Chapter 4, Problem 23P
To determine
The number of additional parking bays in the parking lot.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
QUESTION 3
Q2-B) For safety purposes, the mall has decided to build an exclusive pedestrian walkway so the bus users can reach the mall without going through the parking area. If you were asked to design this walkway and were provided with the following design data and criteria:
• Desired level of service is LOS B
• Average pedestrian speed = 3.5 km/hr.
• Pedestrian peak hour volume in peak direction = 973 pedestrians.
• No pedestrian platooning was observed; and
• The grade of the walkway is assumed to be level.
Determine the minimum reguired width of the walkway
Design and explain an automatic transport parking system with the the following attributes.
a) maintaining count of vehicles enter in parking area.
suggest any five (5) ways by which severe traffic congestion may be minimised
Chapter 4 Solutions
Traffic and Highway Engineering
Knowledge Booster
Similar questions
- One street segment has parking stalls on both sides. Estimate the minimum segment length from the street corner if the city engineer tries to provide 75 parking stalls within the segment using AASHTO typical street parallel parking guidelines with the longest typical stall length.arrow_forwardsuggest the required pedestrian and vehicle facilities which may minimize the occurrence of traffic accident.arrow_forwardB. What are the major factors affecting accidents rates at the intersectionarrow_forward
- The following cross-section notes of the road was examined to calculate volumes. The width of the roadway is 12m -12 -3 -6 4 +6 -6 +24 -9 STA 5+040 +6 -15 -4.5 -6 -6 30 -12 -7 -8 STA 5+140 Compute the volume between two stations using end area method.arrow_forwardScheduled maintenance will close two of the four westbound lanes of a freeway during one weekday for the period from 9:00 AM to 4:00 PM. The demand on the two lanes are as follows: Time Demand, vph 9:00-10:00 AM 4000 10:00-11:00 AM 3500 11:00-12:00 NN 2500 12:00-1:00 PM 2000 1:00-2:00 PM 2000 2:00-3:00 PM 2000 3:00-4:00 PM 2000 If the estimated capacity of the 4 lanes with 2 lanes open is 2960 vph, a. compute the time when maximum queue occurs. 11:00 AM b. compute the maximum queue formed. 1580 vehicles c. compute the maximum length of queue if the average length of cars is equal to 5 meters. 1975 m Show all necessary diagrams and solutions.arrow_forwardWhen using the parking space hour supply equation, you must take into account efficiency of the facility during its highest demand period. What is the average efficiency factor that must use if you are addressing curb parking? youarrow_forward
- Q5a. Otwebeweate has been selected as the capital of a newly created district. As the new District Engineer, the Chief and the elders of the town approach you and make a request for the installation of a traffic light at one of the key intersections with the reason that there is no single traffic signal in the town and the installation of one will lift the status of the town as a district capital. What will be your decision and how will you explain it to the Chief and eldersarrow_forwardWhat are your three alternatives for reducing the delays caused by traffic? Which of these two options is superior, and why?arrow_forwardi need correct solution asap in 20 minsarrow_forward
- Please kindly answer 32,33 and 34.. please answer all. Note: this is not an assignment question and not a graded questionarrow_forwardramps within 3 miles upstream and downstream of the segment midpoint. It is on rolling terrain with 10% heavy vehicles and is operating at capacity with a peak-hour factor of 0.9. If the road is expanded to four 11-foot lanes with a 2-foot right shoulder, and traffic after the expansion is projected to increase by 10% with the same heavy vehicle percentage and peak-hour factor, what is the new LOS and estimated density? P-22 Chapter 6 Problems hour. What would be the LOS before and after the heavy vehicles are allowed on the upgrade (assuming 50% SUTs and 50% TTs.)? 6.21 A multilane highway has four lanes (two lanes in each direction) and a measured FFS of 55 mi/h. The directional peak-hour volume is 1900 vehicles (the peak-hour factor is 0.80). One upgrade is 5% and is 0.62 mi long. Currently, heavy vehicles are not permitted on the highway, but local authorities are considering allowing heavy vehicles on this upgrade. If this is done, they estimate that 150 heavy vehicles will use…arrow_forwardWHEN SHOULD TRAFFIC IMPACT ASSESSMENT BE PREPARED?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning