Chapter 34, Problem 1RQ
To determine

The first five level of automation obtained by replacing the human attribute.

Expert Solution & Answer
Check Mark

Explanation of Solution

The first five-level of automation which is obtained from the human attribute,

  1. The first level of automation is represented as which replaces the effort of the human joint with the use of lever, screw, and pulley is used in the machine.
  2. The second level of automation is represented as which replaces the energy of the human muscle with electrical power.
  3. The third level of automation is represented as which replaces the human dexterity with the use of the self-feeding or automatic machine.
  4. The fourth level of automation is represented as which replaces the diligence of humans with the open-loop feedback numeric control.
  5. The fifth level of automation is represented which replaces the human capability of judgment with the use of closed-loop feedback numeric control.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
I.   Describe the space that can be mapped by a gripper attached to a Gantry Robot (draw a sketch if necessary)? [2]J. In technical terms, what does Robot Manipulator Configuration mean?
Using signavio or any PBM tools and must Use pool and lane and object.  Model the following business process at a supplier. After a supplier notifies a retailer of the approval of a purchase order, the supplier can receive an order confirmation, an order change, or an order cancelation from the retailer. It may happen that no response is received at all. If no response is received after 48 h, or if an order cancelation is received, the supplier will cancel the order. If an order confirmation is received within 48 h, the supplier will process the order normally. If an order change is received within 48 h, the supplier will update the order and ask again the retailer for confirmation. The retailer is allowed to change an order at most three times. Afterwards, the supplier will automatically cancel the order.
3. a) Differentiate between NC and CNC system and the applications of CNC.b) What are G-codes and M-codes in CNC part programming  and refer
Knowledge Booster
Background pattern image
Mechanical Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Welding: Principles and Applications (MindTap Cou...
Mechanical Engineering
ISBN:9781305494695
Author:Larry Jeffus
Publisher:Cengage Learning
The Robot Revolution: The New Age of Manufacturing | Moving Upstream; Author: Wall Street Journal;https://www.youtube.com/watch?v=HX6M4QunVmA;License: Standard Youtube License