
To list:
The ways an agile MIS infrastructure supports BOX’s business.

Explanation of Solution
Box offers cloud data storage services of 50 GB. Consumers can access their files from anywhere. User can create accounts on Box easily and collaborate with co-workers by using computer, phones, or any other device with internet access.
An agile MIS infrastructure helps in supporting the changes in business needs with time. An agile MIS consists of software, hardware and telecommunications equipment which provides the foundation to support organization’s goals. An agile MIS can provide following characteristics for Box:
Accessibility: An agile MIS can support BOX’s business by defining its accessibility at various level. It can help define how users will access, view or perform operational functions.
Availability: An agile MIS will make sure that the application is available to users during different time frames and there is no downtime for the application.
Maintainability: In case of any environmental changes, agile MIS will make sure that BOX’s system transforms in timely manner to support those changes.
Portability: An agile MIS will make sure that BOX is able to operate on different software platforms and devices.
Reliability: An MIS will make sure that Box operate correctly and there are not data integrity issues.
scalability: An MIS will help the BOX’s business to grow with the increased number of users and increased requirements of storage capacity.
Usability: An agile MIS will make the BOX’s application easy to use, efficient and satisfactory for the user.
Want to see more full solutions like this?
Chapter 5 Solutions
Business Driven Information Systems
- Need help with this in python!arrow_forward. The average soil weights for a clay are the following: 2,050 pounds in Loose CY, 2,675pounds in Bank CY, and 2,835 pounds in Compacted CY What is the swell percentage for theclay?arrow_forwardA traffic count taken between 7:00 a.m. and 2:00 p.m. on a rural highway found the following hourly volumes. Time 7:00-8:00 a.m. Hourly volume 332 8:00-9:00 a.m. 311 9:00-10:00 a.m. 263 10:00-11:00 a.m. 273 11:00 a.m.-12:00 p.m. 289 12:00-1:00 p.m. 1:00-2:00 p.m. 286 265 If these data were collected on a Tuesday in February, estimate the AADT (in veh/day) on this section of highway. Assume that the expansion factors given in this table, this table, and this table apply. veh/dayarrow_forward
- A project schedule has been updated. The activity placement of spread footing concretewas originally scheduled to begin as early as day 10. The activity duration is 4 days. The actualstart day was day 12. The original schedule had a calculated total float of 7 days for this activity.The recalculated total float for the activity, when updated, would bearrow_forwardNeed help with this in python!arrow_forwardIn preparation for a public hearing, an engineer needs to estimate the travel time savings for a proposed highway bypass of a small city in a rural area. The existing highway goes through the downtown area for 4.1 miles between the points where the bypass will connect. (a) If the engineer anticipates a standard deviation of 7 mi/h and would like a 95% confidence of estimating the mean speed within ±4 mi/h, how many runs should a travel time study include? (Enter the minimum number of runs that achieves a 95% confidence level.) runs (b) If the engineer measures an average speed of 34.9 mi/h through the town and the bypass is expected to operate at speeds of 65 mi/h over a distance of 6.2 miles, what is the expected travel time saving (in minutes) per vehicle? minutes Need Help? Read It Watch Itarrow_forward
- Help! How do I turn the flowchart that searches for a name in an array of names into structured and spaced pseudocode?arrow_forwardDatabasearrow_forwardA Si step junction maintained at room temperature under equilibrium conditions has a p-side doping of NA 2X1015/cm³ and an n-side doping of ND=1015/cm³. Compare a) Vbi b) Xp, Xn, and W c) ɛ at x=0 d) V at x=0 Make sketches that are roughly to scale of the charge density, electric field, and electrostatic potential as a function of position.arrow_forward
- follow the instructions and make sure to right the complete solutionarrow_forwardThe mail merge process has ____ steps. Question 19Select one: a. five b. six c. seven d. eightarrow_forwardIf you created a main document based on an existing document entitled "Confirmation Letter," what default filename would Word give the main document? Question 14Select one: a. Confirmation Letter-1 b. Confirmation Letter-merge c. Document1 d. MergedDocument1arrow_forward
- MATLAB: An Introduction with ApplicationsEngineeringISBN:9781119256830Author:Amos GilatPublisher:John Wiley & Sons IncEssentials Of Materials Science And EngineeringEngineeringISBN:9781337385497Author:WRIGHT, Wendelin J.Publisher:Cengage,Industrial Motor ControlEngineeringISBN:9781133691808Author:Stephen HermanPublisher:Cengage Learning
- Basics Of Engineering EconomyEngineeringISBN:9780073376356Author:Leland Blank, Anthony TarquinPublisher:MCGRAW-HILL HIGHER EDUCATIONStructural Steel Design (6th Edition)EngineeringISBN:9780134589657Author:Jack C. McCormac, Stephen F. CsernakPublisher:PEARSONFundamentals of Materials Science and Engineering...EngineeringISBN:9781119175483Author:William D. Callister Jr., David G. RethwischPublisher:WILEY





