Manufacturing Engineering & Technology
7th Edition
ISBN: 9780133128741
Author: Serope Kalpakjian, Steven Schmid
Publisher: Prentice Hall
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 38, Problem 10RQ
Describe the features of a routing sheet. Why is it necessary?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
5 ĝ © T /
4. Discuss the potential benefits and problems with the use of outsourcing as a part of a
supply chain strategy as used in any company of your choice.
Add a caption...
> Status (Custom)
Task 3: In the context of maintenance costing, planning, and scheduling, clarify the following:
What are the general categories of potential maintenance costs? Please provide examples for each
category. Also, link this to the field trip you participated in at Al-Nabil factory and explain how these
costs are calculated.
Explain the practical meaning of the Work Order System for maintenance planning. Please discuss how
this approach is used at Al-Nabil Factory. Additionally, emphasize the importance of maintenance
planning and its impact on the overall productivity of the plant.
Clarify the maintenance inventory management system used at Al-Nabil factory? Please explain its
ultimate significance in terms of the factory's availability and overall maintenance costs.
Clarify the maintenance inventory management system adopted in Al-Nabil factory and its ultimate
significance in terms of factory's availability and the overall maintenance costs.
7. What is the difference between a basic process and a secondary process? 8. What is a route sheet?
Chapter 38 Solutions
Manufacturing Engineering & Technology
Ch. 38 - In what ways have computers had an impact on...Ch. 38 - Describe the benefits of computer-integrated...Ch. 38 - What is a database? Why is it necessary?Ch. 38 - What is an STL file? What is it popularly used...Ch. 38 - What are the differences between the terms...Ch. 38 - Prob. 6RQCh. 38 - What do the following abbreviations mean:...Ch. 38 - Prob. 8RQCh. 38 - Describe the purposes of process planning. How...Ch. 38 - Describe the features of a routing sheet. Why is...
Ch. 38 - What are the advantages of simulation of...Ch. 38 - What is group technology? Why was it...Ch. 38 - Explain the three types of GT coding:...Ch. 38 - Describe what is meant by the term...Ch. 38 - What does classification and coding mean in...Ch. 38 - Prob. 16RQCh. 38 - Describe your observations regarding Figs. 38.1...Ch. 38 - Prob. 19QLPCh. 38 - Give examples of primitives of solids other than...Ch. 38 - Describe your understanding of the octree...Ch. 38 - Explain the logic behind the arrangements shown...Ch. 38 - Prob. 23QLPCh. 38 - What is the difference between a variant system...Ch. 38 - Referring to Fig. 38.3, explain the advantages ofa...Ch. 38 - Prob. 26QLPCh. 38 - Describe situations that would require a design...Ch. 38 - Prob. 28QLPCh. 38 - How would you describe the principle of...Ch. 38 - Review various manufactured parts illustrated in...Ch. 38 - Think of a simple part and make a decision-tree...Ch. 38 - Review the machine arrangements in Fig. 38.12...Ch. 38 - Think of a simple product and make a routing...Ch. 38 - Review Fig. 38.9, and prepare a routing sheet for...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Similar questions
- Why is it necessary to build and keep inventory in place? How group technology can be incorporated in inventory management?arrow_forwarddescribe the difference of the Direct Numerical Control technology and Distributed Numerical Control technology.arrow_forwardPlease don't provide handwritten solution ....arrow_forward
- a) Consider an AS/RS machine in an aisle that is 280 ft long and 70 ft high. The I/O point is in the lower left corner, and the S/R machine travels at 300 ft/min horizontally and 100 ft/min vertically. The time required to pick up or drop off a load is 0.8 minutes. Assuming a single command operation, find the total cycle time in minutes and the throughput in operations per hour. b) Complete part a, assuming dual command operation.arrow_forwardWhat kind of Layout is suitable for an automotive crane manufacturer?Express in your own views in detail and justifyarrow_forwardWhat is the importance of “Fixturing” a part for a robot application such as assembly?arrow_forward
- Major appliances are assembled on a production line at the rate of 50/h. The products are moved along the line on work pallets (one product per pallet). At the final workstation the finished products are removed from the pallets. The pallets are then removed from the line and delivered back to the front of the line for reuse. Automated guided vehicles are used to transport the pallets to the front of the line, a distance of 153 m. Return trip distance (empty) to the end of the line is also 153 m. Each AGV carries three pallets and travels at a speed of 61 m/min (loaded or empty). The pallets form queues at each end of the line, so that neither the production line nor the AGVs are ever starved for pallets. Time required to load each pallet onto an AGV = 15 s; time to release a loaded AGV and move an empty AGV into position for loading at the end of the line = 12 s. The same times apply for pallet handling and release/positioning at the unload station located at the front of the…arrow_forwardIdentify the different tools bars and workspaces in AutoCAD.arrow_forwardWhat is an Mechanical Plan?arrow_forward
- How does serpentine robots may affect an industry?arrow_forwardThe table below lists the time estimates and immediate predecessor(s) for each activity in a product marketing project that is to be scheduled using CPM. Similar projects for other products have been accomplished in the past, so the activity times are fairly certain. (a) Draw the CPM network diagram for the project, labeling all activities and times. (b) Perform a forward pass and backward pass through the network to determine the critical path, the expected duration of the project, and the slack time for each activity. Activity 1 3 4 5 7 8 9 Activity time (days) 1 3 7 5 6 9. 4 Immediate predecessor 1 1 1 2 3,4 5,6 4 7,8 Solve the preceding problem but use an estimated activity time of 4 days instead of 2 days for activity 6. 6. 2. 2.arrow_forwardSUBJECT ; INDUSTRIAL CONTROL PLEASE PROVIDE CLEAR EXPLAINATION , THANK YOU IN ADVANCEarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Elements Of ElectromagneticsMechanical EngineeringISBN:9780190698614Author:Sadiku, Matthew N. O.Publisher:Oxford University PressMechanics of Materials (10th Edition)Mechanical EngineeringISBN:9780134319650Author:Russell C. HibbelerPublisher:PEARSONThermodynamics: An Engineering ApproachMechanical EngineeringISBN:9781259822674Author:Yunus A. Cengel Dr., Michael A. BolesPublisher:McGraw-Hill Education
- Control Systems EngineeringMechanical EngineeringISBN:9781118170519Author:Norman S. NisePublisher:WILEYMechanics of Materials (MindTap Course List)Mechanical EngineeringISBN:9781337093347Author:Barry J. Goodno, James M. GerePublisher:Cengage LearningEngineering Mechanics: StaticsMechanical EngineeringISBN:9781118807330Author:James L. Meriam, L. G. Kraige, J. N. BoltonPublisher:WILEY
Elements Of Electromagnetics
Mechanical Engineering
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Oxford University Press
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:9780134319650
Author:Russell C. Hibbeler
Publisher:PEARSON
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:9781259822674
Author:Yunus A. Cengel Dr., Michael A. Boles
Publisher:McGraw-Hill Education
Control Systems Engineering
Mechanical Engineering
ISBN:9781118170519
Author:Norman S. Nise
Publisher:WILEY
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:9781337093347
Author:Barry J. Goodno, James M. Gere
Publisher:Cengage Learning
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:9781118807330
Author:James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:WILEY
Types of Manufacturing Process | Manufacturing Processes; Author: Magic Marks;https://www.youtube.com/watch?v=koULXptaBTs;License: Standard Youtube License