Interpretation: The cycle time required for output rate needs to be determined.
Concept Introduction: Constraint management is a process helpful to the personnel on focusing the task. As a result, the productivity and the profits also increased.
B
Interpretation: The minimum number of workstations required needs to be determined.
Concept Introduction: Constraint management is a process helpful to the personnel on focusing the task. As a result, the productivity and the profits also increased.
C
Interpretation: The efficiency and the balance delay need to be determined.
Concept Introduction: Constraint management is a process helpful to the personnel on focusing the task. As a result, the productivity and the profit also increased.
D
Interpretation: Increasing cycle time would increase theoretical minimum
Concept Introduction: Constraint management is a process helpful to the personnel on focusing the task. As a result, the productivity and the profits also increased.
Want to see the full answer?
Check out a sample textbook solutionChapter 5 Solutions
OPERATIONS MANAGEMENT CUSTOM ACCESS
- An assembly plant for the Blood Pressure RX, a portable blood pressure device, has 400 minutes available daily in the plant for the device, and the average demand is 80 units per day. Final assembly requires 6 separate tasks. Information concerning these tasks is given in the following table. Task Performance Time (minutes) Task Must Follow Task Listed Below A 4 - B 1 - C 1 A, B D 3 C E 4 D F 2 E b) Given the demand, what is the cycle time for this operation? The cycle time for this operation is enter your response here minutes/unit (enter your response as a whole number). c) What is the theoretical minimum number of workstations? The theoretical minimum number of workstations is enter your response here stations (enter your response as a whole number and, if your unrounded answer includes decimal values,…arrow_forwardTailwind, Inc., produces high-quality but expensive training shoes for nmners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide morestability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 60. The information for the tasks is as follows: a) Draw the precedence diagram.b) Assign tasks to thl e minimum feasible number of workstations according to the "ranked positioned weight" decision rule.c) What is the efficiency of the process you completed in (b)?d) What is the idle time per cycle?arrow_forwardGordon Miller's job shop has four work areas, A, B, C, and D. Distances in feet between centers of the work areas are: Workpieces moved per week between work areas are: A C ABCD A A It costs Gordon $1 to move 1 work piece 1 foot. The weekly total material handling cost of the layout= $ (enter your response as a whole number). B T B 900 C 8 7 C 800 400 D 6 11 D 500 400 700 Darrow_forward
- How do bottlenecks increase the work in process inventory of manufacturing plants?arrow_forwardCapacity analysis can not be performed without determining bottleneck time and throughput time. Differentiate between these terms with suitable example?arrow_forwardDetermine the resources needed and cost for training of 200 sales agents for launching Project X, which has been decomposed in activities marketing training, ordering process training, and suitable training site. Training classes are eight hours long for activities A and B. The resources required for A and B include the following. One conference room for training, which can hold 10 trainees and one trainer. One marketing trainer and one ordering process trainer for a full day of training (i.e., four hours per day for each trainer). The cost for each trainer is $50 per hour. The cost of the training site is $100 per hour. Choose all the apply: 1. The marketing trainer is required for 20 session each four hours long. 2. The ordering process trainer is required for 20 session each four hours long. 3. The number of sessions required for activity A is 20 sessions. 4. The number of sessions required for ordering process training is 20 sessions. 5. The total cost for the…arrow_forward
- The resources (workers) and processing times (mins per unit) for 3 activities in a production system are shown below. Resources: Processing time: Activity 1 1- 2 worker A 12 min/unit Activity 2 1 worker B 5 min/unit Activity 3 4 worker C 15 min/unit a) What is the capacity (throughput) of each activity and the complete production system? Comment on how Activity A impacts on the entire system. b) What is the average WIP level when the system is at full capacity (apply Littles Law)?arrow_forwardThe three capacity planning methods and capacity requirements planning (CRP), load work centers vertically Without regard to work center capacities (called infinite capacity planning). Advanced planning and scheduling systems (APS) load work centers horizontally recognizing work center capacities (using finite capacity planning) order by order. Briefly describe how a new order would be loaded/scheduled using horizontal loading.arrow_forwardThere is a canteen set up serving food (Breakfast, Lunch, Snacks-tea, and Dinner) to 500 students in a B school. It has a huge well-furnished dining hall and has a serving zone where students queue to pick up their eatables. The Institute director, during his regular Gemba walks in the canteen, has seen a lot of inefficiency in the related operational processes and needs a major improvement. (a)Provide one relatable and relevant example of five of the eight wastes under Lean systems which are likely to be witnessed in the canteen. (b)Recommend lean tools & techniques/system solutions to be employed for curbing each of those five wastes with a line on justification. (c) Suggest three key enablers and measures track the progress on lean in the canteen.arrow_forward
- A manager wants to assign tasks to workstations as efficiently as possible and achieve an hourly output of 331/3 units. Assume the shop works a 60-minute hour. Assign the tasks shown in the accompanying precedence diagram (times are in minutes) to workstations using the following rules: A. In order of most following tasks. Tiebreaker: greatest positional weight. Work Station Task I II III IV b. In order of greatest positional weight. Tiebreaker: most following tasks. Work Station Tasks I II III IV c. What is the efficiency? (Round your answer to 2 decimal places.) Efficiency _________%arrow_forwardManufacturing Company uses FIFO method of accumulating costs in a two-department process. Materials are introduced at the inception of the process except for a special material which is added in department 2 at 60% completion as to overhead. Inspection is done at the end of the process in both departments. Production data for Department 2 are given below: In process, beginning, (80% labor, 70% overhead)2,000 Transferred in 14,900 In process, ending (40% labor, 20% overhead) 3,000 Normal spoilage 200 Abnormal spoilage (found at 30% completion as to laborand 15% as to overhead due to internal failure) 400 Cost data for the month:In process beginning:Transferred in 15,020 Special materials 1,900 Direct labor 4,388 Overhead 11,044 Current costs:Transferred in 137,080 Special materials 14,030 Direct labor 46,000 Overhead 113,564 The cost of units transferred to finished goods is?The cost of spoilage charged to revenue is?arrow_forward6arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.