Sales of tablet computers at Ted Glickman’s electronics store in Washington, D.C., over the past 10 weeks are shown in the table below:
a)
b) Compute the MAD.
c) Compute the tracking signal.
a)

To determine: To forecast the demand for 10 weeks using exponential smoothing.
Introduction: A sequence of data points in successive order is known as time series. Time series forecasting is the prediction based on past events, which are at a uniform time interval. Exponential smoothing is one of the time series methods which use a smoothing constant to emphasis past data.
Answer to Problem 59P
Using exponential smoothing, the forecast for week 10 is done.
Explanation of Solution
Given information:
Week | Demand |
1 | 20 |
2 | 21 |
3 | 28 |
4 | 37 |
5 | 25 |
6 | 29 |
7 | 36 |
8 | 22 |
9 | 25 |
10 | 28 |
Formula to calculate the forecasted demand:
Where,
Calculation to forecast demand using exponential smoothing:
Week | Demand | Ft |
1 | 20 | 20 |
2 | 21 | 20 |
3 | 28 | 20.50 |
4 | 37 | 24.25 |
5 | 25 | 30.63 |
6 | 29 | 27.81 |
7 | 36 | 28.41 |
8 | 22 | 32.20 |
9 | 25 | 27.10 |
10 | 28 | 26.05 |
Excel worksheet:
Calculation of the forecast for week 2:
To calculate the forecast for week 2, substitute the value of forecast of week 1, smoothing constant and difference between actual and forecasted demand in the above formula. The result of forecast for week 2 is 20.
Calculation of the forecast for week 3:
To calculate the forecast for week 3, substitute the value of forecast of week 1, smoothing constant and difference between actual and forecasted demand in the above formula. The result of forecast for week 3 is 20.50.
Calculation of the forecast for week 4:
To calculate the forecast for week 4, substitute the value of forecast of week 3, smoothing constant and difference between actual and forecasted demand in the above formula. The result of forecast for week 4 is 24.25.
Calculation of the forecast for week 5:
To calculate the forecast for week 5, substitute the value of forecast of week 4, smoothing constant and difference between actual and forecasted demand in the above formula. The result of forecast for week 5 is 30.63.
Calculation of the forecast for week 6:
To calculate the forecast for week 6, substitute the value of forecast of week 5, smoothing constant and difference between actual and forecasted demand in the above formula. The result of forecast for week 6 is 27.81.
Calculation of the forecast for week 7:
To calculate the forecast for week 7, substitute the value of forecast of week 6, smoothing constant and difference between actual and forecasted demand in the above formula. The result of forecast for week 7 is 28.41.
Calculation of the forecast for week 8:
To calculate the forecast for week 8, substitute the value of forecast of week 7, smoothing constant and difference between actual and forecasted demand in the above formula. The result of forecast for week 8 is 32.20.
Calculation of the forecast for week 9:
To calculate the forecast for week 9, substitute the value of forecast of year 8, smoothing constant and difference between actual and forecasted demand in the above formula. The result of forecast for week 9 is 27.10.
Calculation of the forecast for week 10:
To calculate the forecast for week 10, substitute the value of forecast of year 9, smoothing constant and difference between actual and forecasted demand in the above formula. The result of forecast for week 10 is 26.05.
Thus, using exponential smoothing, the forecast for week 10 is done.
b)

To determine: To compute MAD.
Answer to Problem 59P
MAD is 4.99.
Explanation of Solution
Given information:
Week | Demand |
1 | 20 |
2 | 21 |
3 | 28 |
4 | 37 |
5 | 25 |
6 | 29 |
7 | 36 |
8 | 22 |
9 | 25 |
10 | 28 |
Formula to calculate MAD:
Calculation of MAD:
Week | Demand | Ft | Absolute error |
1 | 20 | 20 | 0 |
2 | 21 | 20 | 1 |
3 | 28 | 20.50 | 7.50 |
4 | 37 | 24.25 | 12.75 |
5 | 25 | 30.63 | 5.63 |
6 | 29 | 27.81 | 1.19 |
7 | 36 | 28.41 | 7.59 |
8 | 22 | 32.20 | 10.20 |
9 | 25 | 27.10 | 2.10 |
10 | 28 | 26.05 | 1.95 |
Total | 49.91 | ||
MAD | 4.99 |
Table 1
Excel worksheet:
Calculation of the absolute error for week 2:
The absolute error for week 1 is the modulus of the difference between 21 and 20, which corresponds to 1. Therefore, the absolute error for week 2 is 1.
Calculation of the absolute error for week 3:
The absolute error for week 3 is the modulus of the difference between 28 and 20.50, which corresponds to 7.50. Therefore, the absolute error for week 3 is 7.50.
Calculation of the absolute error for week 4:
The absolute error for week 4 is the modulus of the difference between 37 and 24.25, which corresponds to 12.75. Therefore, the absolute error for week 4 is 12.75.
Calculation of the absolute error for week 5:
The absolute error for week 5 is the modulus of the difference between 25 and 30.63, which corresponds to 5.63. Therefore, the absolute error for week 5 is 5.63.
Calculation of the absolute error for week 6:
The absolute error for week 6 is the modulus of the difference between 29 and 27.81, which corresponds to 1.19. Therefore, the absolute error for week 6 is 1.19.
Calculation of the absolute error for week 7:
The absolute error for week 7 is the modulus of the difference between 36 and 28.41, which corresponds to 7.59. Therefore, the absolute error for week 7 is 7.59.
Calculation of the absolute error for week 8:
The absolute error for week 8 is the modulus of the difference between 22 and 32.20, which corresponds to 10.20. Therefore, the absolute error for week 8 is 10.20.
Calculation of the absolute error for week 9:
The absolute error for week 9 is the modulus of the difference between 25 and 27.10, which corresponds to 2.10. Therefore, the absolute error for week 9 is 2.10.
Calculation of the absolute error for week 10:
The absolute error for week 10 is the modulus of the difference between 28 and 26.05, which corresponds to 2.10. Therefore, the absolute error for week 10 is 2.10.
Calculation of the Mean Absolute Deviation:
The substitution of the summation value of absolute error for 10 weeks, divided by the number of weeks, which is 10 yields a MAD of 4.99.
The computed MAD is 4.99.
c)

To determine: To compute the tracking signal.
Answer to Problem 59P
The tracking signal is 2.82.
Explanation of Solution
Given information:
Week | Demand |
1 | 20 |
2 | 21 |
3 | 28 |
4 | 37 |
5 | 25 |
6 | 29 |
7 | 36 |
8 | 22 |
9 | 25 |
10 | 28 |
Formula to calculate tracking signal:
Calculation of tracking signal:
Table 1 shows the calculation of MAD
Week | Demand | Ft | Absolute error | Error | Cumulative error |
1 | 20 | 20 | 0 | 0 | 0 |
2 | 21 | 20 | 1 | 1 | 1 |
3 | 28 | 20.50 | 7.50 | 7.5 | 8.50 |
4 | 37 | 24.25 | 12.75 | 12.75 | 21.25 |
5 | 25 | 30.63 | 5.63 | -5.63 | 15.63 |
6 | 29 | 27.81 | 1.19 | 1.19 | 16.81 |
7 | 36 | 28.41 | 7.59 | 7.59 | 24.41 |
8 | 22 | 32.20 | 10.20 | -10.20 | 14.20 |
9 | 25 | 27.10 | 2.10 | -2.10 | 12.10 |
10 | 28 | 26.05 | 1.95 | 1.95 | 14.05 |
Total | 49.91 | ||||
MAD | 4.99 | Tracking signal | 2.82 |
Excel worksheet:
Calculation of tracking signal:
The ratio of cumulative error and MAD is known as the tracking signal. The tracking signal of 2.82 is obtained by dividing 14.05 by 4.99.
Hence, the computed tracking signal is 2.82.
Want to see more full solutions like this?
Chapter 4 Solutions
PRIN.OF OPERATIONS MANAGEMENT-MYOMLAB
- Do you feel there is anything positive about rework?arrow_forwardDo you think technology can achieve faster setup times? How would it be implemented in the hospital workforce?arrow_forwardIn your experience or opinion, do you think process changes like organizing workspaces make a bigger difference, or is investing in technology usually the better solution for faster setups?arrow_forward
- Have you seen rework done in your business, and what was done to prevent that from occurring again?arrow_forwardResearch a company different than case studies examined and search the internet and find an example of a business that had to rework a process. How was the organization affected to rework a process in order to restore a good flow unit? Did rework hurt a process or improve the organization's operational efficiency? • Note: Include a reference with supportive citations in the discussion reply in your post.arrow_forwardSetup time is very important in affecting a process and the capacity of a process. How do you reduce setup time? Give examples of reducing setup time. Please Provide a referenecearrow_forward
- Do you think TPS was successful? If so, how? Are there other companies that have used TPS? If so, give examples. Please provide a referencearrow_forwardGiven the significant impact on finances, production timelines, and even equipment functionality, as you pointed out, what do you believe is the most effective single strategy a company can implement to significantly reduce the occurrence of rework within their operations?arrow_forwardDurban woman, Nombulelo Mkumla, took to social media last week to share how she discovered the rodent.In a lengthy Facebook post, she said she purchased the loaf of bread from a local shop after work on August 27.For the next days, Mkumla proceeded to use slices of bread from the load to make toast."Then, on the morning of August 31, I took the bread out of the fridge to make toast and noticed something disgusting andscary. I took a picture and sent it to my friends, and one of them said, 'Yi mpuku leyo tshomi' [That's a rat friend]“."I was in denial and suggested it might be something else, but the rat scenario made sense - it's possible the rat got into thebread at the factory, and no one noticed," Mkumla said.She went back to the shop she'd bought the bread from and was told to lay a complaint directly with the supplier.She sent an email with a video and photographs of the bread.Mkumla said she was later contacted by a man from Sasko who apologised for the incident.According to…arrow_forward
- PepsiCo South Africa says the incident where a woman discovered part of a rodent in her loaf of bread, is anisolated occurrence.Durban woman, Nombulelo Mkumla, took to social media last week to share how she discovered the rodent.In a lengthy Facebook post, she said she purchased the loaf of bread from a local shop after work on August 27.For the next days, Mkumla proceeded to use slices of bread from the load to make toast."Then, on the morning of August 31, I took the bread out of the fridge to make toast and noticed something disgusting andscary. I took a picture and sent it to my friends, and one of them said, 'Yi mpuku leyo tshomi' [That's a rat friend]“."I was in denial and suggested it might be something else, but the rat scenario made sense - it's possible the rat got into thebread at the factory, and no one noticed," Mkumla said.She went back to the shop she'd bought the bread from and was told to lay a complaint directly with the supplier.She sent an email with a video and…arrow_forwardDurban woman, Nombulelo Mkumla, took to social media last week to share how she discovered the rodent.In a lengthy Facebook post, she said she purchased the loaf of bread from a local shop after work on August 27.For the next days, Mkumla proceeded to use slices of bread from the load to make toast."Then, on the morning of August 31, I took the bread out of the fridge to make toast and noticed something disgusting andscary. I took a picture and sent it to my friends, and one of them said, 'Yi mpuku leyo tshomi' [That's a rat friend]“."I was in denial and suggested it might be something else, but the rat scenario made sense - it's possible the rat got into thebread at the factory, and no one noticed," Mkumla said.She went back to the shop she'd bought the bread from and was told to lay a complaint directly with the supplier.She sent an email with a video and photographs of the bread.Mkumla said she was later contacted by a man from Sasko who apologised for the incident.According to…arrow_forwardRead the project statement and answer ALL of the questions that follow PROJECT STATEMENT The African Integrated High-Speed Railway Network (AIHSRN). African nations are preparing to invest billions in a significant overhaul of their rail infrastructure as part of an ambitious plan for the continent. One of the key projects underway is the African Integrated High-Speed Railway Network (AIHSRN), which aims to connect Africa's capital cities and major commercial centres with a high-speed railway network to enhance continental trade and competition. This network will span 2,000 km (1,243 miles) and connect 60 cities, including Nairobi, Lagos, Cairo, and Dakar. It will improve access to essential markets, enhance economic cooperation, and encourage regional collaboration. The plan is poised to revolutionise intra-African trade by reducing travel times and lowering transportation costs, making trade between African nations more competitive. The trains will be capable of reaching speeds of up…arrow_forward
- Contemporary MarketingMarketingISBN:9780357033777Author:Louis E. Boone, David L. KurtzPublisher:Cengage LearningMarketingMarketingISBN:9780357033791Author:Pride, William MPublisher:South Western Educational PublishingPractical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage Learning


