Engineering Economy, Student Value Edition (17th Edition)
17th Edition
ISBN: 9780134838137
Author: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 3, Problem 7P
To determine
Calculate the estimated cost.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Sally Statistics is implementing a system of statistical process control (SPC) charts in her factory in an effort to reduce the overall cost of scrapped product. The current cost of scrap is $X per month. If a 75% learning curve is expected in the use of the SPC charts to reduce the cost of scrap, what would the percentage reduction in monthly scrap cost be after the charts have been used for 6 months? (Hint: Model each month as a unit of production.)
Homeowner Henry is building a fireplace for his house. The fireplace will require 2500 bricks. (a) If the cost of a Chimney Brick in 2007 was $2.10, calculate the material cost of Henry’s project in 2020. The Chimney Brick Index (CBI) was 442 in 2007 and is expected to be 651 in 2020. (b) Estimate the material cost of a similar fireplace to be built in the year 2023. What assumption did you make?
As a manager have been asked to estimate the total cost of producing
40 engines in your company. Current engines have an output of 135-hp
per engine. 7 years ago, a similar 180-hp engine cost was 4450 KD.
Beside that due to extreme competition in the industry, the cost of an
engine has decreased with 9% only for 3 intervals of time throughout
this period. Total cost consists of engine cost, direct labor cost and
other labor-related costs. Pertinent data are as follows:
Direct labor cost per hour
20 KD per hour
Factory overhead
150% of direct labor
Packing costs
80% of direct labor
Maintenance costs
10% of engine cost
Cost-capacity factor
0.75
Past experience has shown that an 85% learning curve applies to the
labor required producing these engines. Maintenance cost will be paid
only once at the beginning of the second year. Use the estimated time
to complete the 40th engine for the purpose of estimating the direct
labor cost. The time to complete the first engine has been estimated to…
Chapter 3 Solutions
Engineering Economy, Student Value Edition (17th Edition)
Ch. 3 - A green (environmentally friendly) office building...Ch. 3 - You are planning to build a new home with...Ch. 3 - Prob. 3PCh. 3 - Prob. 4PCh. 3 - Prob. 5PCh. 3 - Prob. 6PCh. 3 - Prob. 7PCh. 3 - Prepare a composite (weighted) index for housing...Ch. 3 - Prepare a composite (weighted) index for housing...Ch. 3 - Prob. 10P
Ch. 3 - Prob. 11PCh. 3 - Prob. 12PCh. 3 - Prob. 13PCh. 3 - The capital investment cost for a...Ch. 3 - The capacity of a switch grass-fueled ethanol...Ch. 3 - Prob. 16PCh. 3 - The time to assemble the first unit on a...Ch. 3 - Prob. 18PCh. 3 - For the data below (3.4 .3) a. Find the regression...Ch. 3 - A company that manufactures shuttle cars and mines...Ch. 3 - Prob. 21PCh. 3 - Prob. 22PCh. 3 - Prob. 23PCh. 3 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 28SECh. 3 - Prob. 31CSCh. 3 - Prob. 32CSCh. 3 - Prob. 36FECh. 3 - Prob. 37FECh. 3 - Prob. 38FECh. 3 - Prob. 39FECh. 3 - Prob. 40FECh. 3 - Prob. 41FE
Knowledge Booster
Similar questions
- Garber Furniture manufactures beds selling for $529 each. Variable costs per unit are $187 for direct material, $165 for direct labor, $44 for variable production overhead, and $15 for variable selling and administrative costs. Annual fixed costs for production overhead are $200,000 and for selling and administrative costs $124,000. What is the number of units required to breakeven? 2,436 units 2,492 units 1,831 units 2,746 units 612 units Onone of the above / listedarrow_forwardThe total plant cost for manufacturing CO2 warning devices that have a compact gas detector and a signaling unit is $1,154,400. If the overall costfactor for the plant was 2.61, the delivered equipment cost was closest to:a. $442,300b. $501,200c. $593,700d. $613,900arrow_forwardThe costs of producing a certain commodity consist of 125.00 per unit for labor and material cost and 320.00 per unit for other variable cost. The unit can be sold at 1,200.00. If the production capacity per month is 5,200 units, what maximum fixed amount can the company spend each month of breakeven? Answer: 3,926,000.00 Explain every process.arrow_forward
- The ABC Manufacturing Company incurs an annual fixed cost of $100,000 to maintain its production facilities. Additionally, the variable cost per unit produced is $10. If the company produces and sells 5,000 units in a year, what is the total annual cost?arrow_forwardA certain task can be performed by the executive, working alone, in 4 hours. If he delegates the task to his secretary t will require him 30 minutes to explain the work and another 45 minutes to check the finished work. Due to the unfamiliarity of the secretary to do the Task it takes her an additional time of 6 hours after being instructed. Considering salary cost only, determine the cost of performing the task by each method, if the secretary works 2,400 hours a year and the executive 3,000 hours a year. handwritten solutionsarrow_forwardThe cost of constructing an 8000 ft2 warehouse was $400,000. The ENR construction cost index was 6770 at that time. The cost of constructing asimilar building using an ENR index of 9088 is closest to:a. less than $450,000b. $537,000c. $672,000d. more than $700,000arrow_forward
- A certain index for the cost of purchasing and installing utility boilers is keyed to 1988, where its baseline value was arbitrarily set at 100. Company XYZ installed a 50,000-lb/hour boiler for $525,000 in 2000 when the index had a value of 468. This same company must install another boiler of the same size in 2017. The index in 2017 is 542. What is the approximate cost of the new boiler?arrow_forwardSolve the attachmentarrow_forwardA manufacturing company needs to know whether to produce components for a Bird Feeder in-house or buy the components from a fabricator. To make the components in-house, the company needs to buy an injection molding machine, which costs $9,000. The company expects to produce 10,000 units per year. The following estimates have been made: Fixed cost per year Variable cost per part Make $9,000 $6.45 Buy. $0 $7.20 a. What is the break-even point? b. If the number of units produced is 10,000, which option is cheaper: Make or Buy? Explain why. b. If the number of units produced is increased to 12,500, which option is cheaper: Make or Buy? Explain why.arrow_forward
- A manufacturer produces certain items at a labor cost of P 115 each, material cost of P 76 each and variable cost of P 2.32 each. If the item has a unit price of P 600, how many units must be manufactured each month for the manufacturer to break-even if the monthly overhead is P 428,000.arrow_forwardhow did they calculate (Q2/Q1)?arrow_forwardCost analysis Tech engineering is making a product for overseas market. The following cost data for the product has been compiled. Item Selling price Materials and purchased parts $25/unit Direct Labor (per unit) Fixed Cost a) Calculate the breakeven volume for this product Cost $135 2 hrs at $20 per hour $1,400,000 b) What is the profit per unit if 30000 units are sold c) To reduce the breakeven volume to 15000 Units, what should be the selling pricearrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Economics: Applications, Strategies an...EconomicsISBN:9781305506381Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. HarrisPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage Learning
Managerial Economics: Applications, Strategies an...
Economics
ISBN:9781305506381
Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. Harris
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning