Why is it recommended that the estimator begin a takeoff of concrete work by measuring the quantity of concrete in an item rather than the amount of formwork?
The reason recommended for the estimator to begin a takeoff of concrete work by measuring the quantity of concrete in an item rather than the formwork amount.
Explanation of Solution
Taking off concrete work must start with the estimator measuring the concrete as the actual concrete descriptions are usually given on the drawings, whereas the details of the formwork are not given. The estimator can then review the needs for the formwork by measuring and estimating the volume of concrete needed followed by the requirements of finishing.
Since only the area of forms in contact with the concrete is measured, at the time of the takeoff, the estimator does not have to review the descriptions of the forms design.
Want to see more full solutions like this?
Chapter 5 Solutions
MindTap Construction for Pratt's Fundamentals of Construction Estimating, 4th Edition [Instant Access], 2 terms (12 months)
- exact answerarrow_forwardQ2: For the overhanging beam BD shown, draw the "Influence Lines" for RB, RD S.F. at C (VC) and B.M. at C (Mc) using the static equilibrium method. A B 4 m 5 m 7 marrow_forwardQ1: Draw N.F.D, S.F.D and B.M.D for the frame shown below. Knowing that t support at A is hinge, and at D is roller. B 2 m 5 kN/m C 30 kN 2 D 5 marrow_forward
- please the correct answerarrow_forwardQ1: Draw N.F.D, S.F.D and B.M.D for the frame shown below. Knowing that the support at A is hinge, and at D is roller. br Section C-D) 5 kN/m MC = 30x2) + (Dx *4) D لاک 15 B 2 m 2 m 30 kN DA DX 2 marrow_forwardQ2: For the overhanging beam AC shown, draw the "Influence Lines" for RA, RC, S.F. at B (VB) and B.M. at B (MB) using the static equilibrium method. 2 m B AC D 2 m 3 marrow_forward
- answerrarrow_forwardanwer pleasearrow_forwardCurrent Attempt in Progress The bell-crank mechanism is in equilibrium for an applied load of F₁ = 16 kN applied at A. Assume a = 330mm, b = 190mm, c = 75mm, and 0 = 35°. Pin B is in a double-shear connection and has a diameter of 32 mm. The bell crank has a thickness of 24 mm. Determine (a) the shear stress in pin B. (b) the bearing stress in the bell crank at B. Bell crank Support bracket- Answers: Tpin Bi B a b MPa Ob = i MPaarrow_forward
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Construction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage LearningArchitectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage Learning
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,Residential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781285852225Author:Gregory W FletcherPublisher:Cengage LearningEngineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning