit) OMR 16 OMR 12 OMR 10 Calculate the following by using the data given: a. Identify the best process to be followed by the International Machine Manufacturing Company. b. Determine the Economical Volume for each process. c. Determine the best process for each of the following volumes: (i) 100,000 (ii) 275,000 (iii) 325,000arrow_forwardFor a motor to operate a pump, a design engineer must choose the horsepower. Horsepower rating is a design characteristic that can vary from 10 to 40 horsepower. The motor will cost $120 per year to operate, plus $0.60 per horsepower. The running expenses of such motors will be $0.055 per horsepower-hour divided by the horsepower rating. Each year, 9,000 horsepower-hours will be required. Determine how much horsepower should be supplied to keep the overall yearly cost to a minimal. Demonstrate that your entire cost each year has been reduced.arrow_forward
- Answer is 7.322 don't know how?arrow_forwardBrawdy Plastics, Inc., produces plastic seat belt retainers for General Motors at their plant in Buffalo, New York. After final assembly and painting, the parts are placed on a conveyor belt that moves the parts past a final inspection station. How fast the parts move past the final inspection station depends upon the line speed of the conveyor belt (feet per minute). Although faster line speeds are desirable, management is concerned that increasing the line speed too much may not provide enough time for inspectors to identify which parts are actually defective. To test this theory, Brawdy Plastics conducted an experiment in which the same batch of parts, with a known number of defective parts, was inspected using a variety of line speeds. The following data were collected. Excel file: data14-05.xlsx Number of Line Defective Speed Parts Found 20 23 20 21 30 19 30 16 40 15 40 17 50 14 50 11 If required onterarrow_forwardd. Calculate the rate of utilization of each option?e. Considering the information calculated, which option is best in your opinion? Is there a third option you could implement?arrow_forward
- Cambridge Instruments is an aircraft instrumentation manufacturer. It has received a contract from the U.S. Department of Defense to produce 30 radar units for a military fighter plane. The first unit took 85 hours to produce. Based on past experience with manufacturing similar units, Cambridge estimates that the learning rate is 93 percent. How long will it take to produce the 5th unit? The 10th? The 15th? The final unit?arrow_forwardA company is about to invest in a joint venture research and development project with another company. The project is expected to last nine years, but yearly payments the company makes will begin immediately (a payment is made today, and the last payment is nine years from today). Salaries will account for $50,000 of each payment. The reminder of each payment will cover equipment costs and facility overhead. The initial (immediate) equipment and facility cost is $50,000. Each subsequent year this figure will drop by $5000 until a cost of $25000 is reached, after which the costs will remain constant until the end of the project. a) Draw a cash flow diagram to illustrate the cash flows for this project. b) At an interest rate of 10%, what is the total future worth of all project payments at the end of the nine years?arrow_forwardABC Corporation will be making a $100,000 payment and a collection of the same amount. The buying spot rate for a USD is P52.10 and the selling spot rate is P52.35. By matching the collection and the payment, ABC was able to make cost savings of how much?arrow_forward
- A perfume company manufactures a single product having a cost of OMR 1.50 per unit. Fixed cost is OMR. 30,000 per annum. The market is such that up to 40,000 units can be sold at a price of OMR 3.00 per unit, but any additional sale must be made at OMR 2.00 per unit. Company has a planned profit of OMR 50,000. 1. What is the revenue at breakeven point? 2. What is the number of units at breakeven point? 3. How many units must be made and sold?arrow_forwardA contractor has an excavator requiring repairs within her fleet of cquipment for executing projects. She is offered $6,000 for the equipment by another contractor but refuses to sell. Other financial details of the excavator are as follows: Repair cost of $4,000 Useful life of 5 years At the end of year 1, the operation and maintenance cost is pegged at $2.000. This value increases by $1,000, S1,200, S1,400, and $1,600 for the following years. At the end of year 1, the salvage value is pegged at $6,000. This value decreases by 25% for the following years. The minimum acceptable rate of return (MARR) is 12%. Due to the constant use and operation and maintenance required, determine how long this equipment should be kept by the contractor. N.B. SHOW THE DETAILED WORKINGS FOR EACH YEAR. DO NOT STOP AT YEAR AFTER THE ECONOMIC LIFE.arrow_forwardSolve for Rate of return method with cashflow diagram.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education